| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned,upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness asper Technical Specifications Clause 201 for Rural Roads of MORD.By Manual Means (Note;10000sq.m=1Hectare.)In area of non-thorny jungle |
| 2 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initiallead of 50m and initial lift of 1.5m(Mode of measurement: pre works and post works)In ordinary soil |
| 3 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm. |
| 4 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.(b) River bazree. |
| 5 | Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site |
| 6 | (II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor .(a) 1:3:6 proportion. |
| 7 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). |
| 8 | Construction of Sub Base using Local Materials:Construction of Sub Base using Local Materials,spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges completeas per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). |
| 9 | Water Bound Macadam Base Course, Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with vibratory roller 8-10 tonnesin stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate,watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting orfilling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404of Specifications for Road & Bridge Works of MoRT&H(5th Revision). |