| 1 | SUMMARY SHEET OF BOQ FOR BALANCE ELECTRICAL WORK OF HARE ISLAND OF VOCPA Summary Sheet of BOQ Estimate for Design, Supply, Erection, Testing and Commissioning of Railway Electrification Work including modification to existing 25 kV Ac, 50 Hz Single Phase Tramway Type Overhead Equipment (OHE) and modification of existing HT/LT Lines of Hare Island as per Railway Guidelines in Connection with Rail Transport System from Marshalling Yard to Hare Island at Tuticorin of V.O. Chidambaranar Port Authority under Madurai Division of Southern Railway in Tamilnadu Schedule Description of Schedule AMOUNT AS PER ESTIMATE in Rs. (Excl. GST) Quoted Percentage Above/ Below/ at per over Estimate Amount filled by the Bidder Total Quoted Amount filled by the bidder Price in Figure Price in Words % in Figure % in Word Above/Below /At par In figure In Word Schedule-A DESIGN & DRAWINGS 141107.73160050003 Rupees One Lakh Forty-One Thousand One Hundred Seven and Paise Seventy-Three Only Schedule-B OHE FOUNDATIONS 362966.0 Rupees Three Lakh Sixty-Two Thousand Nine Hundred Sixty-Six Only. Schedule-C STEEL ITEMS 2695114.3 Rupees Twenty-Six Lakh Ninety-Five Thousand One Hundred Fourteen and Paise Thirty Only. Schedule-D NON- FERROUS ITEMS 3732043.673 Rupees Thirty-Seven Lakh Thirty-Two Thousand Forty-Three and Paise Sixty-Seven Only. Schedule-E INSULATORS 662628.6399999999 Rupees Six Lakh Sixty-Two Thousand Six Hundred Twenty-Eight and Paise Sixty-Four Only. Schedule-F FERROUS & MISCELLANEOUS ITEMS 5290972.63 Rupees Fifty-Two Lakh Ninety Thousand Nine Hundred Seventy-Two and Paise Sixty-Three Only. Schedule-G MODIFICATION OF POWER LINE CROSSING 2686448.0 Rupees Twenty-Six Lakh Eighty-Six Thousand Four Hundred Forty-Eight Only Schedule-H SPARE ITEMS AND TOOLS & PLANTS FOR OHE ITEMS 386544.99 Rupees Three Lakh Eighty Six Thousand Five Hundred Forty Four and Paise Ninety Nine Only. Total Estimated Amount(Excl. GST In Figure Rs 1,59,57,825.96/- In Words Rupees One Crore Fifty Nine Lakh Fifty Seven Thousand Eight Hundred Twenty Five and Paise Ninety Six Only. Total Quoted Amount by the Bidder (Excl. GST) In Figure In Words Name of Bidder: BOQ of Estimate for Design, Supply, Erection, Testing and Commissioning of Railway Electrification Work including modification to existing 25 kV Ac, 50 Hz Single Phase Tramway Type Overhead Equipment (OHE) and modification of existing HT/LT Lines of Hare Island as per Railway Guidelines in Connection with Rail Transport System from Marshalling Yard to Hare Island at Tuticorin of V.O. Chidambaranar Port Authority under Madurai Division of Southern Railway in Tamilnadu SOR Item No Description of Item Unit Qty. Rate(Excl. GST) in Rs. Total Amount (Excl. GST) in Rs. SCHEDULE-A-DESIGN & DRAWINGS |
| 2 | Preparation of Design & drawing for OHE including OHE pegging plan and modification Total Amount(Excl. GST) for Schedule-A 141107.73160050003 SCHEDULE-B-OHE FOUNDATIONS 0.0 |
| 3 | Concrete for foundation & plinth (in other than hard and rock) 2 (a) Materials Cum 50.0 5277.12 263856.0 2 (b) Erection Cum 50.0 1982.2 99110.0 Total Amount(Excl. GST) for Schedule-B 362966.0 SCHEDULE-C-STEEL ITEMS 0.0 |
| 4 | Supply and erection of structural steel (traction mast) fabricated and galvanized, of all type B-Series Mast. 3 (a) Materials MT 5.0 82600.0 413000.0 3 (b) Erection MT 15.0 2875.42 43131.3 FIXTURES 0.0 |
| 5 | Supply and Erection of Fabricated steel other than masts 4 (a) Materials MT 20.0 103599.15 2071983.0 4 (b) Erection MT 20.0 8350.0 167000.0 Total Amount(Excl. GST) for Schedule-C 2695114.3 SCHEDULE-D-NON- FERROUS ITEMS 0.0 |
| 6 | Supply of 65 sqmm Cadmium Copper Catenary Wire |
| 7 | Supply of 107 sqmm HDGC Contact Wire |
| 8 | Supply and erection of large copper jumpers between Cross feeder and OHE 7(a) Materials Each 6.0 12084.75 72508.5 7(b) Erection Each 6.0 499.15 2994.8999999999996 |
| 9 | Supply and erection of 105 sq.mm (19/7/1.02 mm) large copper jumpers. 8(a) Materials Each 40.0 6611.02 264440.80000000005 8(b) Erection Each 40.0 499.15 19966.0 |
| 10 | Supply and Erection of Over Head Equipment Only 9(a) Materials Km 8.0 114470.34 915762.72 9(b) Erection Km 8.0 45436.44 363491.52 |
| 11 | Supply of 20 sq.mm. cadmium copper briddle wire |
| 12 | Supply and Erection of Span wire 11(a) Materials Mtr. 157.0 1298.31 203834.66999999998 11(b) Erection Mtr. 157.0 76.27 11974.39 |
| 13 | Supply and erection of Solid Copper bus bars,connector and Terminal 12(a) Supply of Solid Copper Bus-bar 18 mm. Mtr. 50.0 2452.54 122627.0 12(b) Erection of Solid Copper Bus-bar 18 mm. Mtr. 50.0 143.22 7161.0 12(c) Supply of Solid Copper Bus-bar Connector: Bus Terminal(RI-6310) Each 20.0 1727.97 34559.4 12(d) Erection of Solid Copper Bus-bar Connector: Bus Terminal(RI-6310) Each 20.0 58.47 1169.4 12(e) Supply of Solid Copper Bus-bar Connector: Bus Splice(RI-6320) Each 10.0 3838.14 38381.4 12(f) Erection of Solid Copper Bus-bar Connector: Bus Splice(RI-6320) Each 10.0 58.47 584.7 12(g) Supply of Solid Copper Bus-bar Connector: Bus tee Joint(RI-6330) Each 10.0 4520.34 45203.4 12(h) Erection of Solid Copper Bus-bar Connector: Bus tee Joint(RI-6330) Each 10.0 58.47 584.7 12(i) Supply of Solid Copper Bus-bar Connector: Bus terminating tee(RI-6351) Each 20.0 4261.02 85220.40000000001 12(j) Erection of Solid Copper Bus-bar Connector: Bus terminating tee(RI-6351) Each 20.0 58.47 1169.4 Total Amount(Excl. GST) for Schedule-D 3732043.673 SCHEDULE-E-INSULATORS |
| 14 | Supply of Stay arm Composite (CD 1600 mm) |
| 15 | Supply of Bracket Composite (CD 1600 mm) |
| 16 | Supply of 9-Ton Insulator Composite (CD 1600 mm) |
| 17 | Supply of Composite 9-Tonne (CD-1600 mm) & Sectioning Insulator for section insulator assembly |
| 18 | Suppply of 25 kV Post Insulator |
| 19 | Supply of Post insulator and Operating Rod Insulator for 25kV Single Pole Isolators (1600A) |
| 20 | Supply of Post insulator and Operating Rod Insulator for 25kV Double Pole Isolators (1600A) Total Amount(Excl. GST) for Schedule-E 662628.6399999999 SCHEDULE-F-FERROUS & MISCELLANEOUS ITEMS CANTILEVERS 0.0 0.0 |
| 21 | Supply without insulator and erection of a single bracket assembly suitable for tramway type overhead equipment (regulated) 20(a) Materials Each 20.0 7845.76 156915.2 20(b) Erection Each 20.0 1177.12 23542.399999999998 |
