|
| 1 | Supply and Erection/Carriage of following Decenterlised Material by the Contractor own his Coast as per RESPO norms | Supply and Erection/Carriage of following Decenterlised Material by the Contractor own his Coast as per RESPO norms |
| 2 | LT PVC Cable 3.5x150/70 sq mm | LT PVC Cable 3.5x150/70 sq mm |
| 3 | MS Channel (Dropper) 100x50x2028mm (for fuse set) | MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 4 | MS Channel 125x65x1300mm (T-off) | MS Channel 125x65x1300mm (T-off) |
| 5 | MS Top channel (125x65x2240mm) | MS Top channel (125x65x2240mm) |
| 6 | MS angle 75x75x6x2028mm with clamp & bolt and nut (T/F base) | MS angle 75x75x6x2028mm with clamp & bolt and nut (T/F base) |
| 7 | Earthing Completeof PCC/ST pole Without Labour | Earthing Completeof PCC/ST pole Without Labour |
| 8 | Copper L-piece 50x225x10mm (LS) | Copper L-piece 50x225x10mm (LS) |
| 9 | Copper L-piece 62x225x12 mm (LS) | Copper L-piece 62x225x12 mm (LS) |
| 10 | Al Lug 400/240 sq mm long barrel off size (LS) | Al Lug 400/240 sq mm long barrel off size (LS) |
| 11 | lt suspension clamp | lt suspension clamp |
| 12 | EYE HOOK WITH I-CLAMP | EYE HOOK WITH I-CLAMP |
| 13 | DEAD END CLAMP | DEAD END CLAMP |
| 14 | Danger baord Barbed wire including jumper | Danger baord Barbed wire including jumper |
| 15 | 11 KV V TYPE CROOS ARM HOLDING CLAMP | 11 KV V TYPE CROOS ARM HOLDING CLAMP |
| 16 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 17 | LT pole clamp with n&b | LT pole clamp with n&b |
| 18 | 11 KV F-Clamp with N & B | 11 KV F-Clamp with N & B |
| 19 | Clamps for LT T-off with bolts & Nuts | Clamps for LT T-off with bolts & Nuts |
| 20 | Henley Type Tailless Unit for 250 KVA T/F | Henley Type Tailless Unit for 250 KVA T/F |
| 21 | lt distribution box 1-ph | lt distribution box 1-ph |
| 22 | lt distribution box 3-ph | lt distribution box 3-ph |
| 23 | lt distribution box clamp | lt distribution box clamp |
| 24 | LT Fuse Set Protection Unit for 25/100 KVA DT with SMC Box | LT Fuse Set Protection Unit for 25/100 KVA DT with SMC Box |
| 25 | LT XLPE CABLE AL 1X70 SQ MM | LT XLPE CABLE AL 1X70 SQ MM |
| 26 | Stone pad 300x300x75mm | Stone pad 300x300x75mm |
| 27 | Concreting of poles | Concreting of poles |
| 28 | Concreting of STAY | Concreting of STAY |
| 29 | supporting Clamp of TF | supporting Clamp of TF |
| 30 | Piercing Connector | Piercing Connector |
| 31 | Single Phase SMC Fuse Box With Clamp | Single Phase SMC Fuse Box With Clamp |
| 32 | T/F Chemical Earthing | T/F Chemical Earthing |
| 33 | Plinth for size 2x2x1.5M | Plinth for size 2x2x1.5M |
| 34 | Fancing | Fancing |
| 35 | Supply of 70 SQMM PVC lead (1- core) for three phase fuse set | Supply of 70 SQMM PVC lead (1- core) for three phase fuse set |
| 36 | Supply of 50 SQMM PVC lead (1- core) for single phase fuse set | Supply of 50 SQMM PVC lead (1- core) for single phase fuse set |
| 37 | Erection/Installation/laying of item of following Centerlised Material as per RESPO norms. | Erection/Installation/laying of item of following Centerlised Material as per RESPO norms. |
| 38 | PCC Poles 8.5 Mtr. Long | PCC Poles 8.5 Mtr. Long |
| 39 | 11 KV Disc Insulator T&C type 4500kg. | 11 KV Disc Insulator T&C type 4500kg. |
| 40 | 11 KV Disc fitting | 11 KV Disc fitting |
| 41 | 11 KV Pin insulator (Polymeric) | 11 KV Pin insulator (Polymeric) |
| 42 | 11/0.4 KV T/F 250 KVA | 11/0.4 KV T/F 250 KVA |
| 43 | 11/0.4 KV T/F 25 KVA | 11/0.4 KV T/F 25 KVA |
| 44 | 11/0.4 KV T/F 100 KVA NEW | 11/0.4 KV T/F 100 KVA NEW |
| 45 | 11/0.4 KV T/F 63 KVA NEW | 11/0.4 KV T/F 63 KVA NEW |
| 46 | AB Cable (3*120+1*95+1*16) | AB Cable (3*120+1*95+1*16) |
| 47 | AB Cable (3*95+1*70+1*16) | AB Cable (3*95+1*70+1*16) |
| 48 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 49 | 11 KV V TYPE CROOS ARM | 11 KV V TYPE CROOS ARM |
| 50 | 11 KV fuse Set | 11 KV fuse Set |
| 51 | LT XLPE Cable Al 1x400 sq mm | LT XLPE Cable Al 1x400 sq mm |
| 52 | LT XLPE CABLE AL 1X120 SQ MM | LT XLPE CABLE AL 1X120 SQ MM |
| 53 | Stay set Complete 16x1800 | Stay set Complete 16x1800 |
| 54 | DISMENTALING FOLLOWING MATERIAL AND SAFELY RECEIVE BACK FROM SITE TO STORE | DISMENTALING FOLLOWING MATERIAL AND SAFELY RECEIVE BACK FROM SITE TO STORE |
| 55 | 100 KVA T/F | 100 KVA T/F |
| 56 | 16 KVA T/F | 16 KVA T/F |