|
| 1 | Comprehensive Annual Maintenance Contract (CAMC) for following Ductable Split AC of different capacity and different make installed at AGMC & GBP Hospital Agartala as per the direction the Engineer-in-charge during First 1(One) Year. |
| 2 | 11 TR capacity Ductable split AC (Haier make) Installed at College Library, 4th Floor College Building. AGMC & GBP Hospital |
| 3 | 11 TR capacity Ductable split AC (Haier make) Installed at Lecture Hall 5, 4th Floor College Building. AGMC & GBP Hospital |
| 4 | 8.5 TR Capacity Ductable Split AC (Haier make) installed at College Library, 4th Floor College Building. AGMC & GBP Hospital |
| 5 | 8.5 TR Capacity Ductable Split AC (Bluestar make) installed at Post Operative ward. 2nd Floor, Jayanti Block, AGMC & GBP Hospital |
| 6 | 8.5 TR Capacity Ductable Split AC (Haier make) installed at Geriatric male ward . 1st Floor, Jayanti Block, AGMC & GBP Hospital |
| 7 | 8.5 TR Capacity Ductable Split AC (Haier make) installed at Geriatric Female ward . 1st Floor, Jayanti Block, AGMC & GBP Hospital |
| 8 | 8.5 TR Capacity Ductable Split AC (Haier make) installed at NICU . 1st Floor, Old Building, AGMC & GBP Hospital |
| 9 | 8.5 TR Capacity Ductable Split AC (Voltas make) installed at CTVS IR. 5th Floor, NTH-I, AGMC & GBP Hospital |
| 10 | 5.5 TR Capacity Ductable Split AC (Voltas Make) installed at Geriatric Female ward . 1st Floor, Jayanti Block, AGMC & GBP Hospital |
| 11 | 5.5 TR Capacity Ductable Split AC (Voltas Make) installed at CTVS IR . 5th Floor, NTH-I AGMC & GBP Hospital |
| 12 | Comprehensive Annual Maintenance Contract (CAMC) for following Ductable Split AC of different capacity and different make installed at AGMC & GBP Hospital Agartala as per the direction the Engineer-in-charge during Second 1(One) Year. |
| 13 | 11 TR capacity Ductable split AC (Haier make) Installed at College Library, 4th Floor College Building. AGMC & GBP Hospital |
| 14 | 11 TR capacity Ductable split AC (Haier make) Installed at Lecture Hall 5, 4th Floor College Building. AGMC & GBP Hospital |
| 15 | 8.5 TR Capacity Ductable Split AC (Haier make) installed at College Library, 4th Floor College Building. AGMC & GBP Hospital |
| 16 | 8.5 TR Capacity Ductable Split AC (Bluestar make) installed at Post Operative ward. 2nd Floor, Jayanti Block, AGMC & GBP Hospital |
| 17 | 8.5 TR Capacity Ductable Split AC (Haier make) installed at Geriatric male ward . 1st Floor, Jayanti Block, AGMC & GBP Hospital |
| 18 | 8.5 TR Capacity Ductable Split AC (Haier make) installed at Geriatric Female ward . 1st Floor, Jayanti Block, AGMC & GBP Hospital |
| 19 | 8.5 TR Capacity Ductable Split AC (Haier make) installed at NICU . 1st Floor, Old Building, AGMC & GBP Hospital |
| 20 | 8.5 TR Capacity Ductable Split AC (Voltas make) installed at CTVS IR. 5th Floor, NTH-I, AGMC & GBP Hospital |
| 21 | 5.5 TR Capacity Ductable Split AC (Voltas Make) installed at Geriatric Female ward . 1st Floor, Jayanti Block, AGMC & GBP Hospital |
| 22 | 5.5 TR Capacity Ductable Split AC (Voltas Make) installed at CTVS IR . 5th Floor, NTH-I AGMC & GBP Hospital |
| 23 | Incidental repairing 01(One) No 8.5 TR (Haier make) ductable Split AC like replacing/supplying of compressor with gas charge, fan motor, fan blade, 3 phase 4 pole contactor, PCB, preventer etc as required to make the system functional at College Library, 4th Floor College Building (to be completed within 30 days) |
| 24 | Post repairing Comprehensive Annual Maintenance Contract (CAMC) of 01 (one) no 8.5 TR Capacity Ductable Split AC (Haier make) as mentioned in SL No 3 installed at College Library, 4th Floor College Building. AGMC & GBP Hospital. Please Enable Macros to View BoQ information |