| 22 | Supply without insulator and erection of a pull-off arrangement for regulated Tramway type OHE 21(a) Materials Each 8.0 5289.83 42318.64 21(b) Erection (in PB) Each 8.0 593.22 4745.76 |
| 23 | Supply without Insulator and erection of mounting arrangement for span wire 22(a) Materials Each 5.0 6002.54 30012.7 22(b) Erection Each 5.0 1321.19 6605.950000000001 INSULATORS 0.0 0.0 |
| 24 | Supply without Insulator & erection of Section Insulator Assembly 23(a) Materials Each 3.0 42864.41 128593.23000000001 23(b) Erection Each 3.0 4524.58 13573.74 |
| 25 | Supply (without Insulator) and Erection of a Solid Core Suspension (9 Tonne) Insulator 24(a) Supply (without Insulator) and Erection of a Solid Core Suspension (9 Tonne) Insulator Each 10.0 1332.2 13322.0 24(b) Erection Each 10.0 527.12 5271.2 TERMINATION 0.0 0.0 |
| 26 | Supply and erection of a Guy Rod Assembly 25(a) Materials Each 5.0 7200.85 36004.25 25(b) Erection(in NPB) Each 5.0 1466.95 7334.75 |
| 27 | Supply and erection of a regulating equipment (3 Pulley type) with counter weight assembly for Tram Way Type OHE (Regulated) 26(a) Materials Each 10.0 44633.05 446330.5 26(b) Erection(in PB) Each 10.0 4199.15 41991.5 26(c) Marking/Paiting of temperature & 'Y'-measurement of OHE mast at BWA Locations Each 10.0 152.54 1525.3999999999999 |
| 28 | Supply without Insulator and erection of materials for termination of single conductor of overhead equipment or a terminating wire 27(a) Materials Each 16.0 4435.59 70969.44 27(b) Erection Each 16.0 1224.58 19593.28 |
| 29 | Supply without insulator and erectionb of anti-creep with cadmium copper catenary wire and With Composite Insulators suitable for tramway type OHE(Regulated) in polluted zone 28(a) Materials Each 5.0 5338.98 26694.899999999998 28(b) Erection Each 5.0 4057.63 20288.15 |
| 30 | Supply without Insulator and Erection of a 25 kV Post Insulator 29(a) Materials Each 10.0 704.24 7042.4 29(b) Erection Each 10.0 350.85 3508.5 |
| 31 | Supply (without Insulator) and Erection of 25kV Single Pole Isolators without earth contact assembly 30(a) Materials Each 5.0 37509.32 187546.6 30(b) Erection Each 5.0 4124.58 20622.9 |
| 32 | Supply (without Insulator) and Erection of 25kV Double Pole Isolators without earth contact assembly 31(a) Materials Each 2.0 66101.69 132203.38 31(b) Erection Each 2.0 4477.97 8955.94 |
| 33 | Extra for Supply & Erection of an Earth Contact Assembly in an Isolator 32(a) Materials Each 4.0 12581.36 50325.44 32(b) Erection Each 4.0 489.83 1959.32 BONDS 0.0 0.0 |
| 34 | Supply and Erection of Structure Bond 33(a) Materials Each 150.0 688.14 103221.0 33(b) Erection Each 150.0 359.32 53898.0 |
| 35 | Supply of Longitudinal Bond (C-Bond for X-over over) 34(a) Materials Each 200.0 404.24 80848.0 34(b) Erection Each 200.0 323.73 64746.0 |
| 36 | Supply & erection of a Transverse and Special Bond 35(a) Materials Each 200.0 882.2 176440.0 35(b) Erection Each 200.0 385.59 77118.0 NUMBER PLATE & CAUTION BOARDS 0.0 0.0 |
| 37 | Caution Board for 25KV Traction 36(a) Materials Each 10.0 316.95 3169.5 36(b) Erection Each 10.0 117.8 1178.0 MODIFICATION WORKS 0.0 0.0 |
| 38 | Transfer of equipment from one Mast/Support to another/ same mast or support 37(a) Materials Each 200.0 1950.85 390170.0 37(b) Erection Each 200.0 3660.17 732034.0 37(c) Provision of additional bracket assembly on a mast or support. Each 100.0 3249.15 324915.0 |
| 39 | Slewing and putting back of OHE in orignal shape |
| 40 | Splicing & extension of anchored Overhead Equipment |
| 41 | DISMANTLING WORKS 40(a) Dismantling of Over Head Equipment Km 1.0 17120.34 17120.34 MISCELLANEOUS 0.0 0.0 |
| 42 | Supply and Erection of Single Earth Electrode 41(a) Materials Each 20.0 2130.51 42610.200000000004 41(b) Erection Each 20.0 1455.93 29118.600000000002 |
| 43 | Extra for Supply & erection of additional fitting at a turnoutor, diamond crossing and overlap 42(a) Materials Each 40.0 7723.73 308949.19999999995 42(b) Erection Each 40.0 1810.17 72406.8 |
| 44 | Extra on Erection rate of work under power block. |
| 45 | Compliance of observation made by railway officials collection of field data (test result) & submission of various unit for approval & processing of EIG sanction Total Amount(Excl. GST) for Schedule-F 5290972.63 SCHEDULE-G-MODIFICATION OF POWER LINE CROSSING |
| 46 | 22 KV Power Line Crossing Work at VOC Port,Tuticorin. Total Amount(Excl. GST) for Schedule-G 2686448.0 SCHEDULE-H-SPARE ITEMS AND TOOLS & PLANTS FOR OHE ITEMS |
| 47 | Spare Items and Tools & Plants to be provided to Railways as per their requirements Total Amount(Excl. GST) for Schedule-H 386544.99 Total Amount(Excl. GST) from Schedule-A to Schedule-H 15957825.9646005 M/S. RR Dura Fabs -Broad Minds Infra (JV) QUANTITY SCHEDULE Qty Sch. No. IPRCL/08/QS-08 Name of the Work: \\"Design, Supply, Erection, Testing and Commissioning of Railway Electrification work (38 TKM) of Existing/Proposed VPT Railway line including modification to existing 25 KV AC 50HZ, single phase Tramway type Overhead Equipment (OHE) in connection with rail transport system at Visakhapatnam Port Trust, Andhra Pradesh in 3Phases” LOA No: IPRCL/MUMBAI/PROJECTS/VPT/OHE/ 2021/8 Dt:03.012022 Item No: 2(c) Concrete for foundations and plinth in other than hard soil and rock S No KM No Loc.No Chainage IMP Type of FDN Gross Volume (Cu.m) Scroll Volume (Cu.m) (-) Net Volume (Cu.m) DPR No DPR Date Remarks |
| 48 | R & D |
| 49 | R & D |
| 50 | R & D |
| 51 | R & D |
| 52 | R & D |
| 53 | R & D |
| 54 | R6 Total Volume (in Cu.m) 150.82800000000003 M/S. RR Dura Fabs -Broad Minds Infra (JV) QUANTITY SCHEDULE -08 3.Galvanised traction Mast (Rolled, Fabricated) including portal &TTC 3 (C ) NPB 3 (b) PB S No KM Loc No Type of Mast/ Boom B-150 B-175 B-200 B-200 (BR MAST) T-150 S-8 TTU TTB-1 (5.5) TTB-2 (8.0) TTK 1 &2 NU NE-1 NE-2 NB-1 (1.5) NB-2 (3.0) NB-3 (4.5) NB-4 (6.0) NB-5 (7.5) NB-6 (9.0) NC NK OU OE-1 OE-2 OB-1 (1.5) OB-2 (3.0) OB-3 (4.5) OB-4 (6.0) OB-5 (7.5) OB-6 (9.0) OC OK RU RE-1 RE-2 RB-1 (7.5) RB-2 (9.0) RB-3 (10.5) RB-4 (12.0) RB-5 (13.0) RC RK BFBU BE-1 BE-2 BFB-K GU GE-1 GE-2 GC GK B-150 B-175 B-200 B-200 (BR MAST) T-150 S-8 TTU TTB-1 (5.5) TTB-2 (8.0) TTK 1 &2 NU NE-1 NE-2 NB-1 (1.5) NB-2 (3.0) NB-3 (4.5) NB-4 (6.0) NB-5 (7.5) NB-6 (9.0) NC NK OU OE-1 OE-2 OB-1 (1.5) OB-2 (3.0) OB-3 (4.5) OB-4 (6.0) OB-5 (7.5) OB-6 (9.0) OC OK RU RE-1 RE-2 RB-1 (7.5) RB-2 (9.0) RB-3 (10.5) RB-4 (12.0) RB-5 (13.0) RC RK BFBU BE-1 BE-2 BFB-K GU GE-1 GE-2 GC GK DPR No DPR Date Remarks |
