Name of Work:- PROVN OF EVALUATING K VALUE (SOIL TESTING) FOR THE EXTERNAL PORTION OF TAXI TRACK AT AF STN AGRA
Sl. No.
Item Description
1
M&L for mobilization of necessary equipment & manpower at site of work to carry out plate load test for determination of ‘K’ value or CBR values as required of soil in the field in accordance to IS 9214-1979, complete in all respect, as specified & directed with & including following operation:-(a) Digging out pit of desired size & depth.(b) Placing & arranging the load platform, loading & unloading platform by sand bags or any other approved weights, as per requirement & recording the settlement data with 03 Nos of dial gauge in horizontal plain placed at 120 degree, using hydraulic jack with proving ring & dial gauze of least count 0.002 mm & submission of report in sixtuplicate determing modulus of subgrade reaction ‘K’ value or by any other recommended method as approval by IS code complete all as specified and directed by the engineer in charge. (c) Any other activity required for ‘K’ value test or CBR value test. Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs)
2
M&L for mobilization of necessary equipment & manpower at site of work to carry out plate load test for determination of ‘K’ value or CBR values as required of soil in the field in accordance to IS 9214-1979, complete in all respect, as specified & directed with & including following operation:-(a) Digging out pit of desired size & depth.(b) Placing & arranging the load platform, loading & unloading platform by sand bags or any other approved weights, as per requirement & recording the settlement data with 03 Nos of dial gauge in horizontal plain placed at 120 degree, using hydraulic jack with proving ring & dial gauze of least count 0.002 mm & submission of report in sixtuplicate determing modulus of subgrade reaction ‘K’ value or by any other recommended method as approval by IS code complete all as specified and directed by the engineer in charge. (c) Any other activity required for ‘K’ value test or CBR value test. Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs)
3
2.0 Total amount of credit schedule 0.0 Signature of contractor AGE (Contracts) For ACCEPTING OFFICER
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.