| 1 | Attending minor type misc. works by engaging labor for full day for proper completion of work. (UPPTCL SOR 2023, Item No..-1.07) |
| 2 | 1st class brick (not less than class 150) work in 1: 6 cement and coarse sand (2.0 to 3.2 F.M.) mortar for wall of one brick (230mm) thick in super structure including supply of all material, labour and T&P etc. required for proper completion of work.(UPPTCL SOR 2023, Item No. 6.01+6.08) |
| 3 | 12 mm thick plaster 1:4 cement and coarse sand mortar including cost of all material, labor, T&P etc. complete. ( UPPTCL SOR 2023, Item No..-11.07) |
| 4 | Attending to petty maintenance service like Job attending by 01 no. plumber/welder/ mason/ carpenter with 01 no. helper per hour. ( UPPTCL SOR 2023, Item No..-22.18) |
| 5 | Earth filling under floors and or corporation area including cost of earth obtained with in 8 KM distance outside the corporation’s area and carriage including , loading/unloading, spreading, watering and ramming in 20 cm. layers and dressing of earth etc. Rates including cost of earth, labour, T&P and ROYALTY of earth etc. required for proper completion of work.(U.P.P.T.C.L. S.O.R.-2023, Item No. - 4.10) |
| 6 | Concrete with 4 cm gauge down graded stone ballast, coarse sand (F.M. 2.9 to 3.2) and cement in 12:6:1 proportion in foundation and under floors, including supply of all materials, labour, T&P etc. required for proper completion of work. (U.P.P.T.C.L. S.O.R.-2023, Item No. - 5.02) |
| 7 | C.C. with 20 mm gauge down graded stone ballast, coarse sand (F.M. 2.9 to 3.2) and cement in proportion 4:2:1 including supply of all material, labour, T&P etc. required for proper completion of work. .(U.P.P.T.C.L. S.O.R.-2023, Item No. - 5.06) |
| 8 | Repair of plaster in patches upto one sqm. area including removal of old plaster, cleaning the same thoroughly and racking out joints to 1 cm depth watering the area and then replastering with 1:4 cement and coarse sand mortar and disposal of rubbish outside corporation area including supply of all material, labour, T&P etc. required for proper completion of the work. ( Item No.-11.07+25%) (U.P.P.T.C.L. S.O.R.-2023, Item No. - 20.02) |
| 9 | Hiring charges of welding machine for 8 hrs services in a day or part as per requirement for attending minoor type welding work as and where required as per direction of E/I (Ag. No.-20/EE/2023-24 Dt-27/03/2024, Item No.-84) |
| 10 | M.S. work in heavy size large sections such as trusses, built-up gates, doors & windows frames , roof work, grill or railing, grating T/F rail etc. wrought to required form including supply of steel bolts,nuts,wastage etc. and their fixing charges, drilling holes, welding etc. required for proper completion of work. (U.P.P.T.C.L. S.O.R.-2023, Item No. - 9.01) |
| 11 | 1st class brick (not less than class 150) work in 1:6 cement & coarse sand of (2.90 to 3.2 FM) mortar in foundation and plinth including the supply of all material, labour and T&P etc for proper completion of work(U.P.P.T.C.L. S.O.R.-2023, Item No. - 6.01) |
| 12 | Providing barbed iron wire fencing including fixing it to post after stretching it including cost of all labour, materials, T&P etc. required for proper completion of work excluding cost of posts. (U.P.P.T.C.L. S.O.R.-2023, Item No. - 9.07) Please Enable Macros to View BoQ information |