| 1 | Providing of all materials, Carting from site store to site of work, Laying & jointing of G.I. Screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting threading and testing of pipe line etc complete. |
| 2 | 50 mm dia (M) (Supply main) |
| 3 | 40 mm dia (M) |
| 4 | 32 mm dia (M) |
| 5 | 25 mm dia (M) |
| 6 | 20 mm dia (M) |
| 7 | 15 mm dia (M) |
| 8 | Excavation for pipe line in trenches etc. including lift upto 1.5 M lead upto 30 m including fitting watering remming and removal of surplus earth up to 60 m from trenches. |
| 9 | Soil mixing (assuming 10% open) |
| 10 | Making connection with the existing M.S. Galvanised mains of upto 25mm nominal dia, including cutting and threading of pipe, bailing out water, fixing, if required, specials and testing etc. complete, but excluding cost of insertion pipes and specials besides boring out (and also subsequent back fill) existing main. |
| 11 | 15mm-25mm |
| 12 | Supplying and fixing of following size of valves including carting the same upto site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and construction of chamber. |
| 13 | 50mm dia |
| 14 | 40mm dia |
| 15 | 32 mm dia |
| 16 | 25 mm dia |
| 17 | 20 mm dia |
| 18 | 15 mm dia |
| 19 | Supply of all materials T&P etc. and construct of chamber as per type design for wheel valve chamber (0.60 x 0.60 x 0.60 Mtr.) |
| 20 | Supply of all materials for construction of soakage pits for Camping area & Stand Post |
| 21 | 1.20 x 1.20 x 1.20 Size |
| 22 | Supply of all materials and fixing of fire hydrant and dismentlling the same after mela. (80mm dia, Stand post type) |
| 23 | Supply of all materials, all labour for construct of Stand posts including plateform and drain for disposal of waste water. |
| 24 | Dismantling of following dia screwed and socketed G.I. Pipes, specials and fitting including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50m but excluding the cost of earth work (Note:- This Item shall be paid with the condition that the recovered pipe from dismantling is reusable.) |
| 25 | Excavation of pipe line trenches in soil mixed with boulders |
| 26 | Dismentaling of Pipe line as per item no. 13 |
| 27 | 50 mm dia (M) (Supply main) |
| 28 | 40 mm dia (M) |
| 29 | 32 mm dia (M) |
| 30 | 25 mm dia (M) |
| 31 | 20 mm dia |
| 32 | 15 mm dia (M) |
| 33 | Supply of Water testing Kits and other instruments required for proper testing of drinking water during kumb Mela including testing of Water Sample. |
| 34 | Sign Caution board including painting and writing etc. complete for publicity. |
| 35 | Repairing of existing water line due to damaged in excavation of pipe line including all material, labour T&P etc. |
| 36 | Provision of Staff for operation and maintenance of work including operating Staff, labour, temporary Staff etc. |
| 37 | 4 Beldar x 30x 4 Month |
| 38 | 1 Fitterx30x4 Month |
| 39 | Provision for bleaching powder including supply, cartage and mixing. |
| 40 | Supply and fixing of chlorine dozer (as per matket) |
| 41 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. 2000 Ltr x 05 No. = 10000 Ltr. |
| 42 | Making of MS Plate Form for fixing of PVC Tank 2000 Ltr. Capacity. |
| 43 | Painting and writhing on PTSP including Supply of all materials and labour, T&P etc. |
| 44 | Painting and Apex of two coat including all materials, labour T&P etc. complete for Intake Well. |
| 45 | P.C.C. 1:2:4 including all materials, labour T&P etc. complete for along pipe line. |
| 46 | Supply of Tanker for 2 month and 1 Tanker per Day @3000/ Tanker |
| 47 | Mini Tube well / Handpump (02 Nos.) |
| 48 | Transportation of suitable truck mounted ODEX drilling rig machine with all necessary connection T&P required for drilling including installation and leveling of Rig machine etc.complete in all respect as per direction of Engineer incharge. |
| 49 | Drilling of bores as per IS 2800-1979 using ODEX 115 (Tubex) attachment required drilling in alluvial, boulder, pebbles, gravel, rockey stone, sticky clay etc. including cost of attachement consumable stores, bits, water POL etc.complete with system of simultaneous lowering of 125 mm nominal bore 5.4 mm thick MSERW fin cut casing pipe complete in all respect as per direction of Engineer-In-charge. |
| 50 | Supply & Fixing of 125 mm dia 5.4 mm thick as per IS 1239/4270 MSERW fin cut casing pipe from approved manufacturers complete in all respect. |
| 51 | Supply and fixing of suitable Casing shoe of EN-24 Steel as per requirement of ODEX Attachment complete in all respect. |
| 52 | Supply & Fixing of HDPE riser pipe 32 mm dia |
| 53 | Development of tubewell by suitable air compressor to give sand free discharge to satisfaction of engineer in charge. |
| 54 | SITC of pumping plant |
| 55 | Submersible pump motor set single phase 40 lpm, 60 m head, 2 hp (01 no as spare) |
| 56 | Starter cum panel (fully automatic) for above pump set 2 hp |
| 57 | Submersible cable copper conductor 3 core, 2.5 sq mm |
| 58 | Lowering of pump set and installation of pumping plants etc. |
| 59 | Supply of Chlorinator Dozer pumps of suitable capacity with acessories of above pump set as following- |
| 60 | Injector and NRV with PVC pipes etc. |
| 61 | 200 Ltr.Capacity PVC tank. |
| 62 | Starter cum panel |
| 63 | Single phase automatic stabilizer |
| 64 | Chlorine testing kit |
| 65 | Supply of Sodium hypo-chloride (Naocl) solution. |
| 66 | Supply, laying, jointing etc 40 mm dia GI pipes for rising main line upto distribution system |
| 67 | Construction temporary shed/operator room for installation of electrical equipments |
| 68 | Provision of temporary electrical connection including supply of 2 core power cable etc complete |
| 69 | Expenditure on electricity consumption during running of tubewell for a period of 6 months Please Enable Macros to View BoQ information |