| 1 | Site clearence |
| 2 | Including of 5HP pump for dewatering includingarrangment of pump suction and delivery pipes and otheraccessories at site i/c of pol.As per S. NO 22. |
| 3 | Excavation in foundation in ordinary soil(loom clay orsand) including lift upto 1.50meter and lead upto 30 meterand including filling, watering and ramming of excavatedearth into the trenches or into the space between thebuilding and sides of foundation trenches or into the plinthand removal and disposal of surface earth as directed bythe E/I upto a distance of 30meter from the foundationtrenches.SOR NO 251 |
| 4 | Cement concrete with 4 cm gauge approved stone ballast,approved coarse asnd and cement in proportion 8:4:1 inincluding supply of material labour , T&P etc as reqired forproper completion of the work ,as the pre SI NO-281 |
| 5 | R.C.C work in 1:1.5:3 for footing of column foundationsub structure complete as per drawing and technicalspecification with cement with aproved coarse sand and 2.cm aproved stone grit propation of 1:11/2:3 in cover SI NO |
| 6 | Supplying ,fitting and placing HYSD bar reinforcement insub-structure complete as per drawing and TechnicalSpecification as per SOR NO -504 |
| 7 | M-150 Sub Class(A) brick work in 1:4 cement cement andsand of 1.25 finess modulus in Ramp, Bitumen Tank andother structure i/c supply of all material, labour T&Prequired for proper completion of work as per Si. No. 305 |
| 8 | 12mm thick plaster work with cement mortar in proportionof 1:3 cement and sand of 1.25 FM over brick workminimum thickness not less then 10mm including supplyof all materials labour curing and T&P etc.required forproper completion of the work as per SI NO -582 |
| 9 | Fabrication and supply & fixing of mild steel grill as perdesign including the stair case railings etc. with square andround bars, M.S. angle iron. T-iron, M.S. charge supply ofall steel and its wastage, cutting & drilling holes andwelding where necessary including each joints to beperfectly welded and joined including supply of allmaterials, Nuts, Bolts, labour, tool & plants etc. and alsoincluding special machinery such as drilling of weldinggrinding plants etc. as required for the proper completionof the work and supplying a coat of red lead (As per SORNO -NS4 |
| 10 | Providing and laying 25mm thick damp proof coarse withcement concrete 1:2:4 including supply of all materiallabour ,T&P etc required for proper complition of work asper PWD SOR Basti item no 361. |
| 11 | S/F solar light including all material t&p complete etc |
| 12 | P/F hume pipe 600mm dia pipe including all materialCHAPTER 1 MATERIALS (S.NO 23) |
| 13 | Providing and laying vertified floor tiles Kajariya Kerrobrand or equivalent brand of super quality in different size(thickness specified by manufacturer )with waterabsorption less then 0.8% and confirming in etc. SOR NOCPWD 11:41:1 |
| 14 | S&F signboard |
| 15 | Earth work in cutting or in embankment in ordinary soilexcavetion to be in the from of regular pits not exceeding1/2 moter (20\\")in depth and earth work in embankment tobe in 20 cm (8\\") layers, Including ramming and deessingthe surface to required levels and slopes and also including1.5m (5\\") lift and 30m (100\\") lead. The earth cutting to beused in making enbankment or to be deposited as spoilbanks within 30m (100\\") distance in directed by the E/Lasper SOR NO.253 + Cartage upto 8 km |
| 16 | Providing and laying stone bolder pitching in slopesincluding cost of labour t&p etc . Required propercompletion of the work .Ref to Morth specs.2504 |
| 17 | Construction of granular sub-base by providing wellgraded material, spreading in uniform layers with motorgrader/ tractor mounted appropriate equipment on preparedsurface, mixing by mix in place method with rotavator atOMC, and compacting with smooth MORD Specific -ations 401 |
| 18 | LAYING C.C. Road slab consisting of 1:1.5:3 cementcoarse sand & approved 20mm, gauge stone blallst, overprepared sub grade after its reclifications to proper camber& including supply of all materials. As per sor number773B |
| 19 | S/f of Reinforcement cement concrete chair. As per marketrate. |
| 20 | S/F of Plantation. |
| 21 | Add for G.S.T. @ 18% Please Enable Macros to View BoQ information |