| 1 | Supply of LT AB Cable | LT AB Cable (3x120+1x95+1x16) Sqmm |
| 2 | Supply of ST Pole LT Clamp | LT Clamp with nut&bolt STP Pole With Netural |
| 3 | Supply of MS Channel Dropper | MS Channel Dropper 100x50x2028 mm |
| 4 | Supply of Stone Pad | Stone Pad 300x300x75 mm |
| 5 | Supply of Holding clamp | Holding clamp for top channel TPMO & Fuse set with nut & Bolt |
| 6 | Supply of M.S. Angle | M.S. Angle 75x75x6x2028mm with clamp nut & Bolt T/F Base |
| 7 | Supply of M.S. Channel | M.S. Channel (125x65x1300 mm) T-off |
| 8 | Supply of Suspension Clamp | Suspension Clamp |
| 9 | Supply of M.S. Top Channel | M.S. Top Channel 125x65x2240 mm |
| 10 | Supply of Dead end Clamp | Dead end Clamp |
| 11 | Supply of Danger Board | Danger Board with clamp |
| 12 | Supply of Eye Hook | Eye Hook |
| 13 | Supply of Barbed Wire G.I. | Barbed Wire (G.I.) |
| 14 | Supply of Aluminium Paint | Aluminium Paint |
| 15 | Supply of Red Oxide Paint | Red Oxide Paint |
| 16 | Supply of Number Plate | Number Plate |
| 17 | Supply of Copper L-Piece | Copper L-Piece 50x225x10 mm (LS) |
| 18 | Supply of Copper L-Piece | Copper L-Piece 62x225x12 mm (LS) |
| 19 | Supply of Al Leg Long Barrel | Al Leg Long Barrel of size (LS) |
| 20 | Supply of Henley Type Tailless Unit | Henley Type Tailless Unit for 250 KVA |
| 21 | Supply of LT T OFF CLAMP | LT T OFF CLAMP WITH NUT & BOLT |
| 22 | Supply of LT PVC CABLE | LT PVC CABLE 3.5x150/70 SQMM |
| 23 | Supply of GI Wire 8 SWG | GI Wire 8 SWG |
| 24 | Supply of HDPE Pipe | 140 MM OD PN-4PE-80 GRADE UV STABILIZED HDPE PIPE IN 6 MTR |
| 25 | Supply of DP Clamp | DP Clamp for PCC Pole |
| 26 | Supply of Guarding Angle | Guarding Angle |
| 27 | Supply of Guarding Angle Clamp | Guarding Angle Clamp |
| 28 | Supply of PCC Pole LT Clamp | LT Clamp for PCC Pole |
| 29 | Supply of GI PIPE | GI PIPE 6 DIA |
| 30 | Supply of LT Shackle Insulator | LT Shackle Insulator |
| 31 | Supply of Nut and Bolts | Nut & Bolts for LT Shackle Insulator |
| 32 | Safe Carriage of 25 KVA TF | Safe Carriage of 11/0.4 KV TF 25 KVA & following materials from Electricity Store Center Soron/Etah / Aligarh to the site of work, including loading & unloading at both ends, Traspotation upto the work side. The rates shall be inclusive of all labour charges, T&P and all incidental expenses required for complete execution of the work. |
| 33 | Safe Carriage of 63 KVA TF | 11/0.4 KV TF 63 KVA |
| 34 | Safe Carriage of 100 KVA TF | 11/0.4 KV TF 100 KVA |
| 35 | Safe Carriage of 250 KVA TF | 11/0.4 KV TF 250 KVA |
| 36 | Safe Carriage of PCC Pole | PCC Pole 8.5 mtr |
| 37 | Safe Carriage of ST Pole | STP Pole 11 Metre |
| 38 | Safe Carriage of ACSR Weasel Conductor | ACSR Weasel Conductor |
| 39 | Safe Carriage of ACSR Dog Conductor | ACSR Dog Conductor |
| 40 | Safe Carriage of LT XLPE Cable | LT XLPE Cable AL 1x240 Sqmm |
| 41 | Safe Carriage of Disc Insulator | 11 KV Disc Insulator t&c Type 4500 Kg. |
| 42 | Safe Carriage of Disc Fitting | 11 KV Disc Fitting |
| 43 | Safe Carriage of Pin Insulator | 11 KV Pin Insulator |
| 44 | Safe Carriage of Pin with nut | 11 KV Pin with nut |
