| 1 | FITMENT OF SUITABLE EYE PLATES/LIFTING ARRANGEMENTS FOR REMOVAL OF PORT AND STARBOARD SHAFTS AND PROPELLERS. THE SAME TO BE REMOVED POST COMPLETION OF WORK. | FITMENT OF SUITABLE EYE PLATES/LIFTING ARRANGEMENTS FOR REMOVAL OF PORT AND STARBOARD SHAFTS AND PROPELLERS. THE SAME TO BE REMOVED POST COMPLETION OF WORK. |
| 2 | REMOVAL OF PROPELLER CONE, CAP AND SECURING NUT FOR BOTH SHAFTS. | REMOVAL OF PROPELLER CONE, CAP AND SECURING NUT FOR BOTH SHAFTS. |
| 3 | REMOVAL OF PORT AND STARBOARD PROPELLER USING LAID DOWN PROCEDURE OF HYDRAULIC DISMOUNTING. | REMOVAL OF PORT AND STARBOARD PROPELLER USING LAID DOWN PROCEDURE OF HYDRAULIC DISMOUNTING. |
| 4 | REMOVAL OF STUFFING BOX ASSEMBLY AND EXTRACTION OF PACKING FROM BOTH SHAFT LINE. | REMOVAL OF STUFFING BOX ASSEMBLY AND EXTRACTION OF PACKING FROM BOTH SHAFT LINE. |
| 5 | DECOUPLING OF SHAFT COUPLING FROM REDUCTION GEAR (RG) FLANGE. | DECOUPLING OF SHAFT COUPLING FROM REDUCTION GEAR (RG) FLANGE. |
| 6 | REMOVAL OF PORT AND STARBOARD SHAFT COUPLING USING HYDRAULIC AND MECHANICAL PROCEDURE. | REMOVAL OF PORT AND STARBOARD SHAFT COUPLING USING HYDRAULIC AND MECHANICAL PROCEDURE. |
| 7 | WITHDRAWAL OF PORT AND STARBOARD PROPELLER USING LAID DOWN PROCEDURE OF HYDRAULIC DISMOUNTING. | WITHDRAWAL OF PORT AND STARBOARD PROPELLER USING LAID DOWN PROCEDURE OF HYDRAULIC DISMOUNTING. |
| 8 | REMOVAL OF STERN TUBE BEARING, AND; A’ BRACKET BEARING. | REMOVAL OF STERN TUBE BEARING, AND; A’ BRACKET BEARING. |
| 9 | APPLICATION OF PRESERVATIVES ON ALL REMOVED COMPONENTS AND SHIFTING TO DESIGNATE YARD LOCATION. | APPLICATION OF PRESERVATIVES ON ALL REMOVED COMPONENTS AND SHIFTING TO DESIGNATE YARD LOCATION. |
| 10 | DISCONNECT AND REMOVE STUFFING BOX AND DEGUT GLAND PACKING OF PORT AND STARBOARD RUDDER. | DISCONNECT AND REMOVE STUFFING BOX AND DEGUT GLAND PACKING OF PORT AND STARBOARD RUDDER. |
| 11 | WELDING / FITMENT OF EYE PLATES AND INSTALLATION OF CHAIN BLOCKS FOR HANDLING RUDDER FIN AND REMOVAL OF THE SAME POST COMPLETION OF WORK. | WELDING / FITMENT OF EYE PLATES AND INSTALLATION OF CHAIN BLOCKS FOR HANDLING RUDDER FIN AND REMOVAL OF THE SAME POST COMPLETION OF WORK. |
| 12 | REMOVE TILLER TOP BEARING ASSEMBLY. | REMOVE TILLER TOP BEARING ASSEMBLY. |
| 13 | REMOVAL OF BOTTOM BEARING SECURING BOLTS AND LIFTING OUT OF BEARINGS. | REMOVAL OF BOTTOM BEARING SECURING BOLTS AND LIFTING OUT OF BEARINGS. |
| 14 | REMOVAL OF PORT AND STARBOARD RUDDER. | REMOVAL OF PORT AND STARBOARD RUDDER. |
| 15 | APPLICATION OF PRESERVATIVES ON ALL REMOVED COMPONENTS AND SHIFTING TO DESIGNATED YARD LOCATION. | APPLICATION OF PRESERVATIVES ON ALL REMOVED COMPONENTS AND SHIFTING TO DESIGNATED YARD LOCATION. |