|
| 1 | Dismantling manually/ mechanical means and incluiding stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. Bituminous road |
| 2 | Demolishing R.C.C work manually/ by mechanical means incluiding stacking of steel bars and disposal of unserviceable materials within 50 metre lead as per direction of Engineer - in-charge. |
| 3 | Taking out existing CC interlocking paver blocks from footpath/ central verge, incluiding removal of rubbish etc, disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-charge. |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m,and lift upto 1.5m, as directed by Engineer-in-charge. : All kinds of soil. (C.R.) The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in- Charge(CR). |
| 5 | Disposal of building rubbish / malba / similar unserviceable , dismantled or waste materials by mechanical means incluiding loading transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge. Beyound 50 m initial lead, for all leads incluiding all lifts involved. |
| 6 | Filling available excavated earth (excluiding rock) in trenches, plinth , sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering , lead up to 50m and lift upto 1.5m |
| 7 | Earth work embankment in ordinary soil embankmentto be in 20cm Layers including ramming, dressing, the surface to required levels with ½ tonne steel or wooden rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 to 10 tonnes capacity and including 1.5 m lift and all lead. Earth shall be brought from a place which including cartage of earth by mechanical transport and T& P , Labour etc. required for proper completion. Earth shall be Arranged by the contractor at his own cost |
| 8 | Construction of sub-grade and earthen shoulder with approved obtained from right of way all lifts & leads , transporting to site ,spreading ,grading to required slope and compacted to meet requirement of table no. 300-2 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -all work upto plinth level 1:4:8 (1cement :4 course sand (zone III ):8 graded stone aggregate 40mm nominal size ). |
| 10 | By Mix in Place Method Well graded Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 Sr No 4.1 |
| 11 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 12 | Prime Coat over WBm/WMM, Providing and applying Primewith SS1 grade bitumen emulsion using emulsion pressure distributor at the rate of 0.70 to 1.00 kg per sqm using mechanical means. |
| 13 | (Dense Graded Bituminous Macadam Grading 2 )Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per complete in all respects. |
| 14 | Providing and applying tack coat using hot straight run bitumen of grade VG-10 incluiding heating the bitumen, sraying the bitumen with mechanically operated spray uint fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On bituminous surface @ 0.50 kg/sqm. |
| 15 | Bituminous Concrete Grading 2 Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per complete in all respects |
| 16 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface.Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. |
| 17 | Centering and shuttering including strutting, propping etc. and removal of form for :Wall any thickness including attached pilasters, buttresses, plinth and string course etc. |
| 18 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete |
| 19 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 20 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impaining strength and durability as per direction of the Engineer-in-charge. (Note Cement content considered in this item is @ 330kg/cum.Excess/less cement used as per design mix is payable/recoverable separately). All works up to plinth level. |
| 21 | Extra for providing richer mixes at all floor levels. Noe :- Excess/less cement over the specified content used is payable/recoverable separately . Providing M-30 grade concrete inseed of M-25 grade BMC/RMC. ( Note:- Cement content considered in M-30 is @340 kg/cum). |
| 22 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), Including maklng joints with or w1thout grooves (thickness of Jolnts except at sharp curve shall not to more than Smm), Including making drainage opening wherever required complete etc. as per direction of Engineer-In-charge (length of finished kerb edglng shall be measured for payment). (Precast C.C. kerb stone shall be approved Uy Engineer-In-charge). |
| 23 | Providing wall putty on new surface with approved quality material of Berger/JK/Birla of similar make 2 coats |
| 24 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 25 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. incluiding cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, incluiding welding and bolted with special shaped washers Electric resistance or induction bult welded tubes etc complete. |
| 26 | Steel work welded in built up sections/ framed work, incluiding cutting ,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. Please Enable Macros to View BoQ information |