| 55 | R & D |
| 56 | R & D |
| 57 | R & D |
| 58 | R & D |
| 59 | R & D |
| 60 | R & D |
| 61 | R & D |
| 62 | R & D |
| 63 | R & D |
| 64 | R & D |
| 65 | R & D |
| 66 | R & D |
| 67 | R6 Total Qty (in Nos) 40.0 16.0 13.0 0.0 0.0 0.0 26.0 1.0 24.0 25.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Unit Payable Weight (in KGS) 369.69 422.89 474.19 570.23 357.102 1382.972 616.635 263.156 362.369 87.668 365.268 183.88 199.185 68.838 111.003 160.592 210.21 252.37 301.96 5.114 12.515 584.95 550.79 574.96 116.765 181.376 260.227 340.593 405.2 482.545 9.6 24.824 627.475 634.329 660.563 432.588 507.71 586.463 665.248 717.88 12.02 25.778 803.725 285.062 301.439 15.355 1120.738 552.44 576.99 8.54 32.41 369.69 423.795 474.19 570.23 357.102 1382.972 616.635 281.272 382.567 87.668 365.268 183.88 199.185 68.838 111.003 160.592 210.21 252.37 301.96 5.114 12.575 584.95 550.79 574.96 116.765 181.376 260.227 340.593 405.2 482.545 9.6 24.824 627.475 634.329 660.563 432.588 507.71 586.463 665.248 717.88 12.02 25.778 803.725 285.062 301.44 15.355 1120.738 552.44 576.99 8.54 32.41 Total Weight (in KGS) 14787.6 6766.24 6164.47 0.0 0.0 0.0 16032.51 263.156 8696.856 2191.7000000000003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Grand Total Weight (in Kgs) 54902.532 0.0 Grand Total Weight (in MT) 54.902532 54.903 0.0 45.306 5.545 50.851 M/S. RR Dura Fabs -Broad Minds Infra (JV) QUANTITY SCHEDULE -08 DM DA & SPS Bracket SPS Guyrod SPS Bracket Guyrod Anticreep S.No Km. No Loc.No Type ofMast/ DA Erection Dismantling Re-Erection B-200 (3.85) B-200 (4.35) B-200 (4.85) DA-1(6x6)0076-1 DA-2(8x6)0076-1A 9201-4 9201-5 9201-5A 9201-6 9201-10 8054-1 8054-2 8054-3 3131-1 3131-2 3131-3 3076-1 3076-2 3076-3 3076-4 3076-5 3076-6 3076-7 3076-8 3050.0 3100.0 3110.0 3310.0 3121.0 3122.0 3123.0 3124.0 8031.0 8032-1 8032-2 8032-3 8032-4 8032-6 3241.0 3242.0 3243.0 3251.0 3252.0 3253.0 3254.0 3261.0 3262.0 3271.0 3272.0 3273.0 3281.0 3282.0 3283.0 3291.0 3292.0 DMA 4(c) 4(b) 12( C') 12( b') 39(b) 21( C') 21( b') A-9(b) B-9(bx)(i) 32/9(b) DPR No. DPR Date Remarks Unit Weights E D RE 195.426 219.444 243.628 121.76 164.9 14.986 6.39 7.88 9.49 1.484 2.61 3.13 3.465 4.18 4.59 4.96 1.035 1.26 1.485 1.687 3.045 3.625 3.886 2.726 31.96 62.353 60.778 137.302 21.0 2.43 2.43 2.43 2.118 3.074 3.654 3.994 2.784 2.668 8.873 10.086 7.15 10.2 11.9 2.8 3.306 10.5 12.2 5.88 8.74 6.552 12.367 14.461 9.939 12.8 3.6 5.6 E PB E PB PBD RE E PB D PBD RE E I PB D S&E I PB |
| 68 | R & D |
| 69 | R & D |
| 70 | R & D |
| 71 | R & D |
| 72 | R & D |
| 73 | R & D |
| 74 | R & D |
| 75 | R & D |
| 76 | L-17A |
| 77 | R & D |
| 78 | R & D |
| 79 | R & D |
| 80 | R & D |
| 81 | R & D |
| 82 | R & D |
| 83 | R6 Total Qty: 0.0 15.0 10.0 68.0 11.0 158.0 158.0 0.0 0.0 158.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 57.0 57.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 57.0 20833.26300000001 0.0 0.0 0.0 0.0 0.0 57.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Wt (in MT): 20.833 0.0 0.0 3291.66 2436.2799999999997 8279.68 1813.9 2367.788 1009.62 0.0 0.0 234.472 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 505.76099999999997 574.902 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 319.2 20.833262999999995 M/S. RR Dura Fabs -Broad Minds Infra (JV) QUANTITY SCHEDULE Qty Sch. No. IPRCL/08/QS-08 Name of the Work: \\"Design, Supply, Erection, Testing and Commissioning of Railway Electrification work (38 TKM) of Existing/Proposed VPT Railway line including modification to existing 25 KV AC 50HZ, single phase Tramway type Overhead Equipment (OHE) in connection with rail transport system at Visakhapatnam Port Trust, Andhra Pradesh in 3Phases” LOA No: IPRCL/MUMBAI/PROJECTS/VPT/OHE/ 2021/8 Dt:03.012022 Phase-I-PART-G-NS ITEMS : Item No: 79 Transportation Facility - Hiring ofVehicles-Innova,Tavera or Similar SUV(AC) S No Name of the Month No. of Months Remarks |
| 84 | 44621.0 |
| 85 | 44652.0 |
| 86 | 44682.0 |
| 87 | 44713.0 |
| 88 | 44743.0 |
| 89 | 44774.0 |
| 90 | 44805.0 |
| 91 | 44835.0 |
| 92 | 44866.0 |
| 93 | 44896.0 |
| 94 | 44927.0 |
| 95 | 44958.0 |
| 96 | 44986.0 |
| 97 | 45017.0 |
| 98 | 45047.0 Total No.of Months 15.0 M/s.Shree Electricals & Engineers (I) Pvt Ltd Sr.No.253/1, Plot No.4, Tirumala Industrial Estate, Hinjewadi Phase-II, Pune - 411 057. QUANTITY SCHEDULE for Schedule-A SOR Items Qty Sch. No. SEEIPL/SC/27/QS-40 Dt: Name of the Work: \\"Design, Supply, Erection, Testing and Commissioning of 25 kV, 50Hz Single Phase a.c. Traction Overhead Equipment with 65sq.mm Catenary and 107/150sq.mm HDG Copper Contact Wire, LT Supply Transformer Stations including modifications to the existing OHE in view of Proposed third line between Kondapalli (excl.) and Yerrupalem (incl.) of Kazipet-Vijayawada section under South Central Railway\\" LOA No:01432550001462, Dt.28.05.2019 Agreement No: E.29/C/TRD/SC/27/2018-19, Dt.17.09.2019 BWA Feeder B-series Feeder NU/OU/RU Isolator B-series/TTU Isolator TTU/NU/OU/RU AT BWA (E) BWA(D) FTA (E) FTA (D) Fdr.Anc (E)(D) Cut-in Insulator (E) Suspn. Insulaor (E) Post Insulaor(E) Section Insulator Assy.(E) (D) PTFE SP Isolator(E) (D) Bus Bar Connectors Auxilary Transformers(E) (D) Jumpers 160 Sq.mm Jumper Jumpers Trurn Outs S.No Km. No Loc.No Type ofMast Erection Dismantling Re-Erection 3241.0 3243.0 3251.0 3252.0 3291.0 3292.0 5062-4 3076-4 5062-5 5062-6 5062-7 8012.0 8014.0 8015.0 8016.0 8021.0 8051.0 8052.0 8053.0 8053-1 8054-1 8054-2 8054-3 9031-3 9032-6 5513-6 5513-8 9034-3 3076-4 9036.0 9037.0 9039.0 9039A 9033-1 9035-1 9033-2 9035-2 9027.0 9038.0 9038A 9061.0 9062.0 9063.0 S-110 A-3(c), B-3('c) A-32/3(b) A-8(a)(v) 32/8(a)(v) 8(a)(xii) 31(t)(i) 32/31(t)(i) A-8(b)(ii) B-8(bx)(i) 32/8(b)(ii) 31(t)(v) 32/31(t)(v) 39(d) A-8(b)(iii) B-8(bx)(i) 32/8(b)(iii) 31(t)(vii) A-11(a)(i) B-8(bx)(i) 32/11(a)(i) A-11(a)(ii) B-11(ax)(i) 32/11(a)(ii) A-11(b) B-11(bx) 32/11(b) 31(j) A-12(a) B-12(ax) 32/12(a) A-12('c) B-12(cx) 32/12('c) 31(g) 32/31(g) 12(d) A-13(a) B-13(ax) 32/13(a) 13(d) 13(e) 31(i) 32/31(i) 26(a)(ii) 26(a)(iii) 27(a) 28.0 30(b)(iii) 17(a) 17( c) 31(t)(viii) 15(a) 50Sqmm 105Sqmm 160Sqmm 32/15(a) 15(e) 160Sqmm 32/15(e) 31(t)(iv) 32/31(t)(iv) 39(i) 10(a) 32/10(a) 105Sqmm 39(e) DPR NO DPR DATE Remarks Unit Weights E D RE 8.873 7.15 14.59 16.99 12.8 3.6 4.537 1.687 6.352 7.562 9.045 1.77 2.566 8.7 1.403 31.1 52.636 2.61 3.19 3.48 2.61 3.13 3.465 1.178 1.163 1.147 2.436 3.533 1.687 19.584 5.51 10.416 10.416 1.612 4.898 1.922 5.84 23.41 12.348 12.348 8.7 12.304 7.47 29.949 S&E PB E PB E D PBD E I PB D PBD RE S&E I PB D S&E I PB S&E I PB S&E I PB D S&E I PB S&E I PB D PBD S&E S&E I PB S&E S&E D PBD S&E S&E E S&E S&E S&E S&E D E Mtrs Mtrs Mtrs PB E Mtrs PB D PBD RE S&E PB Mtrs RE |
