| 1 | Earth work n in excavation of foundation trenches of drain or septic tank, soak well etc. in all sorts of soil including removing, spreading or stacking the spoils within a lead of 75 mtr. or as directed and including trimming the sides of trenches, leveling, dressing and ramming the bottom bailing or pumping out water etc. as required complete.a)Depth of excavation not exceeding 1500mm |
| 2 | Depth of excavation for additionaal depth beyond 1500 mm and upto 3000mm. But not required sharing |
| 3 | Filling in foundation or plinth by fine sand in layer not exceeding 15 cm. as directed and consolidating same by through saturation with water and ramming complete, including the cost of supply of sand. Do by fine sand |
| 4 | Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc layer by layer complete (Payment to be made on the basis of measurement of finished quantity of work) i)With earth obtained from exavation of foundation. |
| 5 | Cleaning compound premises of hurbs,plants,jungles etc by cutting and removing as directed (specific permission of Engineer-in-charge prior to execution will be necessary ) (payment to be made on area cleared) |
| 6 | Single brick flat soling or picked jhama bricks including ramming and dressing bed to proper leveling and filling joint with power earth or local sand including cost of sand or earth. |
| 7 | Brick work with 1st class bricks in cement mortar (1:6) a) in foundation and plinth |
| 8 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 9 | Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (When the height of a particular floor is more than 4 m. the equivalent floor ht. shall be taken as 4 m. and extra for works beyond the initial 4 m. ht. shall be allowed under 12(e) for every 4 m. or part thereof.) (Mode of measurement : Area in plan X mean height of staging upto soffit of shuttering above initial 4 m.)a)25mm to 30mm .thick wooden shuttering |
| 10 | 25mm. to 30mm. shuttering without staging in foundation. |
| 11 | Steel shuttering or 9 mm to 30 mm thick approved quality plyboard shuttering in any concrete. |
| 12 | Ordinary cement concrete (mix 1:1:5:3) with graded stone chips (20 mm. nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes, Pakur variety. |
| 13 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm. nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes Pakur variety |
| 14 | Reinforcement for reinforced concrete in all sorts of structures work including distribution bars. Stirrups binders etc. initial straightening and removal of loose rust cutting to requisite length, hooking & bending to correct shape, placing in proper position and binding with 1.6 gauge black annealed wire at every intersection, complete as per drawing and direction.Tor steel / Mild steel. SAIL/ TATA/RINL |
| 15 | Labour for chipping of concrete surface before taking up plastering work. |
| 16 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches |
| 17 | Plaster (to wall, floor, ceiling etc.) with sans and cement mortar including rounding off or chamfering corners as directed and racking out joints including throating, nosing and drip course, scaffolding/ staging where necessary. i) With 1:6 cement mortar : a) 15mm. thick ( Gr. Floor) |
| 18 | Neat cement punning about 1.5 mm. in wall dado window sills drain etc. |
| 19 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 20 | Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality, including smoothening surface by sand papering etc. |
| 21 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary a) On steel or other metal surface : With super gloss (hi-gloss)2 coats(with any shade except white) |
| 22 | Applying exterior grade acrylic primer of approved quality and brand on plastered or concrete surface old or new surface to receive decorative textured ( matt finish ) or smooth finish acrylic exterior emulsion paint including scraping and preparation the surface thoroughly complete as per manufacturer`s specification and as per direction of the EIC. G.Fl. |
| 23 | Protective and decorative acrylic exterior emulsion paint of approved quality as per manufacturer`s specification and as per direction of EIC to be applied over acrylic primer as required. the rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer (G.Fl 2 coats) normal acrylic emulsionprimer 100% acrylic exterior emulsion paint of approved quality as per manufacturer’s specification. In ground floor |
| 24 | Cement washing including cleaning and smoothening surface thoroughly external surface one coat. |
| 25 | M.S. works in brackets made from flats, angles, tees etc. to sizes specialy bent, twisted, forged; making holes drilled and fitted to rafter of trusses with necessary bolts, nuts, washer or screws etc. (length of straight not less than 230 mm) |
| 26 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. In ground floor including roof. |
| 27 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.upto 150 mm. thick |
| 28 | Dismantling all types of masonry excepting cement concrete plain or reinforced. Stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. |
| 29 | Supplying & laying interlocking 60mm thick designer paver block(M-35) of anyshade and of approved quality as per IS: 1237-1980 laid in pattern as directed in pavement, footpath, driveway, etc including necessary underlay complete in all respect with all labour and material.[Border concrete if necessary to be paid separately]. (b)40 mm thick block (over 150 mm medium sand bed including cost of sand but excluding cost of earthwork in excavation or dismantling of existing hard surface if necessary) (ii) Coloured Decorative |
| 30 | Stripping off worn out plaster and raking out joints of walls,ceillings etc.upto any height and in any floor including removing rubbish within a lead of 75m as directed. |
| 31 | Scraping of moss, blisters etc.thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc.(Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge) |
| 32 | SUPPLYING STACKING & SPREADING OF APPROVAL quality crushed stone at site of 26.5mm size completely free form weathered and dead materials (frompakur variety stone aggregates as specified )as per direction of engg incharge including watering levelling ,dressing,complete in all respect |
| 33 | Supplying& laying 20 mm designer chequered tiles of any shade and of approved quality as per IS: 1237: 1980 laid in patterns as directed in pavement, footpath including necessary underlay 25 mm thick average cement mortar (1:3) complete in all respect with all labour and materials [using cement slurry @ 4.4 kg/Sq.m at back side of tiles. Cement of mortar & slurry will be supplied by the Department. Border concrete if necessary to be paid separately]. Please Enable Macros to View BoQ information |