| 1 | The work of Instalation Additional 250 KVA Distribution Transformers, construction of plinth & pale fencing for 250 KVA T/Fs and installation of the same on the double pole structure/plinths at selected 16+02 Nos. places under BUSINESS PLAN SCHEME 2026-27 under EUDD, BANDA/EDD, BANDA, including carriage of all required material/Transformers from ESC/Workshop BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- | The work of Instalation Additional 250 KVA Distribution Transformers, construction of plinth & pale fencing for 250 KVA T/Fs and installation of the same on the double pole structure/plinths at selected 16+02 Nos. places under BUSINESS PLAN SCHEME 2026-27 under EUDD, BANDA/EDD, BANDA, including carriage of all required material/Transformers from ESC/Workshop BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- |
| 2 | Supply of following materials :- | Supply of following materials :- |
| 3 | Alluminium Lug long barrel off size as per RESSPO manual. | Alluminium Lug long barrel off size as per RESSPO manual. |
| 4 | MS Dropper Channel 100x50x2028 mm. as per RESSPO manual. | MS Dropper Channel 100x50x2028 mm. as per RESSPO manual. |
| 5 | Clamps for LT T-off with bolts & nuts as per RESSPO manual. | Clamps for LT T-off with bolts & nuts as per RESSPO manual. |
| 6 | Holding Clamp for top channel, TPMO & fuse set etc. with bolt-nuts as per RESSPO manual. | Holding Clamp for top channel, TPMO & fuse set etc. with bolt-nuts as per RESSPO manual. |
| 7 | MS Top Channel (125x65x2240 mm) as per RESSPO manual. | MS Top Channel (125x65x2240 mm) as per RESSPO manual. |
| 8 | MS T-off Channel (125x65x1300 mm) as per RESSPO manual. | MS T-off Channel (125x65x1300 mm) as per RESSPO manual. |
| 9 | Copper L-Piece 50x225x10 mm as per RESSPO manual. | Copper L-Piece 50x225x10 mm as per RESSPO manual. |
| 10 | Barbed wire for jumper as per RESSPO manual. | Barbed wire for jumper as per RESSPO manual. |
| 11 | 11 KV Danger Board with clamp as per RESSPO manual. | 11 KV Danger Board with clamp as per RESSPO manual. |
| 12 | Red Oxide Paint as per RESSPO manual. | Red Oxide Paint as per RESSPO manual. |
| 13 | Alluminium Paint as per RESSPO manual. | Alluminium Paint as per RESSPO manual. |
| 14 | Erection/Instalation/Fixing of following :- | Erection/Instalation/Fixing of following :- |
| 15 | Safe cartage of 11 Mtr. long ST poles from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. | Safe cartage of 11 Mtr. long ST poles from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 16 | Safe cartage of line material viz. conductor, cable, G.I. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of its dragging. | Safe cartage of line material viz. conductor, cable, G.I. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of its dragging. |
| 17 | Erection of Double support on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. | Erection of Double support on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. |
| 18 | Grouting of Double support on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). | Grouting of Double support on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). |
| 19 | Erection and grouting of stay set with nozelling & binding as per norms. | Erection and grouting of stay set with nozelling & binding as per norms. |
| 20 | Fixing of earthing rod as per RESSPO manual. | Fixing of earthing rod as per RESSPO manual. |
| 21 | Laying, stringing, binding and termination etc. LT PVC Cable Al. of size 1x240 Sq.mm. on the newly erected D/P as per direction of supervising engineer/RESSPO manual. | Laying, stringing, binding and termination etc. LT PVC Cable Al. of size 1x240 Sq.mm. on the newly erected D/P as per direction of supervising engineer/RESSPO manual. |
| 22 | Safe cartage of 250 KVA Transformers from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging. | Safe cartage of 250 KVA Transformers from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging. |
| 23 | Installation/Erection/Commisioning of 250 KVA Transformers on the newly/old erected doube pole/plinth structure in proper alignment and as per direction of supervising engineer/RESSPO manual. | Installation/Erection/Commisioning of 250 KVA Transformers on the newly/old erected doube pole/plinth structure in proper alignment and as per direction of supervising engineer/RESSPO manual. |
| 24 | Painting of ST Pole Structure (DP) with Alluminium Paint as per RESSPO manual. | Painting of ST Pole Structure (DP) with Alluminium Paint as per RESSPO manual. |
| 25 | Painting of ST Pole Structure (DP) with Red Oxide Paint as per RESSPO manual. | Painting of ST Pole Structure (DP) with Red Oxide Paint as per RESSPO manual. |
| 26 | Fixing of T-Off Channel with fitting of all accessories as per RESSPO manual. | Fixing of T-Off Channel with fitting of all accessories as per RESSPO manual. |
| 27 | Fixing of 11 KV Fuse set with fitting of all accessories as per RESSPO manual. | Fixing of 11 KV Fuse set with fitting of all accessories as per RESSPO manual. |
| 28 | Fixing of Danger Board with fitting of all accessories as per RESSPO manual. | Fixing of Danger Board with fitting of all accessories as per RESSPO manual. |
| 29 | Construction of new 11/0.4 kV, 250 KVA Transformer plinth of size 2x2x1.5 M. above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly. After that a retaining wall of 9” width by first class brick in ratio 1:5 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. Jail of 12 mm MS tore shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer. | Construction of new 11/0.4 kV, 250 KVA Transformer plinth of size 2x2x1.5 M. above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly. After that a retaining wall of 9” width by first class brick in ratio 1:5 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. Jail of 12 mm MS tore shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer. |