| 99 | 560.0 |
| 100 | 560.0 |
| 101 | 560.0 |
| 102 | 561.0 |
| 103 | 561.0 |
| 104 | 561.0 |
| 105 | 561.0 |
| 106 | 562.0 |
| 107 | 562.0 |
| 108 | 562.0 |
| 109 | 562.0 |
| 110 | 545.0 |
| 111 | 545.0 |
| 112 | 545.0 |
| 113 | 545.0 |
| 114 | 545.0 |
| 115 | 545.0 |
| 116 | 544.0 |
| 117 | 544.0 |
| 118 | 544.0 |
| 119 | 544.0 |
| 120 | 544.0 |
| 121 | 543.0 |
| 122 | 543.0 |
| 123 | 543.0 |
| 124 | 544.0 |
| 125 | 554.0 |
| 126 | 554.0 |
| 127 | 554.0 |
| 128 | 555.0 |
| 129 | 555.0 |
| 130 | 555.0 |
| 131 | 556.0 |
| 132 | 556.0 |
| 133 | 5555.0 |
| 134 | 556.0 |
| 135 | 555.0 |
| 136 | 555.0 |
| 137 | 555.0 |
| 138 | 555.0 |
| 139 | 556.0 |
| 140 | 556.0 |
| 141 | 555.0 |
| 142 | 555.0 |
| 143 | 545.0 |
| 144 | 545.0 |
| 145 | 544.0 |
| 146 | 545.0 |
| 147 | 556.0 |
| 148 | 555.0 |
| 149 | 555.0 |
| 150 | 554.0 |
| 151 | 545.0 |
| 152 | 544.0 |
| 153 | 554.0 |
| 154 | 555.0 |
| 155 | 555.0 |
| 156 | 555.0 |
| 157 | 556.0 |
| 158 | 565.0 |
| 159 | 556.0 |
| 160 | 557.0 |
| 161 | 556.0 |
| 162 | 556.0 |
| 163 | 553.0 |
| 164 | 554.0 |
| 165 | 554.0 |
| 166 | 554.0 |
| 167 | 554.0 |
| 168 | 554.0 |
| 169 | 554.0 |
| 170 | 554.0 |
| 171 | 554.0 |
| 172 | 554.0 |
| 173 | 554.0 |
| 174 | 554.0 |
| 175 | 554.0 |
| 176 | 557.0 |
| 177 | 557.0 |
| 178 | 555.0 |
| 179 | 555.0 |
| 180 | 555.0 |
| 181 | 555.0 |
| 182 | 555.0 |
| 183 | 555.0 |
| 184 | 555.0 |
| 185 | 555.0 |
| 186 | 555.0 |
| 187 | 556.0 |
| 188 | 556.0 |
| 189 | 556.0 |
| 190 | 556.0 |
| 191 | 556.0 |
| 192 | 556.0 |
| 193 | 556.0 |
| 194 | 554.0 |
| 195 | 554.0 |
| 196 | 554.0 |
| 197 | 554.0 |
| 198 | 554.0 |
| 199 | 543.0 |
| 200 | 543.0 |
| 201 | 543.0 |
| 202 | 544.0 |
| 203 | 544.0 |
| 204 | 544.0 |
| 205 | 545.0 |
| 206 | 545.0 |
| 207 | 545.0 |
| 208 | 545.0 |
| 209 | 545.0 |
| 210 | 555.0 |
| 211 | 555.0 |
| 212 | 555.0 |
| 213 | 555.0 |
| 214 | 555.0 |
| 215 | 555.0 |
| 216 | 555.0 |
| 217 | 554.0 |
| 218 | 554.0 |
| 219 | 554.0 |
| 220 | 554.0 |
| 221 | 554.0 |
| 222 | 554.0 |
| 223 | 554.0 |
| 224 | 554.0 |
| 225 | 554.0 |
| 226 | 554.0 |
| 227 | 554.0 Total Qty: 21.0 0.0 1.0 4.0 0.0 0.0 42.0 42.0 2.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 32.0 0.0 0.0 8.0 0.0 8.0 8.0 0.0 0.0 12.0 3.0 8.0 2.0 5.0 5.0 5.0 5.0 5.0 5.0 10.0 1660.3270000000002 614.976 26.0 0.0 0.0 20.0 15.0 50.0 50.0 0.0 21.0 16.0 0.0 9.0 9.0 8.0 0.0 13.0 13.0 13.0 22.0 22.0 17.0 66.0 66.0 56.0 0.0 14.0 14.0 14.0 0.0 0.0 0.0 0.0 0.0 0.0 14.0 14.0 14.0 0.0 0.0 4.0 0.0 102.0 38.0 5.0 5.0 5.0 0.0 0.0 1.0 59.0 0.0 0.0 176.0 54.0 0.0 0.0 0.0 0.0 0.0 0.0 28.0 28.0 0.0 0.0 Total Wt (in MT): 1.66 0.615 186.333 0.0 14.59 67.96 0.0 0.0 190.554 70.854 12.704 60.496 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 47.12 37.216 28.264 0.0 156.672 44.08 0.0 0.0 19.344 14.693999999999999 15.376 11.68 117.05 61.74 61.74 43.5 61.52 37.35 299.49 1660.327 1.0 1.0 560.0 C24 OU E 2.0 1.0 231.0 27.09.2022 560.0 C24 OU D 1.0 1.0 231.0 27.09.2022 560.0 C23 OU D 2.0 2.0 231.0 27.09.2022 560.0 C23 OU E 2.0 4.0 4.0 4.0 8.0 4.0 8.0 4.0 4.0 231.0 27.09.2022 560.0 C24 OU E 1.0 2.0 2.0 2.0 4.0 2.0 4.0 2.0 2.0 231.0 27.09.2022 562.0 C12 NU E 1.0 2.0 2.0 2.0 2.0 2.0 1.0 1.0 232.0 28.09.2022 562.0 C13 NU E 1.0 2.0 2.0 2.0 2.0 2.0 1.0 1.0 232.0 28.09.2022 562.0 C14 NU E 1.0 2.0 2.0 2.0 2.0 2.0 1.0 1.0 232.0 28.09.2022 562.0 C16 B-200 E 1.0 1.0 1.0 232.0 28.09.2022 561.0 C17 B-150 E 2.0 2.0 1.0 1.0 233.0 30.09.2022 561.0 C18 B-150 E 2.0 2.0 1.0 1.0 233.0 30.09.2022 561.0 C19 B-200 E 2.0 2.0 1.0 1.0 233.0 30.09.2022 561.0 C20 B-200 E 2.0 2.0 1.0 1.0 233.0 30.09.2022 561.0 C21 B-200 E 2.0 2.0 1.0 1.0 233.0 30.09.2022 E 1.0 2.0 2.0 2.0 2.0 2.0 0.0 1.0 1.0 1.0 234.0 03.10.2022 E 2.0 2.0 1.0 1.0 234.0 03.10.2022 E 2.0 2.0 1.0 1.0 234.0 03.10.2022 E 2.0 2.0 1.0 1.0 234.0 03.10.2022 E 2.0 2.0 1.0 1.0 234.0 03.10.2022 E 2.0 2.0 1.0 1.0 234.0 03.10.2022 M/s.Shree Electricals & Engineers (I) Pvt Ltd Sr.No.253/1, Plot No.4, Tirumala Industrial Estate, Hinjewadi Phase-II, Pune - 411 057. QUANTITY SCHEDULE for Schedule-A SOR Items Qty Sch. No. SEEIPL/SC/27/QS-40 Dt: Name of the Work: \\"Design, Supply, Erection, Testing and Commissioning of 25 kV, 50Hz Single Phase a.c. Traction Overhead Equipment with 65sq.mm Catenary and 107/150sq.mm HDG Copper Contact Wire, LT Supply Transformer Stations including modifications to the existing OHE in view of Proposed third line between Kondapalli (excl.) and Yerrupalem (incl.) of Kazipet-Vijayawada section under South Central Railway\\" LOA No: 01432550001462, Dt.28.05.2019 Agreement No: E.29/C/TRD/SC/27/2018-19, Dt.17.09.2019 6(a) 33/6(a) 32/6(a) 6(c) 33/6(c) 32/6(c) 31(a) 32/31(a) 31(d) 32/31(d) 31(f) 32/31(f) 31(h) 32/31(h) 31(t)(xii) 31(t)(xii) 32/31(t)(xii) 31(t)(Xi) 32/31(t)(Xi) 7(d) 7(e) 31(e) B-15(a)(ii) S.No Erection Dismantaling Slewing Catenary Wire Contact Wire Feeder Wire Large Span Wire Cross Feeder Wire LOP No. &Wire Run No. Track Ref.Main.Ln/Loop.Ln/Side.Ln/XO.Ln/ FromLoc No. FromChainage(Mtrs) ToLoc No. ToChainage (Mtrs) Tension Lenth (Mtrs) Erec.of Conv.OHE Erec.of Conv.OHEManual Erec.of Conv.OHE Power Block Erec.of Tramw.OHE Erec.of Tramw.OHEManual Erec.of Tramw.OHE Power Block Transfer of OHE Transfer of OHEPower Block Dismntl. of Conv.OHE Dismntl. of Conv.OHE Power Block Splicing of Conductors Splicing of Conductors Power Block Slewing of OHE Slewing of OHE Power Block Re Audj.of Conv.OHE Spans Re Audj.of Conv.OHE Spans Re Audj.of Conv.OHE Spans Power Block Dismantl.of Existing Droppers Dismantl. of Existing Droppers Power Block Erection of Alumn. Feeder Wire Erection of Copper Cross Feeders Dismantl. of Alumn. Feeder Wire Erec.of Large Span Wire DPR NO DPR DATE Remarks E D S Mtrs Mtrs Mtrs Mtrs Mtrs Mtrs Km Km Km Each Each Mtrs Mtrs Each Each Each Span Each Span Each Span Mtrs Each Span Each Span Each Span Km Mtrs Km Mtrs |