| 45 | Safe Carriage of TPMO | 11 KV TPMO |
| 46 | Safe Carriage of 11 KV FUSE Set | 11 KV FUSE Set |
| 47 | Safe Carriage of LT FUSE Set | LT FUSE Set |
| 48 | Safe Carriage of Stay Set Complete | Stay Set Complete |
| 49 | Safe Carriage of Earthing rod | Earthing of Pole by MS Earthing rod of 20x2500 mm and 6 SWG earthing wire etc. |
| 50 | Safe Carriage of 11 KV XLPE CABLE | 11 KV XLPE CABLE 3x120 sqmm (with spare cable) |
| 51 | Safe Carriage of 11 KV XLPE CABLE | 11 KV XLPE CABLE 3x185 sqmm (with spare cable) |
| 52 | Safe Carriage of 11 KV J Kit OD | 11 KV 3x185 sqmm OUTDOOR J/K |
| 53 | Safe Carriage of 33 KV XLPE Cable | 33 KV 3x300 SQMM XLPE CABLE |
| 54 | Safe Carriage of 11 KV J Kit OD | 11 KV 3x120 sqmm OUTDOOR J/K |
| 55 | Safe Carriage of 33 KV J Kit I D | 33 KV 3x300 sqmm INDOOE J/K |
| 56 | Safe Carriage of 33 KV J Kit OD | 33 KV 3x300 OUTDOOR J/K |
| 57 | Safe Carriage of Pin Insulator | 33 KV Polymer Pin Insulator |
| 58 | Safe Carriage of Pin with nut | 33 KV Pin with nut |
| 59 | Safe Carriage of 11 KV Cross ARM clamp | 11 kv Cross ARM clamp |
| 60 | Safe Carriage of 11 KV Cross ARM V-Tpye | 11 kv Cross ARM V-Tpye |
| 61 | Safe Carriage of 33 KV Cross ARM clamp | 33 kv Cross ARM clamp |
| 62 | Safe Carriage of 33 KV Cross ARM V-Tpye | 33 kv Cross ARM V-Tpye |
| 63 | Safe Carriage of 11 kv F-Clamp | 11 kv F-Clamp for PCC POLE |
| 64 | Safe Carriage of 33 kv F-Clamp | 33 kv F-Clamp for PCC POLE |
| 65 | Safe Carriage of T-off Channel | T-off Channel |
| 66 | Safe Carriage of Clamp of T-off Channel | Clamp of T-off Channel |
| 67 | Erection of 25 KVA T F | Installation of new 25 kVA, 11/0.4 kV transformer complete in all respects |
| 68 | Erection of 63 KVA T F | Installation of new 63 kVA, 11/0.4 kV transformer complete in all respects |
| 69 | Erection of 100 KVA T F | Installation of new 100 kVA, 11/0.4 kV transformer complete in all respects |
| 70 | Erection of 250 KVA TF | Installation of new 250 kVA, 11/0.4 kV transformer complete in all respects |
| 71 | Erection of PCC double Pole | Erection of double support with complete HT/LT fittings on 8.5 m PCC poles, including earthing, grouting, and muffing of poles |
| 72 | Erection of PCC Pole | Erection of single support with complete HT/LT fittings on 8.5 m PCC poles, including earthing, grouting, and muffing of poles |
| 73 | Erection of ST double Pole | Erection of double support with complete HT/LT fittings on 11 m ST poles, including earthing, grouting, and muffing of poles |
| 74 | Erection of ST Pole | Erection of single support with complete HT/LT fittings on 11 m ST poles, including earthing, grouting, and muffing of poles |
| 75 | Erection of Pipe Earthing | Installation of pipe earthing (body and neutral) up to 60 feet depth or minimum water level, as per RESPO norms |
| 76 | Erection of Plinth | Construction and installation of plinth for 250 kVA transformer, complete in all respects |
| 77 | Erection of Fencing | Construction and installation of 6-foot-high fencing for 250 kVA transformer, including civil works for a 4mx4 m area, complete in all respects |
