| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle |
| 2 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002. Manual Means |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km. |
| 5 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 6 | Dressing of berms including digging of earth upto 10 cm depth. |
| 7 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 8 | Supply of Caution Diversion sign board size 1800 x 600 mm having centre height of 75 cm made out or 1.25 mm thick M.S. sheet duly framed with angle iron size 40 x 40 x 5 mm fixed on two moving wheels and stands, made out of 75 x 40 mm channel having two solid rubber wheels mounted on ball bearings, boards is processed in stoving enamel blue and machine cut sheet reflective letter and arrow on one side and the other side having arrow only complete in all respect. |
| 9 | Supply & Fixing of flood gauge (water Gauge) as per I.R.C. 67 standard 200 cm long fixed on angle iron posts 50x50x6 mm, 2.6 M. long. |
| 10 | Supply of Hazard Marker made out of 2 mm thick M.S. sheet size 300x300x3 mm framed with angle iron 25x25x3 mm and fixed on channel posts 75x40x6 mm and hold fast at bottom whole body is painted in white stoving enamel and 6 Nos., 5 cm dia reflective sheet on white reflective background with additional border of 1.25 cm all arount it. |
| 11 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row 600 mm dia |
| 12 | Stone masonry in cement mortar 1:3 for parapet complete as per drawing and MoRTH specifications Clauses 1400 including Weepholes as per MoRTH specifications Clauses 2706.Random rubble masonry. |
| 13 | Plastering with cement mortar (1:4), 20 mm thick on Stone work. |
| 14 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per MoRTH specifications Clause 800 |
| 15 | Construction of speed breaker of IRC standard having width of 3.70 M including cost of stone aggregate (50-25mm) size hire charges for roller for consolidation and compaction and other machines required for the work (including cost of bitumen). Please Enable Macros to View BoQ information |