|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge, 1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction ofEngineer-in-charge. |
| 3 | Silt clearance (Wet) from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively). |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm |
| 5 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge. |
| 6 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide bank etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil |
| 7 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil |
| 8 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: Allkinds of soil : |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 10 | Providing and laying in position cement concrete 1 cement:5 fine sand:10 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. |
| 11 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 12 | Providing and laying in position cement concrete 1 cement: 3 fine sand: 6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. |
| 13 | Providing and laying in position cement concrete 1 cement: 2 fine sand:4 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. |
| 14 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 15 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 16 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 17 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . |
| 18 | Laying old cement concrete interlocking paver blocks of any design / shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand , filling the joints with fine sand etc. all complete as per the direction of Engineer - in - charge. |
| 19 | Providing and laying 60mm thick factory made cement concreteinterlocking paver block of M-30 grade made by block making machinewith strong vibratory compaction and of approved size and design/shapelaid in required colour and pattern over and including 50mm thickcompacted bed of fine sand, filling the joints with coarse sand etc. allcomplete as per direction of Engineer-in-charge. |
| 20 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratorymethod using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern. |
| 21 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates andsimilar works. |
| 22 | Centring and shuttering, including strutting, propping etc and removal of the formwork . |
| 23 | Foundations, footings, bases of columns etc. |
| 24 | Suspended floors, roofs, landings, balconies and access platforms. |
| 25 | edges of slab |
| 26 | Edges of slabs and breaks in floors and walls Above 20 cm wide |
| 27 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. |
| 28 | Providing & Laying WBM Grade - II with specified stone agg. & binding material including Screaning, sorting. spreading to template & consolidation with power road roller of minimum 8 ton capacity. Base course with 63mm to 45mm size including stone screaning 13.20mm size . |
| 29 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge (incl. all leads, lifts and carriage complete) |
| 30 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications On W.B.M. @ 0.75 Kg/sqm. |
| 31 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity |
| 32 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On bitumen surface @ 0.50 Kg/sqm. |
| 33 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binderand filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, leveland alignment and rolling with smooth wheeled, vibratory and tandemrollers to achieve the desired compaction and density as per specification,complete and as per directions of Engineer-in-Charge.25 mm compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. |
| 34 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/ spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe |
| 35 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/ spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 450 mm dia. R.C.C. pipe |
| 36 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/ spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 900 mm dia. R.C.C. pipe |
| 37 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. 300 mm dia. R.C.C. pipe |
| 38 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 39 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level |
| 40 | 12 mm Plaster 1:6 ( 1 cement : 6 fine sand) |
| 41 | Providing and fixing granite stone of size 2'-6\\" x 2'-0\\" including engraving of letters and painting in the engraved letters, complete job. |
| 42 | Carriage of material by MT for an Avg. lead of 35 Kms |
| 43 | Stone agg. Above 40mm nominal size with in avg. lead 35 km by M.T. |
| 44 | Sand/Stone Agg. by MT for an Avg. lead of 35 Kms |
| 45 | Stone agg. Above 40mm nominal size with in avg. lead 25 km by M.T. |
| 46 | Stone agg. below 40mm nominal size with in avg. lead 25 km by M.T. |
| 47 | Carriage of earth for an avg. lead of 10 Kms. |
| 48 | Carriage of earth for an avg. lead of 05 Kms. |
| 49 | Disposal of mulba/ unserviceable material/ sludge for an average lead of 5 km. Please Enable Macros to View BoQ information |