| 1 | Part-A (Supply of Material)Tail less Unit of Reputed Make for 250 KVA TF | Part-A (Supply of Material)Tail less Unit of Reputed Make for 250 KVA TF |
| 2 | Copper L-Piece 50x225x10 MM | Copper L-Piece 50x225x10 MM |
| 3 | Copper L-Piece 62x225x12 MM | Copper L-Piece 62x225x12 MM |
| 4 | Al. Lug long Barrel off size | Al. Lug long Barrel off size |
| 5 | Al. Lug long 400 SQMM | Al. Lug long 400 SQMM |
| 6 | Al. Lug long 240 SQMM | Al. Lug long 240 SQMM |
| 7 | Alu. Lug 120 sqmm | Alu. Lug 120 sqmm |
| 8 | Clamp for Distribution Box | Clamp for Distribution Box |
| 9 | Earth Wire Clamp | Earth Wire Clamp |
| 10 | Suspension clamp | Suspension clamp |
| 11 | Dead End Clamp | Dead End Clamp |
| 12 | PG Clamp | PG Clamp |
| 13 | Piercing Connector | Piercing Connector |
| 14 | LT SMC Box | LT SMC Box |
| 15 | LT PVC Armed Cable 4x16 sqmm | LT PVC Armed Cable 4x16 sqmm |
| 16 | Danger Board | Danger Board |
| 17 | Barbed Wire | Barbed Wire |
| 18 | J Hook | J Hook |
| 19 | LT Incoming Pannel with metering equipment | LT Incoming Pannel with metering equipment |
| 20 | LT Pole Clamp with nut & bolt | LT Pole Clamp with nut & bolt |
| 21 | DP Clamp for 11 KV | DP Clamp for 11 KV |
| 22 | I Hook | I Hook |
| 23 | Number Plate | Number Plate |
| 24 | Stone Pad | Stone Pad |
| 25 | MS Base Angle | MS Base Angle |
| 26 | I Bolts for service cables | I Bolts for service cables |
| 27 | Top Channel | Top Channel |
| 28 | Dropper Channel | Dropper Channel |
| 29 | MS T-Off Channel | MS T-Off Channel |
| 30 | LT 4 core MCB with box | LT 4 core MCB with box |
| 31 | F-Clamp | F-Clamp |
| 32 | Cross Arm Clamp | Cross Arm Clamp |
| 33 | Holding Clamp | Holding Clamp |
| 34 | Gaurding Angle | Gaurding Angle |
| 35 | Gaurding angle Clamp | Gaurding angle Clamp |
| 36 | Clamp for LT T-off with nut & bolt | Clamp for LT T-off with nut & bolt |
| 37 | Alu. Paint | Alu. Paint |
| 38 | Red Oxide Paint | Red Oxide Paint |
| 39 | Part-B (Erection work)Carriage of 16 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Part-B (Erection work)Carriage of 16 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 40 | Carriage of 25 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Carriage of 25 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 41 | Carriage of 63 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Carriage of 63 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 42 | Carriage of 100 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Carriage of 100 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 43 | Carriage of 250 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Carriage of 250 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 44 | Carriage of PCC Pole 8.5 Mtr. Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Carriage of PCC Pole 8.5 Mtr. Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 45 | Carriage of ST Pole 11 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) | Carriage of ST Pole 11 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 46 | Cartiage of LT XLPE Cable Alu. 3.5x400 sqmm (420 Mtr.), LT XLPE Cable Alu. 3.5x150 sqmm (114 Mtr.), LT XLPE Cable Alu. 3.5x70 sqmm (40 Mtr.), LT XLPE Cable 1x400 sqmm (200 Mtr.), LT XLPE Cable 1x240 sqmm (448 Mtr.), LT XLPE Cable 3.5x400 sqmm (15 Mtr.), Alu. Cable 1x16 sqmm (32 Mtr.), LT XLPE Cable Alu. 1x120 sqmm (30 Mtr.), from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | Cartiage of LT XLPE Cable Alu. 3.5x400 sqmm (420 Mtr.), LT XLPE Cable Alu. 3.5x150 sqmm (114 Mtr.), LT XLPE Cable Alu. 3.5x70 sqmm (40 Mtr.), LT XLPE Cable 1x400 sqmm (200 Mtr.), LT XLPE Cable 1x240 sqmm (448 Mtr.), LT XLPE Cable 3.5x400 sqmm (15 Mtr.), Alu. Cable 1x16 sqmm (32 Mtr.), LT XLPE Cable Alu. 1x120 sqmm (30 Mtr.), from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) |
| 47 | Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. TPMO (10), 11 KV Fuse set (15), Distribution Box (68), 11 KV V Type X Arm (07), MS Angle 75x75x6x2028 MM (14), Stay Complete (58), 11 KV Disc Insulator with fitting (63), 11 KV Pin Insulator with Pin & Nut (82), Earthing Complete (80), Weasol Conductor (1724), T Complete (2), LT ABC 3x120 sqmm (670 Mtr.), LT ABC 3x95 sqmm (642 Mtr.), LT ABC 3x50 sqmm (2920 Mtr.), LT ABC 1x25 sqmm (120 Mtr.), Gaurding wire (66 Kg.) and other line material, if required in Estimate/Package. | Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. TPMO (10), 11 KV Fuse set (15), Distribution Box (68), 11 KV V Type X Arm (07), MS Angle 75x75x6x2028 MM (14), Stay Complete (58), 11 KV Disc Insulator with fitting (63), 11 KV Pin Insulator with Pin & Nut (82), Earthing Complete (80), Weasol Conductor (1724), T Complete (2), LT ABC 3x120 sqmm (670 Mtr.), LT ABC 3x95 sqmm (642 Mtr.), LT ABC 3x50 sqmm (2920 Mtr.), LT ABC 1x25 sqmm (120 Mtr.), Gaurding wire (66 Kg.) and other line material, if required in Estimate/Package. |