| 228 | 568/04 568/02 1.0 1.0 213.0 06.08.2022 Power Block CC36 568/02 568/46 1.0 1.0 213.0 06.08.2022 Power Block CC36 568/46 568/44 1.0 1.0 213.0 06.08.2022 Power Block CC36 568/17 568/15 1.0 27.0 1.0 214.0 08.08.2022 Power Block CC36 568/15 568/13 1.0 27.0 1.0 214.0 08.08.2022 Power Block CC36 569/9 569/11 1.0 49.5 1.0 215.0 17.08.2022 Power Block CC36 569/11 569/13 1.0 63.0 1.0 215.0 17.08.2022 Power Block CC36 569/13 569/15 1.0 45.0 1.0 215.0 17.08.2022 Power Block CC36 569/15 569/17 1.0 45.0 1.0 215.0 17.08.2022 Power Block CC36 569/17 569/19 1.0 49.5 1.0 215.0 17.08.2022 Power Block CC36 569/7 569/9 1.0 45.0 1.0 215.0 17.08.2022 Power Block CC36 563/24 563/26 1.0 49.5 1.0 216.0 18.08.2022 Power Block CC36 563/26 563/28 1.0 54.0 1.0 216.0 18.08.2022 Power Block CC36 563/28 563/30 1.0 49.5 1.0 216.0 18.08.2022 Power Block CC36 563/30 563/32 1.0 54.0 1.0 216.0 18.08.2022 Power Block CC36 563/32 563/34 1.0 54.0 1.0 216.0 18.08.2022 Power Block CC36 563/34 563/36 1.0 54.0 1.0 216.0 18.08.2022 Power Block CC36 563/22 563/24 1.0 40.5 1.0 216.0 18.08.2022 Power Block CC36 |
| 229 | 568/C19 568/C20 2.0 2.0 54.0 2.0 227.0 25.08.2022 Power Block CC36 568/C20 568/C21 2.0 2.0 54.0 2.0 227.0 25.08.2022 Power Block CC36 568/C20 569/C1 2.0 2.0 108.0 2.0 227.0 25.08.2022 Power Block CC36 569/C1 569/C2 2.0 2.0 63.0 2.0 227.0 25.08.2022 Power Block CC36 569/C2 569/C3 2.0 2.0 63.0 2.0 227.0 25.08.2022 Power Block CC36 569/C3 569/C4 2.0 2.0 63.0 2.0 227.0 25.08.2022 Power Block CC36 569/C4 569/C5 2.0 2.0 49.5 2.0 227.0 25.08.2022 Power Block CC36 569/C5 569/C6 2.0 2.0 63.0 2.0 227.0 25.08.2022 Power Block CC36 569/1032A 1034A 2.0 2.0 45.0 2.0 228.0 26.08.2022 Power Block CC36 569/1036 1040.0 2.0 2.0 45.0 2.0 228.0 26.08.2022 Power Block CC36 569/14 569/14A 2.0 2.0 40.5 2.0 228.0 26.08.2022 Power Block CC36 569/14A 569/16 2.0 2.0 36.0 2.0 228.0 26.08.2022 Power Block CC36 569/16 569/16A 2.0 2.0 40.5 2.0 228.0 26.08.2022 Power Block CC36 569/33 569/35 2.0 2.0 36.0 2.0 228.0 26.08.2022 Power Block CC36 569/35 569/39 2.0 2.0 49.5 2.0 228.0 26.08.2022 Power Block CC36 569/39 569/44 2.0 2.0 36.0 2.0 228.0 26.08.2022 Power Block CC36 569/44 570/2 2.0 2.0 40.5 2.0 228.0 26.08.2022 Power Block CC36 570/2 570/4 2.0 2.0 54.0 2.0 228.0 26.08.2022 Power Block CC36 |
| 230 | 555/C15 555/C16 60.0 60.0 154.0 power Block 555/C12 555/C9 100.0 100.0 154.0 power Block 555/C10 555/C12 56.0 56.0 154.0 power Block 555/C5 555/C8 77.0 77.0 154.0 power Block 555/C6 555/C8 46.0 46.0 154.0 power Block 555/C3 555/C4 34.0 34.0 154.0 power Block 555/C2 555/C3 30.0 30.0 155.0 power Block 554/C1 555/C3 59.0 59.0 155.0 power Block 554/C4 554/C11 47.5 47.5 155.0 power Block 554/C11 554/C6 35.0 35.0 155.0 power Block 554/17 554/C10 66.0 66.0 155.0 power Block 0.0 0.0 0.0 0.0 0.0 Total Qty 9721.5 9721.5 7996.5 0.0 0.0 0.0 392.0 327.0 288.5 288.5 26.0 10.0 11.0 11.0 382.0 10287.0 382.0 0.0 0.0 0.0 0.0 0.0 610.5 Total Qty (in KM) 9.7215 9.7215 7.9965 Km Km Km 0.2885 0.2885 10.287 0.0 0.0 0.0 0.0 0.0 0.6105 Note (Unit Weight of Sch B-2 Copper Items has considered from \\"Part-N\\" Annexure-4 of Agreement) 6(a)(iv)=Supply of 5mm solid round hard drawn copper wire => 6(a)+31(t)(xii)=>9.722+10.287=20.009*200mtrs/KM*0.1746Kg/mtr =>698.714Kgs 15(a)(iii)=Supply of 105 sq.mm Annealed Stranded Copper jumper wire => 15(a)=>3.9mtr*0.982 Kg/mtr => 3.830 Kgs 15(a)(i)=Supply of 160 sq.mm Annealed Stranded Copper jumper wire => 15(e)+ 15(a)=>(0mtr+176mtr)*1.504Kg/mtr => 264.704 Kgs 15(a)(ii)=Supply of 130 sq.mm cadmium copper large span wire => 15(a)(iii)=>128mtr*1.1692 Kg/mtr => 149.658 Kgs 15(a)(iv)=Supply of 50 sq.mm Annealed Stranded Copper jumper wire => 6(a)=> 9.722*6mtr/KM=58.332 +15(a)=0=>58.332*0.4352Kg/mtr => 25.386Kgs M/s.Shree Electricals & Engineers (I) Pvt Ltd Sr.No.253/1, Plot No.4, Tirumala Industrial Estate, Hinjewadi Phase-II, Pune - 411 057. QUANTITY SCHEDULE for Schedule-A SOR Items Qty Sch. No. SEEIPL/SC/27/QS-40 Dt. Name of the Work: \\"Design, Supply, Erection, Testing and Commissioning of 25 kV, 50Hz Single Phase a.c. Traction Overhead Equipment with 65sq.mm Catenary and 107/150sq.mm HDG Copper Contact Wire, LT Supply Transformer Stations including modifications to the existing OHE in view of Proposed third line between Kondapalli (excl.) and Yerrupalem (incl.) of Kazipet-Vijayawada section under South Central Railway\\" LOA No: 01432550001462, Dt.28.05.2019 Agreement No: E.29/C/TRD/SC/27/2018-19, Dt.17.09.2019 Item No.16(a) - Supply and Erection of structure bonds Item No.16(a)(ii) - Dismantiling of Structure bonds Item No.16(b) - Supply & Erection of Longitudinal bond Item No.16( c) - Supply & Erection of transverse and special bonds Item No.16( c)(ii) - Dismantiling of transverse and special bonds Item No.17(a) - Supply and Erection of a earth electrode S No From To Erection Dismantaling Re-Erection 16(a) 16(a)(ii) 16(a)(iii) 16(a)(iv) 16(b) 16(b)(ii) 16(b)(iii) 16(b)(iv) 16('c) 16('c) (ii) 16('c) (iii) 16('c) (iv) 17('c) 17(a) 17(d) 16(aa) DPR No DPR Date Remarks Km.No Loc.No Km.No Loc.No Str. Bond Dismantl.of Str. Bond Re Erection of Str. Bond Erection of Structure Bond (NI Working) L-Bond Dismantling of L- Bond Re Erection of L- Bond Erection of L- Bond (NI Working) Transverse Bond Dis. of Transverse Bond Re Erection of Transverse Bond Erection of Transverse Bond (NI Working) Earth Bus in Mtrs Erection of Earth Electrode Erection of Copper Strips for Equipment Drilling of Holes on Rails |
| 231 | 569.0 569.0 C16 569.0 29.0 E 25.0 58.0 28.09.2022 CC36 569.0 32.0 569.0 33.0 E 13.0 58.0 28.09.2022 CC36 569.0 33.0 569.0 36.0 E 3.0 58.0 28.09.2022 CC36 569.0 33.0 569.0 35.0 E 25.0 58.0 28.09.2022 CC36 569.0 38.0 569.0 40.0 E 15.0 58.0 28.09.2022 CC36 569.0 40A 569.0 42.0 E 19.0 58.0 28.09.2022 CC36 569.0 42.0 569.0 44.0 E 8.0 58.0 28.09.2022 CC36 570.0 2.0 569.0 46.0 E 8.0 58.0 28.09.2022 CC36 568.0 C14 568.0 C15 E 13.0 58.0 28.09.2022 CC36 568.0 C15 568.0 1017.0 E 10.0 58.0 28.09.2022 CC36 568.0 C16 568.0 C17 E 2.0 58.0 28.09.2022 CC36 568.0 C17 568.0 C18 E 11.0 58.0 28.09.2022 CC36 568.0 C18 568.0 C19 E 7.0 58.0 28.09.2022 CC36 KI 1002A KI 1004A E 20.0 58.0 28.09.2022 CC36 KI 1006A KI 1008A E 2.0 58.0 28.09.2022 CC36 KI 1016A KI 1018A E 2.0 58.0 28.09.2022 CC36 KI 1018A KI 1020A E 2.0 58.0 28.09.2022 CC36 KI 1032A KI 1040A E 15.0 58.0 28.09.2022 CC36 KI 1052.0 KI 1040.0 E 12.0 58.0 28.09.2022 CC36 569.0 4.0 569.0 6.0 E 2.0 61.0 29.09.2022 CC36 569.0 C9 569.0 C10 E 6.0 61.0 29.09.2022 CC36 569.0 C11 569.0 C12 E 6.0 61.0 29.09.2022 CC36 569.0 C12 569.0 C13 E 1.0 61.0 29.09.2022 CC36 569.0 