| 1 | Schedule-A |
| 2 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for foundation, shafts, man holes,for under ground cable / erection of poles, stays, locating fault of LT cable and stay assembly etc not exceeding 10 square metre on plan and getting out in any type of soil including dressing/trimming of sides and leveling, grading and ramming of bottom of excavation complete all as specified and as directed. |
| 3 | All as per Ser item No 1.00 here in before but depth exceeding 1.5 metre and not exceeding 3.0 metre. |
| 4 | Returning, filling in, in soil, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each layer complete all as specified and directed. |
| 5 | Removing excavated material/soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed. |
| 6 | Material and labour sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified and as directed. |
| 7 | Supply and lay bricks, common burnt clay, sub class \\"B', old size, laid in vertical direction to cable as cable protection complete all as specified and as directed. |
| 8 | All as per Ser Item No 6.00 here in before but except bricks, all as specified and directed.Note:- Old bricks retrieved from Ser Item No 11 to 13 here in after shall be re-used. |
| 9 | Material & labour for cement concrete in foundations, filling and mass concrete PCC as foundation to poles, type D2, 1:4:8 using 40 mm graded stone agregate as foundations to poles all as specified. |
| 10 | Material & labour for Cement concrete, filling and mass concrete, PCC type C2, 1:3:6 using 20 mm graded aggregate all as specified. |
| 11 | Material & labour for cement concrete as coping to poles, PCC type B1, 1:2:4 using 20 mm graded stone agregate as foundations to poles all as specified. |
| 12 | Laying and connecting only in trenches for for replacement XLPE insulated, armoured heavy duty electric cables with aluminium conductor, 1100 volts grade, of different sizes (Cable will be supplied by department under Schedule 'B'. Excavation, cable cover, sand cushioning, returning filling and removal will be paid separately) |
| 13 | Disconnecting & taking out defective underground cable from trenches, pole, pipe, floor, wall etc and locate the fault, rectify the defect and relaying the XLPE cable underground PVC insulated and overall sheathed aluminum conductor heavy duty 1100 volts including connecting and testing for any size complete as directed (Excavation/earth work & sand cushioning, bricks and joint shall be measured & paid for separately). |
| 14 | Disconnecting & taking out defective underground cable any size and any type from trenches, pole, pipe, floor, wall etc. Please Enable Macros to View BoQ information |
| 15 | Disconnecting & taking out defective underground cable any size and any type from trenches, pole, pipe, floor, wall etc. Please Enable Macros to View BoQ information |