|
| 1 | (Part-A) Supply & Erection Providing & Installation of Henley Type Tailless Unit Protection Cubical Panel 500 A 650 V for 250 KVA DT | (Part-A) Supply & Erection Providing & Installation of Henley Type Tailless Unit Protection Cubical Panel 500 A 650 V for 250 KVA DT |
| 2 | Providing & Fixing of T-Complete | Providing & Fixing of T-Complete |
| 3 | Providing & Fixing of Stone pad | Providing & Fixing of Stone pad |
| 4 | Providing & Fixing of Suspension Clamp | Providing & Fixing of Suspension Clamp |
| 5 | Providing & Fixing of Clamp for Distribution Box | Providing & Fixing of Clamp for Distribution Box |
| 6 | Providing & Fixing of PG Clamp | Providing & Fixing of PG Clamp |
| 7 | Providing & Fixing of Dead End Clamp | Providing & Fixing of Dead End Clamp |
| 8 | Providing & Fixing of I Hook | Providing & Fixing of I Hook |
| 9 | Providing & Fixing of J Hook | Providing & Fixing of J Hook |
| 10 | Providing & Fixing of Neutral Cum Earth Wire | Providing & Fixing of Neutral Cum Earth Wire |
| 11 | Providing & Fixing of Dropper Channel | Providing & Fixing of Dropper Channel |
| 12 | Providing & Fixing of Holdig Clamp for Top Channel | Providing & Fixing of Holdig Clamp for Top Channel |
| 13 | Providing & Fixing of MS Base Angle | Providing & Fixing of MS Base Angle |
| 14 | Providing & Fixing of Top Channel | Providing & Fixing of Top Channel |
| 15 | Providing & Fixing of T-off Channel | Providing & Fixing of T-off Channel |
| 16 | Providing & Fixing of LT SMC Box | Providing & Fixing of LT SMC Box |
| 17 | Providing & Fixing of Clamp for LT SMC Box | Providing & Fixing of Clamp for LT SMC Box |
| 18 | Providing & Fixing of Clamp for T-off channel | Providing & Fixing of Clamp for T-off channel |
| 19 | Providing & Fixing of Holding Clamp for DP Pole | Providing & Fixing of Holding Clamp for DP Pole |
| 20 | Providing & Fixing of Nut & Bolt with washer | Providing & Fixing of Nut & Bolt with washer |
| 21 | Providing & Fixing of Holding Clamp | Providing & Fixing of Holding Clamp |
| 22 | Providing & Fixing of LT Pole Clamp with Nut & Bolts for PCC Poles | Providing & Fixing of LT Pole Clamp with Nut & Bolts for PCC Poles |
| 23 | Providing & Fixing of Earth Wire clamps for PCC Poles | Providing & Fixing of Earth Wire clamps for PCC Poles |
| 24 | Providing & Fixing of Number Plate | Providing & Fixing of Number Plate |
| 25 | Providing & Fixing of Danger Board | Providing & Fixing of Danger Board |
| 26 | Providing & Fixing of Brassing Set | Providing & Fixing of Brassing Set |
| 27 | Providing & Fixing of Gaurding Angle | Providing & Fixing of Gaurding Angle |
| 28 | Providing & Fixing of Barbed wire | Providing & Fixing of Barbed wire |
| 29 | Providing & Fixing of DP Clamp | Providing & Fixing of DP Clamp |
| 30 | Providing & Fixing of 4 core LT MCB with Box | Providing & Fixing of 4 core LT MCB with Box |
| 31 | Providing & Fixing of Copper L-Piece 50x225x10 MM | Providing & Fixing of Copper L-Piece 50x225x10 MM |
| 32 | Providing & Fixing of 11 KV E-Bracket | Providing & Fixing of 11 KV E-Bracket |
| 33 | Providing & Fixing of Alu. Lug 250 sqmm | Providing & Fixing of Alu. Lug 250 sqmm |
| 34 | Providing & Fixing of Alu. Lug 150 sqmm | Providing & Fixing of Alu. Lug 150 sqmm |
| 35 | Providing & Fixing of Alu. Lug 400 sqmm | Providing & Fixing of Alu. Lug 400 sqmm |
| 36 | Providing & Fixing of LT Piercing Connector | Providing & Fixing of LT Piercing Connector |
| 37 | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 38 | Carriage of PCC Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of PCC Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 39 | Carriage of 25 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of 25 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 40 | Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 41 | Carriage of 250 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of 250 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 42 | Cartiage of LT XLPE CABLE AL 1X400 SQMM from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | Cartiage of LT XLPE CABLE AL 1X400 SQMM from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) |
