| 1 | A. DRILLING PORTIONDrilling in all kinds of soil and rock in rural areas for installation of India Mark II hand pump with D.T.H. rig all complete, including supplying all materials, labours, tools, drilling rig, air compressor and equipment as well as fuel, lubricants for making 125mm/ 115mm dia boring and cost of transportation of rig machine and other vehicles up to the work site as per specification and direction of E/I. (a) Up to 30 mtr depth bellow G.L. |
| 2 | (b) Beyond 30 mtr up to 60 mtr. depth below G.L. |
| 3 | Supplying all materials, labours,tools,equipments and lowering 125mm dia UPVC pipes as casing for protecting the sides from falling during the process of drilling all complete including their carriage to the work sites. |
| 4 | Supplying all materials such as cement and calcium chloride or bentonite solution, labours, tools, equipments etc.and grouting the bore sides after lowering the casing pipes in the bore etc. all complete as per specification and direction of E/I. |
| 5 | Supplying all tools, equipments and labour and doing washing, flushing and developing the drilled bore to give clean and clear water all complete as per direction of E/I. |
| 6 | Supplying all materials, labours, tools and equipments and fitting and fixing 125mm dia. G.I. Cap over the tube well properly and taking it out after installation of pump set as per direction of E/I. (The cap will be the property of contractor) |
| 7 | B. CIVIL PORTIONSupplying all tools, equipment , labours and jointing materials and lowering 32 mm dia G.I. riser pipes in 3 mtr. lengths in the drilled bore all complete job as per direction of E/I. |
| 8 | Providing all labours, tools and plants, jointing materials etc. and fitting and fixing deep well cylinderx, chrome leather bucket etc. all complete job as per specification and direction of E/I. |
| 9 | Providing all labours for fitting and fixing of India Mark II Hand Pump including supplying all tools and plants required for the job all complete as per direction of E/I. |
| 10 | Supplying all materials, labours, tools and equipment and constructing PCC (1:2:4) circular platform around each drilled tube well including 12mm thich cement plaster (1:4) with neat cement punning over exposed surfaces as per UNICEF design. |
| 11 | Supplying all materials, labour, tools and equipment and constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete . |
| 12 | Supplying tools, labours and materials for painting, numbering and year for construction of T.wells and taking of colour photograph with 2 or 3 nearest persons including platform, drain, soakpit and also longitude and latitude, deatils of t/wells such as total depth, casing depth, static water level, drawdown, discharge, strata chart, benificiary population etc in separate sheet/format. All complete as per direction of E/I. |
| 13 | C. COST OF MATERIALSCost of ISI Marked India Mark II Hand Pump (complete set)confirming to IS.9301/90 with amendment. No 1 to 6 all complete with all accessories including 8 no. connecting rods each 3.0 m. long including all taxes carriage to work site and contractor's profit etc. all complete job. |
| 14 | Cost of 32 mm dia medium class GI pipes in 3 Mtrs lengths screwed at both ends with seamless socket as per IS:1239(Part 1990) including all taxes carriage to work site and contractor's profit etc. all complete job. |
| 15 | Cost of 125mm dia (140mm O.D.) Blue UPVC Casing Pipes including all taxes carriage to work site and contractor's profit etc. all complete job.etc. all complete job. |
| 16 | Goods & Services Tax (G.S.T.) - 18% |
| 17 | Labour Cess - 1% Please Enable Macros to View BoQ information |