| 1 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messengerthrough existing poles |
| 2 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 3 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 4 | Dismantling (without damage) one km LT additional conductor line bydismantling cross arms, insulators and stacking the conductors in rolls properly |
| 5 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 6 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 7 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 8 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 9 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 10 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 11 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 12 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 13 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 14 | Erection of suspension clamp for LT ABC of any size |
| 15 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 16 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 17 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 18 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 19 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (exceptpoles) from stacking place. |
| 20 | Disconnecting and lowering down the single phase WP serviceconnection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 21 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work Please Enable Macros to View BoQ information |