| 78 | Erection of HDPE Pipe | Laying & Fixing HDPE PipeUnder ground through HDD Method |
| 79 | Erection of ACSR Weasel Conductor | Laying sagging stringing, binding and jumpering ACSR Weasel conductor |
| 80 | Erection of ACSR Dog Conductor | Laying sagging stringing, binding and jumpering ACSR Dog conductor |
| 81 | Erection of LT AB Cable | Laying & Fixing of LT AB Cable (3x120+1x95+1x16) Sqmm |
| 82 | Erection of LT PCV Cable | Laying & Fixing of LT PVC Cable 3.5x150/70 Sq mm |
| 83 | Erection of MS Channel | Erection & Installation of MS Channel (Dropper) 100x50x2028 mm |
| 84 | Erection of M.S. Angle | Erection & Installation of M.S. Angle 75x75x6x2028mm with clamp nut & Bolt T/F Base |
| 85 | Erection of M.S. Channel | Erection & Installation of M.S. Channel (125x65x1300 mm) T-off |
| 86 | Erection of Suspension Clamp | Erection & Installation of Suspension Clamp |
| 87 | Supply of Dead end Clamp | Erection & Installation of Dead end Clamp |
| 88 | Erection of M.S. Top Channel | Erection & Installation of M.S. Top Channel 125x65x2240 mm |
| 89 | Painting of ST Poles | Painting of ST Pole with red oxide & ailunimum paint as per RESPO norms |
| 90 | Erection of Danger Board | Fixing of Danger Board with clamp |
| 91 | Erection of Barbed Wire | Laying & Fixing of Barbed Wire (G.I.) |
| 92 | Erection of G.I. Wire | Laying & Fixing of G.I. Wire 8 SWG |
| 93 | Erection of Number Plate | Fixing of Number Plate |
| 94 | Erection of Copper L-Piece | Erection & Installation of Copper L-Piece 50x225x10 mm (LS) |
| 95 | Erection of Copper L-Piece | Erection & Installation of Copper L-Piece 62x225x12 mm (LS) |
| 96 | Erection of Al Leg Long Barrel | Erection & Installation of Al Leg Long Barrel of size (LS) |
| 97 | Erection of Henley Type Tailless Unit | Erection & Installation of Henley Type Tailless Unit for 250 KVA |
| 98 | Erection of GI PIPE | Laying & Fixing of GI PIPE 6 DIA |
| 99 | Erection of LT Shackle Insulator | Erection & Installation of LT Shackle Insulator |
| 100 | Erection of Stay Set Complete | Erection & Installation of Stay Set Complete in all respect |
| 101 | Erection of LT XLPE Cable | Laying & Fixing of LT XLPE Cable AL 1x240 Sqmm |
| 102 | Erection of 11 KV TPMO | Erection & Installation of 11 KV TPMO |
| 103 | Erection of FUSE Set | Erection & Installation of 11 KV FUSE Set |
| 104 | Erection of FUSE Set | Erection & Installation of LT FUSE Set |
| 105 | Erection of 11 KV XLPE CABLE | Laying & Fixing of 11 KV XLPE CABLE 3x120 sqmm (with spare cable) |
| 106 | Erection of 11 KV XLPE CABLE | Laying & Fixing of 11 KV XLPE CABLE 3x185 sqmm (with spare cable) |
| 107 | Erection of 11 KV J Kit OD | Laying & Fixing of 11 KV 3x185 sqmm OUTDOOR J/K |
| 108 | Erection of 33 KV XLPE Cable | Laying & Fixing of 33 KV 3x300 SQMM XLPE CABLE |
| 109 | Erection of 11 KV J Kit OD | Laying & Fixing of 11 KV 3x120 sqmm OUTDOOR J/K |
| 110 | Erection of 33 KV J Kit ID | Laying & Fixing of 33 KV 3x300 sqmm INDOOE J/K |
| 111 | Erection of 33 KV JKit OD | Laying & Fixing of 33 KV 3x300 OUTDOOR J/K |
| 112 | Erection of Eye Hook | Laying & Fixing of Eye Hook |