|
| 1 | Preventive maintenance and check up of Dehumidifier Installed at FATS Garuda,capacity of 4850/5000 CFM including complete accessories and controlls .The entire system to be checked and servicing by OEM or authorised service agency throughout CA duration and incase of any breakdown occurs at any time. The tenderer shall be attend the complaint and made serviceable with in 48hrs time including minor spares such as fuses,wires,nut,bolts,etc. for above mentioned complete all as specified and directedbut dehumidifier make bry- Air Model No FLI 7300, Ser No. 2018-BAC-28982 complete all as specified and directed.Note :- Major spare parts are measured and paid seperately under relevant items of this schdule. |
| 2 | Supply and fix in replacement of react filter air inlet pre-filter (make recommended by OEM) complete all as specified and directed |
| 3 | Supply and fix in replacement of SSR (Solid state relay),working capacity 90-250V AC, (make recommended by OEM) complete all as specified and directed . |
| 4 | Supply and fix in replacement of thermostat 50-300 DEC ( make recommended by OEM) complete all as specified and directed . |
| 5 | Supply and fix in replacement of of limit switch (make recommended by OEM) complete all as specified and directed . |
| 6 | Supply and fix in replacement of process filter air inlet pre filter ( make recommended by OEM)complete complete all as specified and directed . |
| 7 | Supply and fix in replacement of pressure switch ( make recommended by OEM) complete all as specified and directed . |
| 8 | Supply and fix in replacement of timer select 800M (make recommended by OEM) complete all as specified and directed . |
| 9 | Supply and fix in replacement of locking device sensor ( make recommended by OEM) complete all as specified and directed . |
| 10 | Supply and fix in replacement of suitable panel door handle( make recommended by OEM) complete all as specified and directed . |
| 11 | Supply and fix in replacement of suitable air volume control damper at common suction entry for dehumidifiers at FATS all as specified and as directed. |
| 12 | Supply and fix in replacement of heater 9.5 kw ( make recommended by OEM) complete all as specified and directed . |
| 13 | Supply and fix in replacement of bed delay timer ( make recommended by OEM) complete all as specified and directed . |
| 14 | Supply and fix in replacement of bed spring socket ( make recommended by OEM) complete all as specified and directed . |
| 15 | Supply and fix in replacement of bed react heater wire (make recommended by OEM) complete all as specified and directed . |
| 16 | Supply and fix in replacement of vaccum seal suitable for existing dehumidifier (make recommended by OEM) ,model No. FLI 7300,Part No 43115,testing, complete all as specified and directed . |
| 17 | Material and labour for preventive monthly maintenance and routine check up for the outdoor VRF unit including 2nos inverter compressor of capacity 12HP to18 HP, installed at 06 nos at Diving school, 02 nos at CRL, 02 nos at ASR Complex and cleaning with Air blower of condensing coil,outdoor fan motors , replace the communication cables and sensor if found defective, including labour charges for repair and replacememnt of spare parts complete all as specified and directed.Note;-(i) Preventive maintenance each Nos of outdoor VRF unit with 2 nos inverter compressor respective of location shall be meassured as one unit. (ii)Contractor shall be responsible for replacement of false ceiling, if damage occured while servicing of ceiling suspended units. |
| 18 | Material and labour for preventive monthly maintenance and routine check up for the indoor VRF casette unit of capacity 4TR Ceiling Suspended units, 04 nos at diving school, 04 nos at ASR complex and 5TR capacity ceiling suspended units of 06 Nos at CRL and cleaning with mild air blower in the coil side and remove the inside fine filter, cleaned with soap solution after cleaning process fix in proper place ,check the drianage water tank and cleaned ,replace the communication cables and sensor if found defective all including labour charges for repair and replacememnt of spare parts complete all as specified and directed.Note;-(i) Preventive maintenance each Nos of indoor VRF casette unit respective of locations shall be meassured as one unit. (ii)Contractor shall be responsible for replacement of false ceiling, if damage occured while servicing of ceiling suspended units. |
| 19 | Material and labour for preventive monthly maintenance and routine check up for the indoor VRF AHUs of capacity 8 TR ceiling suspended units installed at diving school 08 nos and cleaning with mild Air blower in the coil side and remove the inside fine filter, cleaned with Soap solution after cleaning process fix in proper place ,check the drianage water tank and cleaned ,replace the communication cables and sensor if found defective including labour charges for repair and replacememnt of spare parts complete all as specified and directed.Note;-(i) Preventive maintenance each Nos of indoor VRF AHUs of capacity 8 TR ceiling suspended units shall be meassured as one unit. (ii)Contractor shall be responsible for replacement of false ceiling, if damage occured while servicing of ceiling suspended units. |