| 48 | Mounting of 16 KVA T/F on single/double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. | Mounting of 16 KVA T/F on single/double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. |
| 49 | Mounting of 25 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. | Mounting of 25 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. |
| 50 | Mounting of 63 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. | Mounting of 63 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. |
| 51 | Mounting of 100 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. | Mounting of 100 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. |
| 52 | Installation of 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. | Installation of 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms. |
| 53 | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 54 | Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 55 | Erection and grouting of Single Pole 11 Mtr. long ST poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Single Pole 11 Mtr. long ST poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 56 | Erection and grouting of Double Pole 11 Mtr. long ST Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Double Pole 11 Mtr. long ST Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 57 | Laying sagging stringing and binding and jumpering of LT ABC 1x25 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. | Laying sagging stringing and binding and jumpering of LT ABC 1x25 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. |
| 58 | Laying sagging stringing and binding and jumpering of LT ABC 3x50 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. | Laying sagging stringing and binding and jumpering of LT ABC 3x50 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. |
| 59 | Laying sagging stringing and binding and jumpering of LT ABC 3x95 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. | Laying sagging stringing and binding and jumpering of LT ABC 3x95 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. |
| 60 | Laying sagging stringing and binding and jumpering of LT ABC 3x120 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. | Laying sagging stringing and binding and jumpering of LT ABC 3x120 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. |
| 61 | Laying of LT XLPE Alu. Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of LT XLPE Alu. Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 62 | Laying of LT XLPE Alu. Cable 3.5x150 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of LT XLPE Alu. Cable 3.5x150 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 63 | Laying of LT XLPE Alu. Cable 3.5x70 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of LT XLPE Alu. Cable 3.5x70 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 64 | Laying of LT XLPE Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of LT XLPE Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 65 | Laying of LT XLPE Cable 1x240 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of LT XLPE Cable 1x240 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 66 | Laying of LT XLPE Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of LT XLPE Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 67 | Laying of Alu. Cable 1x16 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of Alu. Cable 1x16 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 68 | Laying of LT XLPE Alu. Cable 1x120 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of LT XLPE Alu. Cable 1x120 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 69 | Laying & Connecting of LT PVC Armed Cable 4x16 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying & Connecting of LT PVC Armed Cable 4x16 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 70 | Erection and grouting of stay complete ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | Erection and grouting of stay complete ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 71 | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 72 | Laying sagging stringing binding and jumpering of ACSR Weasel Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. | Laying sagging stringing binding and jumpering of ACSR Weasel Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. |
| 73 | Installation of 11 KV Fuse set as per RESPO NORMS | Installation of 11 KV Fuse set as per RESPO NORMS |
| 74 | Installation of Distribution Box with Clamp as per RESPO NORMS | Installation of Distribution Box with Clamp as per RESPO NORMS |
| 75 | Fixing of TPMO with Polymer insulator as per Site requirment and RESPO Norms. | Fixing of TPMO with Polymer insulator as per Site requirment and RESPO Norms. |
| 76 | Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer. | Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer. |
| 77 | Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide. | Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide. |
| 78 | Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture. | Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture. |
