Tender For Repair/Replacement, Cleaning, Maintenanace And Allied Works Of Deep Trunk Line, Main Lines And Associated Sewage Manholes Of Central Sewage System At Sector B Under Ge (U) Ambala Cantt., Ambala-Haryana
TDR : 55563807
Tender Notice
BOQ
21 Days Left
Ambala
Haryana
Tender For Repair/Replacement, Cleaning, Maintenanace And Allied Works Of Deep Trunk Line, Main Lines And Associated Sewage Manholes Of Central Sewage System At Sector B Under Ge (U) Ambala Cantt.
Name of Work:- Repair/replacement, cleaning, maintenanace and allied works of Deep Trunk line, Main lines and associated sewage manholes of central sewage system at Sector B under GE (U) Ambala Cantt.
Sl. No.
Item Description
1
Cleaning of under ground EXISTING SEWAGE DEEP TRUNK LINE SGSW/RCC/HDPE pipe line of any dia of pipes and any depth including manholes of any size working/running conditions involving removal of blockages of any kind of sewage lines and manholes by means of Heavy truck mounted High pressure Suction Cum Jetting Machine including desludging, descaling and dechoking of lines whereever required, flushing the entire stretch with water making the stretch clean and funtional. Removal & depositing any type of sludge/debries to excavated area, spreading necessary Insecticides where sludge is deposited complete all as specified and directed .
2
Cleaning of under ground EXISTING SEWAGE SGSW/RCC/HDPE pipe line of any dia of pipes and any depth including manholes of any size working/running conditions involving removal of blockages of any kind of sewage lines and manholes by means of Heavy truck mounted High pressure Suction Cum Jetting Machine or Tata magic mounted Desilting Machine as required at site including desludging, descaling and dechoking of lines whereever required, flushing the entire stretch with water making the stretch clean and funtional. Removal & depositing any type of sludge/debries to excavated area, spreading necessary Insecticides where sludge is deposited complete all as specified and directed.
3
Material and Labour for Cleaning and removing of blockage from Manholes manually where Desilting machine not reachable of any size and upto 1.5m depth incl removing the soil, roots or any other materials from the manholes working/running conditions and flushing the entire stretch with water making the stretch clean and functional. Removal & depositing any type of sludge/debries to excavated area, spreading necessary Insecticides where sludge is deposited complete all as specified and directed .
4
All as per Srl item No. 3.00 here-in-before but depth exceeding 1.5 metre and not exceeding 3.0 metre .
5
All as per Srl item No. 3.00 here-in-before but depth exceeding 3.0 metre and above .
6
Dewatering the septic tank/ Soakage well/ Sludge chamber of any depth/area/condition incl taking out stagnated water or any other material mixed with the sludgey water etc, deposited in the septic tank/ Soak well/ Sludge chamber, filling in closed container and depositing in excavated pit, covering the pit at least 500m beyond nearby living accn or area as marked by station controlling authority with earth after depositing sludge, sprinkling fresh lime on covered pit and around septic tanks/ soakage wells to make it hygienic complete all as specified and directed.
7
Cleaning the septic tank/ Soak well/ Sludge chamber of any depth/area/condition incl taking out stagnated sludge or any other material mixed with the sludge or sand in abandoned septic tank/ Soak well/ Sludge chamber etc deposited in the Soak Well/ septic tanks, filling in closed container and depositing in excavated pit, covering the pit at least 500m beyond nearby living accn or area as marked by station controlling authority with earth after depositing sludge, sprinkling fresh lime on covered pit and around septic tanks/ soakage wells to make it hygienic complete all as specified and directed.Note:- Depth of sludge measured after dewatering the septic tank/ Soak well/ Sludge chamber Please Enable Macros to View BoQ information
8
Cleaning the septic tank/ Soak well/ Sludge chamber of any depth/area/condition incl taking out stagnated sludge or any other material mixed with the sludge or sand in abandoned septic tank/ Soak well/ Sludge chamber etc deposited in the Soak Well/ septic tanks, filling in closed container and depositing in excavated pit, covering the pit at least 500m beyond nearby living accn or area as marked by station controlling authority with earth after depositing sludge, sprinkling fresh lime on covered pit and around septic tanks/ soakage wells to make it hygienic complete all as specified and directed.Note:- Depth of sludge measured after dewatering the septic tank/ Soak well/ Sludge chamber Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.