| 20 | Material and labour for preventive monthly maintenance and routine check up for the outdoor VRF unit with inverter compressor of capacity 10HP to16 HP of 09 nos(16 HP -4nos, 14HP -4nos,and 10HP-1no) installed at Dhruv and cleaning with Air blower of condensing coil,outdoor fan motors , replace the communication cables and sensor if found defective, including labour charges for repair and replacememnt of spare parts complete all as specified and directed. Note;-(i) Preventive maintenance each Nos of outdoor VRF unit with inverter compressor shall be measured as one unit. |
| 21 | Material and labour for preventive monthly maintenance and routine check up for the indoor VRF casette unit of capacity 4TR Ceiling Suspended units, 26 nos at Dhruv Block and cleaning with mild Air blower in the coil side and remove the inside fine filter, cleaned with Soap solution after cleaning process fix in proper place ,check the drianage water tank and cleaned ,replace the communication cables and sensor if found defective all including labour charges for repair and replacememnt of spare parts complete all as specified and directed.Note;-(i) Preventive maintenance each Nos of indoor VRF casette unit shall be meassured as one unit. (ii)Contractor shall be responsible for replacement of false ceiling, if damage occured while servicing of ceiling suspended units. |
| 22 | Material and labour for taking down repair and refixing any type of false ceiling for AC duct after repair/arresting of water leakage with necessary adhesive and accessories etc and making good the disturbed surfaces to match with the existing with out any extra cost complete all as specified and directed. |
| 23 | Material and labour for replacement of thermal insulation of duct with nitrile rubber upto 1sqm of 13mm thick with skilled labour and necessary items complete all as specified and directed.Note :- (i) Any addl nitrile rubber required beyond 1sqm for the repair work, the item will be measured and paid separately under relavent items of this schedule |
| 24 | Supply and fixing of thermal insulation class \\"o\\" nitrile rubber insulation of 13mm thickness with density 45-55 kg/m3,for suction/discharge piping of VRF pipe lines suitable size of dia as per existing ,complete all as speceified and as directed. |
| 25 | Supply and fix in replacement of suitable inverter type fan motor of 16 TR/14TR VRF outdoor unit complete all as specified and directed.Make: Recommended by OEM |
| 26 | Supply and fix in replacement of suitable inverter type fan motor of 18TR / 12 TR VRF outdoor unit complete all as specified and directed.Make: Recommended by OEM |
| 27 | Supply and fix in replacement of indoor inverter fan motor for casette type indoor unit complete all as specified and directed.Make: Recommended by OEM |
| 28 | Supply and fix in replacement of ceiling supended AHU's fan blower with connected items complete all as specified and directed.Make: Recommended by OEM |
| 29 | Material and labour for servicing of existing AHU motor of capacity upto 8HP including fan after disconnecting electric connection from motor terminal and opening the motor cover, re-metalling the bearing housing shaft, replacing with new bearings of existing size, cleaning , re assembling including transportation from existing location to workshop and back, reconnecting ,refixing of blower belt, alignment of blower with motor structural frame work and painting,testing and recommissioning complete all as specified and directed . |
| 30 | Supply and fix in replacement of belt for AHU suitable for VRF unit at diving school complete all as specified and directed.Make: Recommended by OEM |
| 31 | Supply and fix in replacement of indoor PCB for casette type unit of 4TR capacity complete all as specified and directed.Make: Recommended by OEM |
| 32 | Supply and fix indoor sub PCB for casette type unit of 4TR capacity complete all as specified and directed.Make: Recommended by OEM |
| 33 | Supply and fixing in replacement of inverter PCB for VRF outdoor capacity of 10 to 18 HP suitable for out door units complete all as specifieid and as directed.Make: Recommended by OEM |
| 34 | Supply and fixing in replacement of main PCB for VRF outdoor capacity of 10 to 18 HP suitable for out door units complete all as specifieid and as directed.Make: Recommended by OEM |
| 35 | Supply and fixing in replacement of fan PCB for VRF outdoor capacity of 10 to 18 HP suitable for out door units complete all as specifieid and directed.Make: Recommended by OEM |