| 79 | Complete fixing, Installation & Commissoning of Tail less unit including making proper cable connection in direction by supervising Engineer as per RESPO NORMS. | Complete fixing, Installation & Commissoning of Tail less unit including making proper cable connection in direction by supervising Engineer as per RESPO NORMS. |
| 80 | Complete fixing, Installation & Commissoning of LT incoming Pannel with metering equipment including making proper cable connection in direction by supervising Engineer as per RESPO NORMS. | Complete fixing, Installation & Commissoning of LT incoming Pannel with metering equipment including making proper cable connection in direction by supervising Engineer as per RESPO NORMS. |
| 81 | Fixing of Copper L-Piece 50x225x10 MM in direction by supervising Engineer. | Fixing of Copper L-Piece 50x225x10 MM in direction by supervising Engineer. |
| 82 | Fixing of Copper L-Piece 62x225x12 MM in direction by supervising Engineer. | Fixing of Copper L-Piece 62x225x12 MM in direction by supervising Engineer. |
| 83 | Fixing of Al. Lug long Barrel off size in direction by supervising Engineer. | Fixing of Al. Lug long Barrel off size in direction by supervising Engineer. |
| 84 | Fixing of Al. Lug long 400 SQMM in direction by supervising Engineer. | Fixing of Al. Lug long 400 SQMM in direction by supervising Engineer. |
| 85 | Fixing of Al. Lug long 240 SQMM in direction by supervising Engineer. | Fixing of Al. Lug long 240 SQMM in direction by supervising Engineer. |
| 86 | Fixing of Al. Lug long 120 SQMM in direction by supervising Engineer. | Fixing of Al. Lug long 120 SQMM in direction by supervising Engineer. |
| 87 | Fixing of Piercing Connector in direction by supervising Engineer. | Fixing of Piercing Connector in direction by supervising Engineer. |
| 88 | Fixing of Danger board in direction by supervising Engineer. | Fixing of Danger board in direction by supervising Engineer. |
| 89 | Fixing of Barbed wire in direction by supervising Engineer. | Fixing of Barbed wire in direction by supervising Engineer. |
| 90 | Fixing of J Hook in direction by supervising Engineer. | Fixing of J Hook in direction by supervising Engineer. |
| 91 | Fixing of MS base angle in direction by supervising Engineer. | Fixing of MS base angle in direction by supervising Engineer. |
| 92 | Fixing of I Hook in direction by supervising Engineer. | Fixing of I Hook in direction by supervising Engineer. |
| 93 | Installation of SMC Box in direction by supervising Engineer. | Installation of SMC Box in direction by supervising Engineer. |
| 94 | Installation & Fixing of Top Channel in direction by supervising Engineer. | Installation & Fixing of Top Channel in direction by supervising Engineer. |
| 95 | Installation & Fixing of MS T-off Channel in direction by supervising Engineer. | Installation & Fixing of MS T-off Channel in direction by supervising Engineer. |
| 96 | Installation & Fixing of LT 4 core MCB with box in direction by supervising Engineer. | Installation & Fixing of LT 4 core MCB with box in direction by supervising Engineer. |
| 97 | Installation & Fixing of Dropper Channel in direction by supervising Engineer. | Installation & Fixing of Dropper Channel in direction by supervising Engineer. |
| 98 | Fixing of F-Clamp in direction by supervising Engineer. | Fixing of F-Clamp in direction by supervising Engineer. |
| 99 | Fixing of Cross Arm Clamp in direction by supervising Engineer. | Fixing of Cross Arm Clamp in direction by supervising Engineer. |
| 100 | Fixing of Holding Clamp in direction by supervising Engineer. | Fixing of Holding Clamp in direction by supervising Engineer. |
| 101 | Fixing of Gaurding Angle with clamp in direction by supervising Engineer. | Fixing of Gaurding Angle with clamp in direction by supervising Engineer. |
| 102 | Fixing of Clamp for LT T-off with nut & bolt in direction by supervising Engineer. | Fixing of Clamp for LT T-off with nut & bolt in direction by supervising Engineer. |
| 103 | Concreting of Stay | Concreting of Stay |
| 104 | Concreting of Pole | Concreting of Pole |
| 105 | Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. | Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. |
| 106 | Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer. | Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer. |
| 107 | Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer. | Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer. |
| 108 | Dismentling & Removal of 10 KVA T/F-(01 Nos.) & 16 KVA T/F (02 Nos) and receive back to store center agra (Apprx 00-70 KM) | Dismentling & Removal of 10 KVA T/F-(01 Nos.) & 16 KVA T/F (02 Nos) and receive back to store center agra (Apprx 00-70 KM) |
| 109 | Dismentling & Removal of 100 KVA T/F and receive back to store center agra (Apprx 00-70 KM) | Dismentling & Removal of 100 KVA T/F and receive back to store center agra (Apprx 00-70 KM) |