| 1 | Supply and Erection/Carriage of following Decenterlised Material by the Contractor own his Coast as per RESPO norms | Supply and Erection/Carriage of following Decenterlised Material by the Contractor own his Coast as per RESPO norms |
| 2 | Earthing COMPLETE WITHOUT LABOUR | Earthing COMPLETE WITHOUT LABOUR |
| 3 | Stone pad 300x300x75 mm | Stone pad 300x300x75 mm |
| 4 | LT pole Clamp with nuts & bolts for PCC pole. | LT pole Clamp with nuts & bolts for PCC pole. |
| 5 | DP CLAMP | DP CLAMP |
| 6 | I hook | I hook |
| 7 | Suspension Clamp | Suspension Clamp |
| 8 | Dead end clamp | Dead end clamp |
| 9 | PG Clamp | PG Clamp |
| 10 | Danger Board With clamp | Danger Board With clamp |
| 11 | 11 KV TPMO | 11 KV TPMO |
| 12 | LT PVC cable AL 3.5x150/70 SQ MM | LT PVC cable AL 3.5x150/70 SQ MM |
| 13 | Al Lug 240 Sqmm Long Barrel off size (LS) | Al Lug 240 Sqmm Long Barrel off size (LS) |
| 14 | Concreting of poles (0.268 Cu. M. each) | Concreting of poles (0.268 Cu. M. each) |
| 15 | M S Dropper Channel | M S Dropper Channel |
| 16 | Top Channel | Top Channel |
| 17 | T off Channel Complete | T off Channel Complete |
| 18 | M.S T/F Base Angle | M.S T/F Base Angle |
| 19 | LT FUSE SET PROTECTION UNIT FOR 100KVA DT WITH SMC BOX | LT FUSE SET PROTECTION UNIT FOR 100KVA DT WITH SMC BOX |
| 20 | Tailess unit 500A for 250 kva T/F | Tailess unit 500A for 250 kva T/F |
| 21 | CONCRETING OF STAY | CONCRETING OF STAY |
| 22 | Chemical Earthing | Chemical Earthing |
| 23 | PLINTH & FOUNDATION OF MEDIUM POWER T/F | PLINTH & FOUNDATION OF MEDIUM POWER T/F |
| 24 | Fencing of Medium Power DTR | Fencing of Medium Power DTR |
| 25 | Supply of 70SQMM PVC Lead for Three Phase Fuse Set (Single Core) | Supply of 70SQMM PVC Lead for Three Phase Fuse Set (Single Core) |
| 26 | Supply of 50SQMM PVC Lead for Single Phase Fuse Set (Single Core) | Supply of 50SQMM PVC Lead for Single Phase Fuse Set (Single Core) |
| 27 | Erection/Installation/laying of item of following Centerlised Material as per RESPO norms. | Erection/Installation/laying of item of following Centerlised Material as per RESPO norms. |
| 28 | 25 KVA , 11/0.4 KVA T/F | 25 KVA , 11/0.4 KVA T/F |
| 29 | 63 KVA , 11/0.4 KVA T/F | 63 KVA , 11/0.4 KVA T/F |
| 30 | 100 KVA , 11/0.4 KVA T/F | 100 KVA , 11/0.4 KVA T/F |
| 31 | 250 KVA, 11/0.4 KV T/F | 250 KVA, 11/0.4 KV T/F |
| 32 | PCC Support 8.5 Mtr. Long | PCC Support 8.5 Mtr. Long |
| 33 | LT ABC (3x120+1x95+1x16) Sq. mm | LT ABC (3x120+1x95+1x16) Sq. mm |
| 34 | LT ABC (3x95+1x70+1x16) Sq. mm | LT ABC (3x95+1x70+1x16) Sq. mm |
| 35 | LT ABC (3x50+1x35+1x16) Sq. mm | LT ABC (3x50+1x35+1x16) Sq. mm |
| 36 | Disc Fitting 11KV | Disc Fitting 11KV |
| 37 | ACSR WEASEL Conductor | ACSR WEASEL Conductor |
| 38 | 11 KV Pin Insulator Polymeric | 11 KV Pin Insulator Polymeric |
| 39 | Stay Set Complete 16x1800 | Stay Set Complete 16x1800 |
| 40 | 11 KV Disc Insulator T&C Type 4500 KG | 11 KV Disc Insulator T&C Type 4500 KG |
| 41 | 11 KV Fuse Set | 11 KV Fuse Set |
| 42 | LT PVC cable AL 1x240 SQ MM | LT PVC cable AL 1x240 SQ MM |
| 43 | STAY Wire 7/8 SWG | STAY Wire 7/8 SWG |
| 44 | DISMENTALING FOLLOWING MATERIAL AND SAFELY RECEIVE BACK FROM SITE TO STORE | DISMENTALING FOLLOWING MATERIAL AND SAFELY RECEIVE BACK FROM SITE TO STORE |
| 45 | 100 KVA T/F | 100 KVA T/F |