| 30 | Construction of toe wall with wire mesh or Pale fencing & painting of Sub-Stations, detail of the work as given below (All fencing/painting material arranged by contractor at his own cost):-1- Construction of toe wall 9\\" wide 1' high above ground, all around the plinth/DP structure in 1:6 ratio of cement and coarse sand. The toe wall shall have pocket of 1200 mm size at the center of toe wall at appropriate places for grouting of MS Angle iron frames toe wall may very as per site conditions.2- Grouting & fixing of MS Angle iron frame in 1:2:4 ratio of cement, stone grit & coarse sand and bolting the frames with at joining frames by 35x8 mm bolt with nut. The size of MS Angle Iron frame may very as per requirement of site.3- Fabrication & Providing Gate in front of plinth/DP made in two leaves of size 900x1500 mm each. Each leave shall be made by MS Angle iron of 37x37x5 mm MS Angle and fitted with wire mesh or pale fencing of 18 SWG with the help of MS Strip of 35x5 mm size welded all around the frame. The leaves shall be fitted with hinges on MS Angle of size of 50x50x6 mm and shall have locking arrangement. Two gates shall be provided on such sub-station where more than one T/F are installed and that shall be counted two sub-stations.4- Fixing & Grouting of main gate at S.No. 1.03 made of MS Angle iron frame of 37x37x5 mm and 50x50x6 mm in the ratio 1:2:4 of cement, stone grit & coarse sand in front of DP/Plinth and to provide arrangement for locking the fencing with provision of lock & key.5- Plastering 10 mm thickness with cement, Mortar in ratio 1:4 cement and fine sand, including cost of all required material, labour & T&P etc.6- Painting of entire metal works including wire mesh or pale fencing with super enameled primer coat of Red Oxide in two coats of British/Asian Paint thereafter painting of same work with dark blue super enameled paint in again two coats of British/Asian Paint.7- Painting of Main Gate including wire mesh or pale fencing with super enameled primer coat of Red Oxide in two coats of British/Asian Paint thereafter painting of same work with dark blue super enameled paint in again two coats of British/Asian Paint.8- Safe carriage of MS Angle iron frame from nearest S/S to site of work, labour cost including loading and unloading at both ends.9- Safe carriage of MS Angle iron main gate from nearest S/S to site of work, labour cost including loading and unloading at both ends.10- Supply of MS Clamp for MS Angle Iron frame with nut & Bolts, washer four clamp.11- Supply of MS Angle Iron frame size of 37x37x5 mm for fixing of MS welded wire mesh 18 SWG or pale fencing made from MS Sheet size 1500 mm x 75 mm x 18 SWG with MS Strip of size 35x5 mm size of full frame. | Construction of toe wall with wire mesh or Pale fencing & painting of Sub-Stations, detail of the work as given below (All fencing/painting material arranged by contractor at his own cost):-1- Construction of toe wall 9\\" wide 1' high above ground, all around the plinth/DP structure in 1:6 ratio of cement and coarse sand. The toe wall shall have pocket of 1200 mm size at the center of toe wall at appropriate places for grouting of MS Angle iron frames toe wall may very as per site conditions.2- Grouting & fixing of MS Angle iron frame in 1:2:4 ratio of cement, stone grit & coarse sand and bolting the frames with at joining frames by 35x8 mm bolt with nut. The size of MS Angle Iron frame may very as per requirement of site.3- Fabrication & Providing Gate in front of plinth/DP made in two leaves of size 900x1500 mm each. Each leave shall be made by MS Angle iron of 37x37x5 mm MS Angle and fitted with wire mesh or pale fencing of 18 SWG with the help of MS Strip of 35x5 mm size welded all around the frame. The leaves shall be fitted with hinges on MS Angle of size of 50x50x6 mm and shall have locking arrangement. Two gates shall be provided on such sub-station where more than one T/F are installed and that shall be counted two sub-stations.4- Fixing & Grouting of main gate at S.No. 1.03 made of MS Angle iron frame of 37x37x5 mm and 50x50x6 mm in the ratio 1:2:4 of cement, stone grit & coarse sand in front of DP/Plinth and to provide arrangement for locking the fencing with provision of lock & key.5- Plastering 10 mm thickness with cement, Mortar in ratio 1:4 cement and fine sand, including cost of all required material, labour & T&P etc.6- Painting of entire metal works including wire mesh or pale fencing with super enameled primer coat of Red Oxide in two coats of British/Asian Paint thereafter painting of same work with dark blue super enameled paint in again two coats of British/Asian Paint.7- Painting of Main Gate including wire mesh or pale fencing with super enameled primer coat of Red Oxide in two coats of British/Asian Paint thereafter painting of same work with dark blue super enameled paint in again two coats of British/Asian Paint.8- Safe carriage of MS Angle iron frame from nearest S/S to site of work, labour cost including loading and unloading at both ends.9- Safe carriage of MS Angle iron main gate from nearest S/S to site of work, labour cost including loading and unloading at both ends.10- Supply of MS Clamp for MS Angle Iron frame with nut & Bolts, washer four clamp.11- Supply of MS Angle Iron frame size of 37x37x5 mm for fixing of MS welded wire mesh 18 SWG or pale fencing made from MS Sheet size 1500 mm x 75 mm x 18 SWG with MS Strip of size 35x5 mm size of full frame. |
| 31 | Note: Any quantity of item from sl no. 1 to sl no. 2.16 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 2.16 may vary to any limit within the financial value of agreement against this tender. |