C13 569.0 C15 E 6.0 61.0 29.09.2022 CC36 569.0 C11 569.0 1036A E 8.0 61.0 29.09.2022 CC36 569.0 14.0 569.0 16A E 3.0 61.0 29.09.2022 CC36 569.0 16.0 569.0 18.0 E 1.0 61.0 29.09.2022 CC36 569.0 18.0 569.0 20.0 E 4.0 61.0 29.09.2022 CC36 569.0 C16 569.0 29.0 E 3.0 61.0 29.09.2022 CC36 569.0 32.0 569.0 33.0 E 6.0 61.0 29.09.2022 CC36 569.0 33.0 569.0 36.0 E 1.0 61.0 29.09.2022 CC36 569.0 33.0 569.0 35.0 E 8.0 61.0 29.09.2022 CC36 569.0 40A 569.0 42.0 E 3.0 61.0 29.09.2022 CC36 569.0 42.0 569.0 44.0 E 2.0 61.0 29.09.2022 CC36 569.0 44.0 569.0 46.0 E 1.0 61.0 29.09.2022 CC36 KI 1032A KI 1040.0 E 3.0 62.0 29.09.2022 CC36 568.0 C14 568.0 C15 E 5.0 62.0 29.09.2022 CC36 568.0 C15 KI 1017.0 E 1.0 62.0 29.09.2022 CC36 569.0 2.0 E 4.0 63.0 29.09.2022 CC36 569.0 4.0 E 4.0 63.0 29.09.2022 CC36 569.0 6.0 E 4.0 63.0 29.09.2022 CC36 569.0 8.0 E 4.0 63.0 29.09.2022 CC36 569.0 10.0 E 4.0 63.0 29.09.2022 CC36 569.0 14.0 E 4.0 63.0 29.09.2022 CC36 569.0 16.0 569.0 18.0 E 3.0 63.0 29.09.2022 CC36 569.0 24.0 569.0 24A E 3.0 63.0 29.09.2022 CC36 569.0 28.0 569.0 30.0 E 3.0 63.0 29.09.2022 CC36 569.0 30.0 569.0 33.0 E 3.0 63.0 29.09.2022 CC36 569.0 C16 569.0 C17 E 4.0 63.0 29.09.2022 CC36 569.0 36.0 569.0 38.0 E 4.0 63.0 29.09.2022 CC36 569.0 44.0 569.0 46.0 E 2.0 63.0 29.09.2022 CC36 568.0 60.0 E 4.0 63.0 29.09.2022 CC36 568.0 58.0 E 4.0 63.0 29.09.2022 CC36 568.0 56.0 E 4.0 63.0 29.09.2022 CC36 568.0 52.0 E 1.0 63.0 29.09.2022 CC36 560.0 C2 E 1.0 1.0 79.0 09.11.2022 |
| 232 | 560.0 |
| 233 | 559.0 |
| 234 | 560.0 |
| 235 | 560.0 |
| 236 | 560.0 |
| 237 | 560.0 |
| 238 | 560.0 |
| 239 | 562.0 |
| 240 | 559.0 |
| 241 | 560.0 |
| 242 | 560.0 |
| 243 | 560.0 |
| 244 | 561.0 |
| 245 | 561.0 |
| 246 | 561.0 |
| 247 | 561.0 |
| 248 | 561.0 |
| 249 | 561.0 |
| 250 | 561.0 |
| 251 | 561.0 |
| 252 | 561.0 |
| 253 | 560.0 |
| 254 | 560.0 |
| 255 | 560.0 |
| 256 | 560.0 |
| 257 | 560.0 |
| 258 | 560.0 |
| 259 | 560.0 |
| 260 | 560.0 |
| 261 | 560.0 |
| 262 | 560.0 |
| 263 | 560.0 |
| 264 | 560.0 |
| 265 | 560.0 |
| 266 | 560.0 |
| 267 | 560.0 |
| 268 | 560.0 |
| 269 | 560.0 |
| 270 | 560.0 |
| 271 | 560.0 |
| 272 | 560.0 |
| 273 | 560.0 |
| 274 | 560.0 |
| 275 | 560.0 |
| 276 | 560.0 |
| 277 | 560.0 |
| 278 | 560.0 |
| 279 | 560.0 |
| 280 | 560.0 |
| 281 | 560.0 |
| 282 | 560.0 |
| 283 | 560.0 |
| 284 | 560.0 |
| 285 | 560.0 |
| 286 | 560.0 |
| 287 | 560.0 |
| 288 | 560.0 |
| 289 | 560.0 |
| 290 | 560.0 |
| 291 | 561.0 |
| 292 | 561.0 |
| 293 | 561.0 |
| 294 | 561.0 |
| 295 | 561.0 |
| 296 | 561.0 |
| 297 | 561.0 |
| 298 | 561.0 |
| 299 | 561.0 |
| 300 | 561.0 |
| 301 | 561.0 |
| 302 | 561.0 |
| 303 | 561.0 |
| 304 | 561.0 |
| 305 | 561.0 |
| 306 | 561.0 |
| 307 | 561.0 |
| 308 | 561.0 |
| 309 | 561.0 |
| 310 | 561.0 |
| 311 | 561.0 |
| 312 | 561.0 |
| 313 | 561.0 |
| 314 | 561.0 |
| 315 | 561.0 |
| 316 | 561.0 |
| 317 | 561.0 |
| 318 | 561.0 |
| 319 | 561.0 |
| 320 | 561.0 |
| 321 | 561.0 |
| 322 | 561.0 |
| 323 | 561.0 |
| 324 | 562.0 |
| 325 | 562.0 |
| 326 | 562.0 |
| 327 | 562.0 |
| 328 | 562.0 |
| 329 | 561.0 |
| 330 | 562.0 |
| 331 | 562.0 |
| 332 | 562.0 |
| 333 | 562.0 |
| 334 | 562.0 |
| 335 | 562.0 |
| 336 | 562.0 |
| 337 | 562.0 |
| 338 | 562.0 |
| 339 | 562.0 |
| 340 | 562.0 |
| 341 | 562.0 |
| 342 | 563.0 |
| 343 | 563.0 |
| 344 | 562.0 |
| 345 | 562.0 |
| 346 | 562.0 |
| 347 | 562.0 |
| 348 | 562.0 |
| 349 | 562.0 |
| 350 | 562.0 |
| 351 | 562.0 |
| 352 | 563.0 |
| 353 | 562.0 |
| 354 | 562.0 |
| 355 | 562.0 |
| 356 | 562.0 |
| 357 | 562.0 |
| 358 | 562.0 |
| 359 | 562.0 |
| 360 | 562.0 |
| 361 | 562.0 |
| 362 | 562.0 |
| 363 | 562.0 |
| 364 | 562.0 |
| 365 | 562.0 |
| 366 | 563.0 |
| 367 | 563.0 |
| 368 | 561.0 |
| 369 | 561.0 |
| 370 | 561.0 |
| 371 | 562.0 |
| 372 | 562.0 |
| 373 | 562.0 |
| 374 | 562.0 |
| 375 | 562.0 |
| 376 | 562.0 |
| 377 | 562.0 |
| 378 | 562.0 |
| 379 | 562.0 |
| 380 | 562.0 |
| 381 | 562.0 |
| 382 | 561.0 |
| 383 | 561.0 |
| 384 | 561.0 |
| 385 | 561.0 |
| 386 | 561.0 |
| 387 | 561.0 |
| 388 | 561.0 |
| 389 | 561.0 |
| 390 | 561.0 |
| 391 | 561.0 |
| 392 | 561.0 |
| 393 | 562.0 |
| 394 | 562.0 |
| 395 | 562.0 |
| 396 | 562.0 |
| 397 | 562.0 |
| 398 | 562.0 |
| 399 | 562.0 |
| 400 | 562.0 |
| 401 | 562.0 |
| 402 | 562.0 |
| 403 | 562.0 |
| 404 | 562.0 |
| 405 | 562.0 |
| 406 | 562.0 |
| 407 | 562.0 |
| 408 | 562.0 |
| 409 | 562.0 |
| 410 | 562.0 |
| 411 | 562.0 |
| 412 | 562.0 |
| 413 | 562.0 |
| 414 | 562.0 |
| 415 | 562.0 |
| 416 | 562.0 |
| 417 | 562.0 |
| 418 | 562.0 |
| 419 | 562.0 |
| 420 | 562.0 |
| 421 | 562.0 |
| 422 | 562.0 |
| 423 | 562.0 |
| 424 | 562.0 |
| 425 | 563.0 |
| 426 | 563.0 |
| 427 | 554.0 |
| 428 | 554.0 |
| 429 | 554.0 |
| 430 | 554.0 |
| 431 | 556.0 |
| 432 | 556.0 |
| 433 | 556.0 |
| 434 | 556.0 |
| 435 | 556.0 |
| 436 | 556.0 |
| 437 | 556.0 |
| 438 | 556.0 |
| 439 | 556.0 |
| 440 | 557.0 |
| 441 | 556.0 |
| 442 | 557.0 |
| 443 | 556.0 |
| 444 | 556.0 |
| 445 | 556.0 |
| 446 | 556.0 |
| 447 | 556.0 |
| 448 | 556.0 |
| 449 | 556.0 |
| 450 | 556.0 |
| 451 | 556.0 |
| 452 | 556.0 |
| 453 | 556.0 |
| 454 | 556.0 |
| 455 | 556.0 |
| 456 | 555.0 |
| 457 | 556.0 |
| 458 | 556.0 |
| 459 | 556.0 |
| 460 | 556.0 |
| 461 | 556.0 |
| 462 | 556.0 |
| 463 | 553.0 |
| 464 | 553.0 |
| 465 | 553.0 |
| 466 | 553.0 |
| 467 | 553.0 |
| 468 | 553.0 |
| 469 | 553.0 |
| 470 | 553.0 |
| 471 | 553.0 |
| 472 | 553.0 |
| 473 | 553.0 |
| 474 | 553.0 |
| 475 | 553.0 |
| 476 | 553.0 |
| 477 | 553.0 |
| 478 | 553.0 |
| 479 | 553.0 |
| 480 | 553.0 |
| 481 | 553.0 |
| 482 | 553.0 |
| 483 | 553.0 |
| 484 | 553.0 |
| 485 | 553.0 |
| 486 | 553.0 |
| 487 | 553.0 |
| 488 | 553.0 |
| 489 | 554.0 |
| 490 | 554.0 |
| 491 | 554.0 |
| 492 | 553.0 |
| 493 | 553.0 |
| 494 | 554.0 |
| 495 | 554.0 |
| 496 | 554.0 |
| 497 | 554.0 |
| 498 | 554.0 |
| 499 | 554.0 |
| 500 | 554.0 |
| 501 | 554.0 |
| 502 | 554.0 |
| 503 | 554.0 |
| 504 | 554.0 |
| 505 | 554.0 |
| 506 | 554.0 |
| 507 | 554.0 |
| 508 | 553.0 |
| 509 | 553.0 |
| 510 | 553.0 |
| 511 | 553.0 |
| 512 | 553.0 |
| 513 | 556.0 |
| 514 | 554.0 |
| 515 | 554.0 |
| 516 | 556.0 |
| 517 | 556.0 |
| 518 | 556.0 |
| 519 | 556.0 |
| 520 | 556.0 |
| 521 | 556.0 |
| 522 | 556.0 |
| 523 | 556.0 |
| 524 | 556.0 |
| 525 | 555.0 |
| 526 | 556.0 |
| 527 | 556.0 |
| 528 | 556.0 |
| 529 | 556.0 |
| 530 | 556.0 |
| 531 | 556.0 |
| 532 | 556.0 |
| 533 | 552.0 |
| 534 | 552.0 |
| 535 | 553.0 |
| 536 | 553.0 |
| 537 | 553.0 |
