Bids Are Invited For Safety Relief Valve - Design, Manufacture, Inspection And Supply Of Safety Relief Valve As Per Following Details And Enclosed Specification Sheet For Our Valve Tag No-Kaps-1&2-3335-Rv-5116 Reference- 1. Specification No.: Pc-E-86, Tapi-Gujarat
TDR : 55550393
Tender Notice
BOQ
22 Days Left
Tapi
Gujarat
Bids Are invited for Safety Relief Valve - Design, Manufacture, Inspection And Supply Of Safety Relief Valve As Per Following Details And Enclosed Specification Sheet For Our Valve Tag No-Kaps-1&2-3335-Rv-5116 Reference- 1. Specification No.: Pc-E-86
Design, Manufacture, Inspection and Supply of Safety Relief Valve as per following details and enclosed specification sheet for our valve Tag no-KAPS-1&2-3335-RV-5116 Reference- 1. Specification no.: PC-E-86-Technical Specification On -PHT System Valves (Enclosed) 2. Safety Relief Valve 3335-RV-5116 Specification sheet (Enclosed) 3. Seismic Requirement –OBE & SSE(Both structural integrity & operability as per PP-P-1819 enclosed ) Note- 1. Assembly & Detailed Crossectional drawing is required along with offer 2. QAP and drawing shall be submitted by supplier after PO placement 3. Pre dispatch inspection shall be done as per approved QAP and drawing by NPCIL QS at valve manufacturer site. 4. Two copies of final Technical Documentation consisting such as assembly drawing, Design report, Manufacturing Report ,inspection report ,operation and maintenance manual are required along with supply
Design, Manufacture, Inspection and Supply of Safety Relief Valve as per following details and enclosed specification sheet for our valve Tag no-KAPS-1&2-3335-RV-5116 Reference- 1. Specification no.: PC-E-86-Technical Specification On -PHT System Valves (Enclosed) 2. Safety Relief Valve 3335-RV-5116 Specification sheet (Enclosed) 3. Seismic Requirement –OBE & SSE(Both structural integrity & operability as per PP-P-1819 enclosed ) Note- 1. Assembly & Detailed Crossectional drawing is required along with offer 2. QAP and drawing shall be submitted by supplier after PO placement 3. Pre dispatch inspection shall be done as per approved QAP and drawing by NPCIL QS at valve manufacturer site. 4. Two copies of final Technical Documentation consisting such as assembly drawing, Design report, Manufacturing Report ,inspection report ,operation and maintenance manual are required along with supply
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.