| 43 | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Line material viz. LT ABC 3X95 SQMM (10690 MTR), Weasal conductor (3420 mtr), Distribution Box (288), stay Complete (132 nos), Earthing Complete (339), 11 kv Disc Insulator (87), 11 KV Disc Fitting (87), LT Fuse set (02 nos), 11 kv Fuse Set (37 nos), 11 kv Pin insulator (111), LT ABC 3x120 sqmm (1600 Mtr.), 11 kv Pin & Nut (81) and other line material, if required, earthing complete (38 nos) | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Line material viz. LT ABC 3X95 SQMM (10690 MTR), Weasal conductor (3420 mtr), Distribution Box (288), stay Complete (132 nos), Earthing Complete (339), 11 kv Disc Insulator (87), 11 KV Disc Fitting (87), LT Fuse set (02 nos), 11 kv Fuse Set (37 nos), 11 kv Pin insulator (111), LT ABC 3x120 sqmm (1600 Mtr.), 11 kv Pin & Nut (81) and other line material, if required, earthing complete (38 nos) |
| 44 | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 45 | Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 46 | Erection and grouting of Single Pole 11 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Single Pole 11 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 47 | Mounting & Installation of 25 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. | Mounting & Installation of 25 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. |
| 48 | Mounting & Installation of 100 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. | Mounting & Installation of 100 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. |
| 49 | Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. | Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. |
| 50 | Laying of LT XLPE Alu. Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of LT XLPE Alu. Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 51 | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 52 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor |
| 53 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. LT ABC 3X95 SQMM | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. LT ABC 3X95 SQMM |
| 54 | Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer. | Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer. |
| 55 | Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide. | Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide. |
| 56 | Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture. | Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture. |
| 57 | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. |
| 58 | Laying of LT ABC 3x120 sqmm as per RESPO norms and direction by supervising Engineer. | Laying of LT ABC 3x120 sqmm as per RESPO norms and direction by supervising Engineer. |
| 59 | Installation of Stay Complete as direction by supervising Engineer. | Installation of Stay Complete as direction by supervising Engineer. |
| 60 | Concreting of Stay as direction by supervising Engineer. All required mateial provide by the contractor at his own cost. | Concreting of Stay as direction by supervising Engineer. All required mateial provide by the contractor at his own cost. |
| 61 | Installation of 11 kv Disc Insulator as direction by supervising Engineer. | Installation of 11 kv Disc Insulator as direction by supervising Engineer. |
| 62 | Installation of 11 kv Disc Fitting as direction by supervising Engineer. | Installation of 11 kv Disc Fitting as direction by supervising Engineer. |
| 63 | Installation of LT Fuse Set as direction by supervising Engineer. | Installation of LT Fuse Set as direction by supervising Engineer. |
| 64 | Installation of 11 kv Fuse Set as direction by supervising Engineer. | Installation of 11 kv Fuse Set as direction by supervising Engineer. |
| 65 | Installation of 11 kv Pin Insulator as direction by supervising Engineer. | Installation of 11 kv Pin Insulator as direction by supervising Engineer. |
| 66 | Fixing of 11 kv Pin & Nut as direction by supervising Engineer. | Fixing of 11 kv Pin & Nut as direction by supervising Engineer. |
| 67 | Dismentling & Removal of 16 KVA T/F and Recived back to ele. Store Center Taj Agra | Dismentling & Removal of 16 KVA T/F and Recived back to ele. Store Center Taj Agra |
| 68 | Dismentling & Removal of 100 KVA T/F and Recived back to ele. Store Center Taj Agra | Dismentling & Removal of 100 KVA T/F and Recived back to ele. Store Center Taj Agra |