| 538 | 553.0 |
| 539 | 553.0 |
| 540 | 553.0 |
| 541 | 553.0 |
| 542 | 553.0 |
| 543 | 553.0 |
| 544 | 553.0 |
| 545 | 553.0 |
| 546 | 553.0 |
| 547 | 553.0 |
| 548 | 553.0 |
| 549 | 553.0 |
| 550 | 553.0 |
| 551 | 553.0 |
| 552 | 553.0 |
| 553 | 553.0 |
| 554 | 553.0 |
| 555 | 554.0 |
| 556 | 554.0 |
| 557 | 554.0 |
| 558 | 554.0 |
| 559 | 554.0 |
| 560 | 554.0 |
| 561 | 554.0 |
| 562 | 554.0 |
| 563 | 554.0 |
| 564 | 554.0 |
| 565 | 554.0 |
| 566 | 554.0 |
| 567 | 554.0 |
| 568 | 554.0 |
| 569 | 554.0 |
| 570 | 554.0 |
| 571 | 554.0 |
| 572 | 554.0 |
| 573 | 554.0 |
| 574 | 554.0 |
| 575 | 554.0 |
| 576 | 554.0 |
| 577 | 555.0 |
| 578 | 555.0 |
| 579 | 555.0 |
| 580 | 555.0 |
| 581 | 555.0 |
| 582 | 555.0 |
| 583 | 555.0 |
| 584 | 555.0 |
| 585 | 555.0 |
| 586 | 555.0 |
| 587 | 555.0 |
| 588 | 555.0 |
| 589 | 555.0 |
| 590 | 555.0 |
| 591 | 555.0 |
| 592 | 555.0 |
| 593 | 555.0 |
| 594 | 555.0 |
| 595 | 555.0 |
| 596 | 556.0 |
| 597 | 556.0 |
| 598 | 556.0 |
| 599 | 556.0 |
| 600 | 556.0 |
| 601 | 556.0 |
| 602 | 556.0 |
| 603 | 556.0 |
| 604 | 556.0 |
| 605 | 556.0 |
| 606 | 556.0 |
| 607 | 556.0 |
| 608 | 556.0 |
| 609 | 556.0 |
| 610 | 556.0 |
| 611 | 556.0 |
| 612 | 556.0 |
| 613 | 556.0 |
| 614 | 556.0 |
| 615 | 556.0 |
| 616 | 556.0 |
| 617 | 556.0 |
| 618 | 557.0 |
| 619 | 557.0 |
| 620 | 557.0 |
| 621 | 557.0 |
| 622 | 557.0 |
| 623 | 557.0 |
| 624 | 557.0 |
| 625 | 557.0 |
| 626 | 557.0 |
| 627 | 556.0 |
| 628 | 556.0 |
| 629 | 556.0 |
| 630 | 556.0 |
| 631 | 556.0 |
| 632 | 556.0 |
| 633 | 556.0 |
| 634 | 556.0 |
| 635 | 556.0 |
| 636 | 556.0 |
| 637 | 556.0 |
| 638 | 556.0 |
| 639 | 555.0 |
| 640 | 555.0 |
| 641 | 555.0 |
| 642 | 555.0 |
| 643 | 554.0 |
| 644 | 554.0 |
| 645 | 554.0 |
| 646 | 553.0 |
| 647 | 553.0 |
| 648 | 553.0 |
| 649 | 553.0 |
| 650 | 553.0 |
| 651 | 553.0 |
| 652 | 553.0 |
| 653 | 553.0 |
| 654 | 553.0 |
| 655 | 553.0 |
| 656 | 553.0 |
| 657 | 553.0 |
| 658 | 553.0 |
| 659 | 554.0 |
| 660 | 554.0 |
| 661 | 554.0 |
| 662 | 554.0 |
| 663 | 554.0 |
| 664 | 554.0 |
| 665 | 554.0 |
| 666 | 554.0 |
| 667 | 554.0 |
| 668 | 554.0 |
| 669 | 554.0 |
| 670 | 554.0 |
| 671 | 554.0 |
| 672 | 554.0 |
| 673 | 554.0 |
| 674 | 554.0 |
| 675 | 554.0 |
| 676 | 554.0 |
| 677 | 554.0 |
| 678 | 555.0 |
| 679 | 555.0 |
| 680 | 555.0 |
| 681 | 555.0 |
| 682 | 555.0 |
| 683 | 555.0 |
| 684 | 555.0 |
| 685 | 555.0 |
| 686 | 555.0 |
| 687 | 555.0 |
| 688 | 555.0 |
| 689 | 555.0 |
| 690 | 555.0 |
| 691 | 555.0 |
| 692 | 555.0 |
| 693 | 555.0 |
| 694 | 555.0 |
| 695 | 555.0 |
| 696 | 555.0 |
| 697 | 555.0 |
| 698 | 556.0 |
| 699 | 555.0 |
| 700 | 556.0 |
| 701 | 556.0 |
| 702 | 556.0 |
| 703 | 556.0 |
| 704 | 556.0 |
| 705 | 556.0 |
| 706 | 556.0 |
| 707 | 556.0 |
| 708 | 556.0 |
| 709 | 556.0 |
| 710 | 556.0 |
| 711 | 556.0 |
| 712 | 556.0 |
| 713 | 556.0 |
| 714 | 556.0 |
| 715 | 556.0 |
| 716 | 556.0 |
| 717 | 556.0 |
| 718 | 556.0 |
| 719 | 556.0 |
| 720 | 556.0 |
| 721 | 556.0 |
| 722 | 556.0 |
| 723 | 556.0 |
| 724 | 556.0 |
| 725 | 553.0 |
| 726 | 553.0 |
| 727 | 553.0 |
| 728 | 553.0 |
| 729 | 553.0 |
| 730 | 553.0 |
| 731 | 553.0 |
| 732 | 553.0 |
| 733 | 553.0 |
| 734 | 553.0 |
| 735 | 553.0 |
| 736 | 553.0 |
| 737 | 554.0 |
| 738 | 554.0 |
| 739 | 554.0 |
| 740 | 554.0 |
| 741 | 554.0 |
| 742 | 554.0 |
| 743 | 554.0 |
| 744 | 554.0 |
| 745 | 554.0 |
| 746 | 554.0 |
| 747 | 553.0 |
| 748 | 553.0 |
| 749 | 553.0 |
| 750 | 553.0 |
| 751 | 553.0 |
| 752 | 556.0 |
| 753 | 554.0 |
| 754 | 554.0 |
| 755 | 556.0 |
| 756 | 556.0 |
| 757 | 556.0 |
| 758 | 556.0 |
| 759 | 557.0 |
| 760 | 556.0 |
| 761 | 556.0 |
| 762 | 556.0 |
| 763 | 556.0 |
| 764 | 556.0 |
| 765 | 556.0 |
| 766 | 556.0 |
| 767 | 556.0 |
| 768 | 556.0 |
| 769 | 556.0 |
| 770 | 556.0 |
| 771 | 556.0 |
| 772 | 556.0 |
| 773 | 556.0 |
| 774 | 556.0 |
| 775 | 556.0 |
| 776 | 555.0 |
| 777 | 556.0 |
| 778 | 556.0 |
| 779 | 556.0 |
| 780 | 556.0 |
| 781 | 556.0 |
| 782 | 556.0 |
| 783 | 556.0 |
| 784 | 556.0 |
| 785 | 556.0 |
| 786 | 556.0 |
| 787 | 556.0 |
| 788 | 556.0 |
| 789 | 556.0 |
| 790 | 556.0 |
| 791 | 555.0 |
| 792 | 555.0 |
| 793 | 555.0 |
| 794 | 555.0 |
| 795 | 555.0 |
| 796 | 555.0 |
| 797 | 555.0 |
| 798 | 555.0 |
| 799 | 554.0 |
| 800 | 554.0 |
| 801 | 554.0 |
| 802 | 555.0 |
| 803 | 555.0 |
| 804 | 555.0 |
| 805 | 554.0 |
| 806 | 555.0 |
| 807 | 555.0 |
| 808 | 555.0 |
| 809 | 555.0 |
| 810 | 555.0 |
| 811 | 555.0 |
| 812 | 554.0 |
| 813 | 554.0 |
| 814 | 554.0 |
| 815 | 554.0 |
| 816 | 554.0 |
| 817 | 553.0 |
| 818 | 554.0 |
| 819 | 554.0 |
| 820 | 554.0 |
| 821 | 555.0 |
| 822 | 555.0 |
| 823 | 556.0 |
| 824 | 555.0 |
| 825 | 553.0 |
| 826 | 553.0 |
| 827 | 553.0 |
| 828 | 554.0 |
| 829 | 554.0 |
| 830 | 553.0 |
| 831 | 554.0 |
| 832 | 554.0 |
| 833 | 554.0 |
| 834 | 554.0 |
| 835 | 554.0 |
| 836 | 554.0 |
| 837 | 554.0 |
| 838 | 554.0 |
| 839 | 554.0 |
| 840 | 553.0 |
| 841 | 554.0 |
| 842 | 554.0 |
| 843 | 554.0 |
| 844 | 554.0 |
| 845 | 554.0 |
| 846 | 555.0 |
| 847 | 556.0 |
| 848 | 556.0 |
| 849 | 556.0 |
| 850 | 556.0 |
| 851 | 556.0 |
| 852 | 556.0 |
| 853 | 554.0 |
| 854 | 555.0 |
| 855 | 555.0 |
| 856 | 555.0 |
| 857 | 555.0 |
| 858 | 555.0 |
| 859 | 556.0 |
| 860 | 555.0 |
| 861 | 554.0 |
| 862 | 554.0 |
| 863 | 554.0 |
| 864 | 554.0 |
| 865 | 554.0 |
| 866 | 554.0 |
| 867 | 554.0 |
| 868 | 555.0 |
| 869 | 555.0 |
| 870 | 555.0 |
| 871 | 555.0 |
| 872 | 554.0 |
| 873 | 554.0 |
| 874 | 554.0 |
| 875 | 554.0 |
| 876 | 554.0 |
| 877 | 554.0 |
| 878 | 555.0 |
| 879 | 554.0 |
| 880 | 555.0 |
| 881 | 555.0 |
| 882 | 555.0 |
| 883 | 555.0 |
| 884 | 555.0 |
| 885 | 555.0 |
| 886 | 555.0 |
| 887 | 554.0 |
| 888 | 554.0 |
| 889 | 554.0 |
| 890 | 554.0 |
| 891 | 554.0 |
| 892 | 554.0 |
| 893 | 554.0 |
| 894 | 554.0 |
| 895 | 554.0 |
| 896 | 554.0 |
| 897 | 554.0 |
| 898 | 555.0 |
| 899 | 555.0 |
| 900 | 554.0 |
| 901 | 553.0 |
| 902 | 553.0 |
| 903 | 546.0 |
| 904 | 545.0 |
| 905 | 545.0 |
| 906 | 545.0 |
| 907 | 545.0 |
| 908 | 545.0 |
| 909 | 545.0 |
| 910 | 545.0 |
| 911 | 545.0 |
| 912 | 545.0 |
| 913 | 545.0 |
| 914 | 545.0 |
| 915 | 545.0 |
| 916 | 545.0 |
| 917 | 545.0 |
| 918 | 545.0 |
| 919 | 545.0 |
| 920 | 545.0 |
| 921 | 545.0 |
| 922 | 545.0 |
| 923 | 545.0 |
| 924 | 545.0 |
| 925 | 545.0 |
| 926 | 545.0 |
| 927 | 545.0 |
| 928 | 544.0 |
| 929 | 544.0 |
| 930 | 544.0 |
| 931 | 544.0 |
| 932 | 544.0 |
| 933 | 544.0 |
| 934 | 544.0 |
| 935 | 544.0 |
| 936 | 544.0 |