| 36 | Supply and fixing in replacement of noise filter PCB for VRF outdoor capacity of 10 to 18 HP suitable for out door units complete all as specifieid and directed.Make: Recommended by OEM |
| 37 | Supply and fixing in replacement of Power PCB for VRF indoor capacity of 10 to 18 HP suitable for out door units complete all as specifieid and directed.Make: Recommended by OEM |
| 38 | Material and labour for leak testing of condensor coil, for out door units of VRF unit up to capacity 18 HP including pressure test by using nitrogen gas, brazing/ arresting the leaks all as per OEM recommendation complete all as specified and directed |
| 39 | Supply and fix in replacement of remote control for casette type Indoor unit at VRF system complete all as specified and directed.Make:- Recommended by OEM |
| 40 | Material and labour for servicing to the outdoor unit and indoor unit of precision air conditioning system, cleaning of filters & condenser by using pressure water, clean with mild Air blower in the cooling coil side and servicing the entire unit including repairing, check gas pressure/leakage and rectify if any complete all as specified and directedNote:- Gas will be measured separately under relvant item of this schedule |
| 41 | Supply and fill R-410 gas complete all as specified and directed. |
| 42 | Supply and replacement of catch all core filter as suitable in exisiting pipe line fo VRF suction/discharge line complete all as specified and directed |
| 43 | Supply and fix in replacement of liquid line universal solinoid valve for VRF system complete all as specified and directed. |
| 44 | Supply and fix in replacement of fan blades suilatble for existing out door units VRF systems complete all as specified and directed |
| 45 | Supply and fix in replacement of drain pump for four way casette/CSU units indoor units of VRF unit 4TR/ 5TR including testing complete all as specified and directed |
| 46 | Supply and fix in replacement of hermetically sealed scroll type compressor for existing VRF outdoor unit of 10 Hp to 18 Hp capacity along with gas charging and pressure testing by using nitrogen gas all as per OEM recommendation complete all as specified and directed. |
| 47 | Material and labour for servicing of outdoor unit and indoor unit of casette type air conditioning system of capacity 2 TR , installed at SFNA, including cleaning of filters & condenser coil using pressure water pump and indoor to be serviced by keeping waterproof cover bag with drain outlet and support plates to ensure hygiene of room, indoor unit shall be cleaned by best foam less AC coil cleaner in the cooling coil side and servicing the outer unit with water jet pump, removing the drain pipe and flushing out the drain including repairing, checking of gas pressure/leakage and including replacing minor spares if required for effective functioning of the units and complete all as specified and directed |
| 48 | Material and labour for servicing of outdoor unit and indoor unit of casette type air conditioning system of capacity 4 TR , installed at SFNA, including cleaning of filters & condenser coil using pressure water pump and indoor to be serviced by keeping waterproof cover bag with drain outlet and support plates to ensure hygiene of room, indoor unit shall be cleaned by best foam less AC coil cleaner in the cooling coil side and servicing the outer unit with water jet pump, removing the drain pipe and flushing out the drain including repairing, checking of gas pressure/leakage and including replacing minor spares if required for effective functioning of the units and complete all as specified and directed |
| 49 | Material and labour for servicing of outdoor unit and indoor unit of casette type air conditioning system of capacity 2 TR , installed at ATC Garuda, including cleaning of filters & condenser coil using pressure water pump and indoor to be serviced by keeping waterproof cover bag with drain outlet and support plates to ensure hygiene of room, indoor unit shall be cleaned by best foam less AC coil cleaner in the cooling coil side and servicing the outer unit with water jet pump, removing the drain pipe and flushing out the drain including repairing, checking of gas pressure/leakage and including replacing minor spares if required for effective functioning of the units and complete all as specified and directedNotes for item Nos. 47 to 49:- .Major spare items will be measured and paid separately under relvant items of this schedule. |
| 50 | Notes for item Nos. 17 to 21, 40, 47 to 49:-1. Any minor complaint/ breakdown shall be attended and rectified within 24 hrs. If complaint is not attended and repaired within 24 hrs a penalty of Rs.2000/- per day will be charged.2. Any major complaints/breakdown shall be repaired within 48 hrs. If not attended within 48 hrs a penalty of Rs. 2000/- per day will be charged. weather the complaint is minor or major is decided at the sole descretion of GE/ EIC. Please Enable Macros to View BoQ information |