|
| 1 | Dismantling of the existing pressed tiles clearing away and carefully stacking materials usefull for re-use for any thickness of tiles etc, including cost of all materials, labour charges, scaffolding , lead lift etc., complete. (Roof top area) |
| 2 | Plain cement concrete 1:1.5:3 using 6mm size graded HBG stone including cost of all materials labour, curing charges, scaffolding, lead lifts etc., complete ..(Roof top area) |
| 3 | Chipping of concrete and roughening the surface of the existing ceiling roof plastering and wall plastering clearing away including cost of all materials, labour, lead, lift scaffolding and curing etc., complete. |
| 4 | Plastering with C.M.1:3, 10 mm thick to the ceiling and wall etc including cost of all materials labour, lead, lift, curing and scaffolding etc., complete. |
| 5 | White Washing 2 coats with White cement including cost of all materials labour lead,lift, scaffolding etc., complete.(Ceiling) |
| 6 | Colour washing two coats with best quality of white cement with suitable colour, pigments as directed by the engineer including cost of all materials, labour,lead,lift etc. complete for Inner and outside of the building. |
| 7 | Clear the old paint surface using sand paper, seal the all air cracks and apply two coats (exterior/interior) enamal paint to window grills and ventilators etc including cost of all materials, labour, lead and lift etc, complete. |
| 8 | Providing PVC down fall rain water pipe of 110 mm dia of 6 kg /cm2 ISI make including cost of bend, Elbow and shoe, including cost of all materials, labour, lead, lift, as per standard specification etc., complete Please Enable Macros to View BoQ information |