| 1 | HYDT :Cost of drilling 200mmX165mmX125 Mtr deep bore well in all kinds of soil and rock in rural area for installation of pump bore set with Hydraulic DTH Rig machine, all complete including supplying all materials, tools, drilling rig, Air Compressor and equipments, as well as fuel, lubricants and cost of transportation of Rig machine and other vehicles up to the site.(DWSD 119)(a) 0.00m Up to 50.00m depth below G.L. In Rural Areas |
| 2 | Above 50.00 m depth. In Rural Areas |
| 3 | Supplying all materials, labour, equipment for lowering 200mm dia PVC casing pipe for protection the sites from falling during the process of drilling all complete including carriage to work as per specification and direction of E/I |
| 4 | Supplying materials and labours for constructing bore well chamber of 75B designation brick masonry chamber 600mmx450mm and 750mm deep internal dimension having 250mm thickness in cement mortar 1:6 including 12mm cement plaster 1:6 with 600mmx475mm RCC cover with earth work in excavation and 75mm thick PCC(1:3:6) in foundation and refilling all complete as per specification and direction of E/I (Annexure I Attached) (As per Old Model Estimate) |
| 5 | Designing, Supplying, Installation, Testing & Commissioning with all tools & Parts of following Solar Photovoltaic (SPV) Solar Submersible D.C. Water Motor Pump Suitable for minimum 125mm x 115mm bore well as per MNRE Guideline with following specifications & accessories. (2 HP (DC Pump) with 1800 WP (minimum) as per MNRE.Head Max Shut-off head 100 mtrs. ) |
| 6 | Earth work in excavation in foundation trenches in ordinary soil and disposal of excavated earth as obtained to a distance up to 50.0m ,including all lifts, levelling ,ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design ,building specification and direction of E/I(vide classification of soil item -B) |
| 7 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials ,labour ,royalty and taxes all complete as per building specification and direction of E/I(Mode of measurement compacted volume) |
| 8 | Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I |
| 9 | Providing nominal mix PCC of (1:4:8) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M.2.5to 3 including screening shuttering mixing cement concrete in mixer and placing in position vibrating striking curing and royalty all complete as per building specification and direction of E/I |
| 10 | Providing RCC M-20 in nominal mix of (1:1.5:3) in columns with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M.2.5to 3 including screening shuttering mixing cement concrete in mixer and placing in position vibrating striking curing and royalty all complete as per building specification and direction of E/I. |
| 11 | Providing RCC M-20 in nominal mix of (1:1.5:3) in reatining wall return wall |
| 12 | Providing for steel reinforcement as per approved design and (10mm) |
| 13 | Providing for steel reinforcement as per approved design and (12mm) |
| 14 | Carriage of material from different Source or departmental |
| 15 | Providing structural steel galvanised squre pipe section work in trusses, other similar trussed purlins and members with all bracing ,gusset plates etc as per detailed design and drawing or as directed by Engineer- in-charge ,including cutting fabricating ,hoisting , erecting and fixing in position , making riveted/bolted /welded connections and one coat of anticorrosive paint and over it two coat of all oil painting & For Structure(PLUS) Providing and applying materials &labour for hot dip galvanizing of above structure including transportation for galvanizing minimum thickness 80microns (Net wt. of components to be Galv) preferably TATA structural section etc complete. |
| 16 | Providing structural steel work in trusses other similar trussed purlins and members with bracing gusset plates etc as per detailed design and drawing or as directed by Engineer- in-charge including cutting fabricating hoisting erecting and fixing in position making reverted bolted welded connections one coat of anticorrosive paint and over it two coats of oil painting etc complete (MJP 2019-2020 Sec F Item 6) |
| 17 | Materials and labour for Vinyl Painting of matter given by Department in different colour (as per Market Rate) |
| 18 | Providing and fixing HDPE container Syntex or alike one piecemolded water tank made out of low density polythyler andbuilt corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity 2000.00 litres Capacity Water storage Tank |
| 19 | Transportation Charge |
| 20 | Lifting of 2000 Litrs Capacity Tank up to 4.50m height with lifting tools with rope and labour |
| 21 | Making hole in Tank |
| 22 | Making long screw in G.I. pipe including supplying and fitting jam nuts and extra socket etc. |
| 23 | O & M Cost for 1st year (Excluding Repair Charges) |
| 24 | O & M cost for 2nd Year = O & M for 1st Yr + 6% of O&M for 1st Year + Annual repairing Charges |
| 25 | O & M cost for 3rd Year =1.06 x 2st year |
| 26 | O & M cost for 4th Year =1.06 x 3rd year |
| 27 | O & M cost for 5th Year =1.06 x 4th year |
| 28 | Provision of one no SIM card & its recharging cost for RMC |
| 29 | Good & Service Tax (GST) |
| 30 | Labour Cess Please Enable Macros to View BoQ information |