| 937 | 544.0 |
| 938 | 544.0 |
| 939 | 544.0 |
| 940 | 544.0 |
| 941 | 544.0 |
| 942 | 544.0 |
| 943 | 544.0 |
| 944 | 544.0 |
| 945 | 544.0 |
| 946 | 543.0 |
| 947 | 543.0 |
| 948 | 543.0 |
| 949 | 543.0 |
| 950 | 543.0 |
| 951 | 543.0 |
| 952 | 543.0 |
| 953 | 543.0 |
| 954 | 543.0 |
| 955 | 543.0 |
| 956 | 543.0 |
| 957 | 543.0 |
| 958 | 543.0 |
| 959 | 545.0 |
| 960 | 545.0 |
| 961 | 545.0 |
| 962 | 545.0 |
| 963 | 545.0 |
| 964 | 545.0 |
| 965 | 545.0 |
| 966 | 545.0 |
| 967 | 545.0 |
| 968 | 544.0 |
| 969 | 544.0 |
| 970 | 544.0 |
| 971 | 544.0 |
| 972 | 544.0 |
| 973 | 544.0 |
| 974 | 544.0 |
| 975 | 544.0 |
| 976 | 544.0 |
| 977 | 544.0 |
| 978 | 544.0 |
| 979 | 544.0 |
| 980 | 544.0 |
| 981 | 544.0 |
| 982 | 543.0 |
| 983 | 543.0 |
| 984 | 543.0 |
| 985 | 543.0 |
| 986 | 543.0 |
| 987 | 543.0 |
| 988 | 543.0 |
| 989 | 543.0 |
| 990 | 543.0 |
| 991 | 543.0 |
| 992 | 545.0 |
| 993 | 545.0 |
| 994 | 545.0 |
| 995 | 544.0 |
| 996 | 544.0 |
| 997 | 544.0 |
| 998 | 544.0 |
| 999 | 543.0 |
| 1000 | 544.0 |
| 1001 | 544.0 |
| 1002 | 545.0 |
| 1003 | 544.0 |
| 1004 | 544.0 |
| 1005 | 544.0 |
| 1006 | 544.0 |
| 1007 | 544.0 |
| 1008 | 544.0 |
| 1009 | 544.0 |
| 1010 | 544.0 |
| 1011 | 544.0 |
| 1012 | 544.0 |
| 1013 | 544.0 |
| 1014 | 543.0 |
| 1015 | 543.0 |
| 1016 | 543.0 |
| 1017 | 543.0 |
| 1018 | 543.0 |
| 1019 | 543.0 |
| 1020 | 543.0 |
| 1021 | 543.0 |
| 1022 | 544.0 |
| 1023 | 544.0 |
| 1024 | 544.0 |
| 1025 | 544.0 |
| 1026 | 544.0 |
| 1027 | 544.0 |
| 1028 | 544.0 |
| 1029 | 544.0 |
| 1030 | 544.0 |
| 1031 | 544.0 |
| 1032 | 544.0 |
| 1033 | 544.0 |
| 1034 | 544.0 |
| 1035 | 545.0 |
| 1036 | 545.0 |
| 1037 | 545.0 |
| 1038 | 545.0 |
| 1039 | 545.0 |
| 1040 | 545.0 |
| 1041 | 545.0 |
| 1042 | 545.0 |
| 1043 | 545.0 |
| 1044 | 545.0 |
| 1045 | 545.0 |
| 1046 | 545.0 |
| 1047 | 545.0 |
| 1048 | 545.0 |
| 1049 | 545.0 |
| 1050 | 544.0 |
| 1051 | 544.0 |
| 1052 | 544.0 |
| 1053 | 544.0 |
| 1054 | 544.0 |
| 1055 | 544.0 |
| 1056 | 544.0 |
| 1057 | 544.0 |
| 1058 | 544.0 |
| 1059 | 543.0 |
| 1060 | 543.0 |
| 1061 | 543.0 |
| 1062 | 543.0 |
| 1063 | 543.0 |
| 1064 | 543.0 |
| 1065 | 543.0 |
| 1066 | 543.0 |
| 1067 | 543.0 |
| 1068 | 543.0 |
| 1069 | 543.0 |
| 1070 | 545.0 |
| 1071 | 545.0 |
| 1072 | 544.0 |
| 1073 | 546.0 |
| 1074 | 546.0 |
| 1075 | 546.0 |
| 1076 | 546.0 |
| 1077 | 546.0 |
| 1078 | 546.0 |
| 1079 | 546.0 |
| 1080 | 546.0 |
| 1081 | 546.0 |
| 1082 | 547.0 |
| 1083 | 547.0 |
| 1084 | 547.0 |
| 1085 | 547.0 |
| 1086 | 547.0 |
| 1087 | 547.0 |
| 1088 | 547.0 |
| 1089 | 547.0 |
| 1090 | 547.0 |
| 1091 | 547.0 |
| 1092 | 548.0 |
| 1093 | 548.0 |
| 1094 | 548.0 |
| 1095 | 548.0 |
| 1096 | 548.0 |
| 1097 | 548.0 |
| 1098 | 548.0 |
| 1099 | 548.0 |
| 1100 | 549.0 |
| 1101 | 549.0 |
| 1102 | 549.0 |
| 1103 | 549.0 |
| 1104 | 549.0 |
| 1105 | 549.0 |
| 1106 | 549.0 |
| 1107 | 549.0 |
| 1108 | 549.0 |
| 1109 | 550.0 |
| 1110 | 550.0 |
| 1111 | 550.0 |
| 1112 | 550.0 |
| 1113 | 550.0 |
| 1114 | 550.0 |
| 1115 | 551.0 |
| 1116 | 551.0 |
| 1117 | 551.0 |
| 1118 | 551.0 |
| 1119 | 551.0 |
| 1120 | 551.0 |
| 1121 | 551.0 |
| 1122 | 552.0 |
| 1123 | 552.0 |
| 1124 | 552.0 |
| 1125 | 552.0 |
| 1126 | 552.0 |
| 1127 | 552.0 |
| 1128 | 552.0 |
| 1129 | 553.0 |
| 1130 | 553.0 |
| 1131 | 553.0 |
| 1132 | 553.0 |
| 1133 | 553.0 |
| 1134 | 553.0 |
| 1135 | 554.0 |
| 1136 | 554.0 |
| 1137 | 554.0 |
| 1138 | 554.0 |
| 1139 | 554.0 |
| 1140 | 558.0 |
| 1141 | 558.0 |
| 1142 | 558.0 |
| 1143 | 558.0 |
| 1144 | 558.0 |
| 1145 | 558.0 |
| 1146 | 558.0 |
| 1147 | 559.0 |
| 1148 | 559.0 |
| 1149 | 559.0 |
| 1150 | 559.0 |
| 1151 | 559.0 |
| 1152 | 559.0 |
| 1153 | 559.0 |
| 1154 | 559.0 |
| 1155 | 559.0 |
| 1156 | 559.0 |
| 1157 | 560.0 |
| 1158 | 560.0 |
| 1159 | 560.0 |
| 1160 | 560.0 |
| 1161 | 560.0 |
| 1162 | 561.0 |
| 1163 | 561.0 |
| 1164 | 561.0 |
| 1165 | 561.0 |
| 1166 | 561.0 |
| 1167 | 562.0 |
| 1168 | 562.0 |
| 1169 | 562.0 |
| 1170 | 562.0 |
| 1171 | 562.0 |
| 1172 | 563.0 |
| 1173 | 563.0 |
| 1174 | 563.0 |
| 1175 | 563.0 |
| 1176 | 563.0 |
| 1177 | 563.0 |
| 1178 | 564.0 |
| 1179 | 564.0 |
| 1180 | 564.0 |
| 1181 | 564.0 |
| 1182 | 564.0 |
| 1183 | 564.0 |
| 1184 | 544.0 |
| 1185 | 545.0 |
| 1186 | 545.0 |
| 1187 | 545.0 |
| 1188 | 543.0 |
| 1189 | 545.0 |
| 1190 | 545.0 |
| 1191 | 545.0 |
| 1192 | 545.0 |
| 1193 | 544.0 |
| 1194 | 544.0 |
| 1195 | 543.0 |
| 1196 | 543.0 |
| 1197 | 543.0 |
| 1198 | 545.0 |
| 1199 | 545.0 |
| 1200 | 545.0 |
| 1201 | 545.0 |
| 1202 | 545.0 |
| 1203 | 545.0 |
| 1204 | 545.0 |
| 1205 | 545.0 |
| 1206 | 545.0 |
| 1207 | 544.0 |
| 1208 | 544.0 |
| 1209 | 544.0 |
| 1210 | 544.0 |
| 1211 | 544.0 |
| 1212 | 543.0 |
| 1213 | 543.0 |
| 1214 | 544.0 |
| 1215 | 544.0 |
| 1216 | 545.0 |
| 1217 | 545.0 |
| 1218 | 545.0 |
| 1219 | 545.0 |
| 1220 | 545.0 |
| 1221 | 545.0 |
| 1222 | 545.0 |
| 1223 | 544.0 |
| 1224 | 544.0 |
| 1225 | 544.0 |
| 1226 | 544.0 |
| 1227 | 544.0 |
| 1228 | 544.0 |
| 1229 | 544.0 |
| 1230 | 544.0 |
| 1231 | 544.0 |
| 1232 | 544.0 |
| 1233 | 543.0 |
| 1234 | 543.0 |
| 1235 | 543.0 |
| 1236 | 543.0 |
| 1237 | 544.0 |
| 1238 | 544.0 |
| 1239 | 544.0 |
| 1240 | 543.0 |
| 1241 | 549.0 |
| 1242 | 549.0 |
| 1243 | 549.0 |
| 1244 | 550.0 |
| 1245 | 550.0 |
| 1246 | 551.0 |
| 1247 | 551.0 |
| 1248 | 551.0 |
| 1249 | 552.0 |
| 1250 | 552.0 |
| 1251 | 552.0 |
| 1252 | 552.0 |
| 1253 | 552.0 559.0 C15 E 5.0 175.0 03.03.2023 559.0 C9 E 5.0 175.0 03.03.2023 559.0 C21 E 5.0 175.0 03.03.2023 559.0 C1 E 5.0 175.0 03.03.2023 558.0 C14 E 5.0 175.0 03.03.2023 558.0 C7 E 5.0 175.0 03.03.2023 558.0 C1 E 5.0 175.0 03.03.2023 557.0 C1 E 5.0 175.0 03.03.2023 557.0 C7 E 5.0 175.0 03.03.2023 557.0 C14 E 5.0 175.0 03.03.2023 545.0 C1 E 5.0 175.0 03.03.2023 546.0 C10 E 5.0 175.0 03.03.2023 546.0 C13 E 5.0 175.0 03.03.2023 546.0 C17 E 5.0 175.0 03.03.2023 547.0 C3 E 5.0 175.0 03.03.2023 547.0 C4 E 5.0 175.0 03.03.2023 547.0 C10 E 5.0 175.0 03.03.2023 547.0 C16 E 5.0 175.0 03.03.2023 548.0 C5 E 5.0 175.0 03.03.2023 548.0 C7 E 5.0 175.0 03.03.2023 549.0 C3 E 5.0 175.0 03.03.2023 545.0 2AT T-150 E 26.0 2.0 287.0 19.03.2023 544.0 4AT T-150 E 26.0 2.0 287.0 19.03.2023 554.0 C19AT T-150 E 26.0 2.0 287.0 19.03.2023 555.0 8AT T-150 E 26.0 2.0 287.0 19.03.2023 555.0 28AT T-150 E 26.0 2.0 287.0 19.03.2023 Grand Total 547.0 75.0 153.0 0.0 572.0 1.0 0.0 0.0 1087.0 5.0 3.0 0.0 130.0 10.0 0.0 0.0 |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail