|
| 1 | Appendix A-Surveying , Boundary stone laying, Junction Design , Land Acquisition plan, Traffic survey and Topographic Survey |
| 2 | OD284201/2025-2026:Imposing the Field Measurement Books on alignment drawing, preparing LA strip plan with the list of survey numbers, tabulation of LA particulars including buildings and extends of each plot to be acquired as per direction of the Engineer in Charge including all cost of transportation, labour, preparing drawings with sufficient copies, collecting data etc complete. (for a width of 10m) |
| 3 | OD284199/2025-2026:Setting up GTS points (customized concrete pillar) on the project road with respect to known elevation of Pattambi railway station as per the direction of Engineer in Charge including all cost of labour, materials, transportation, collecting data, hire charge of equipment, painting and marking, indicating same in alignment drawing etc complete |
| 4 | 8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting . |
| 5 | OD284202/2025-2026:Total Station Surveying for taking detailing in heavily built up area or in roads with heavy traffic or in thick vegetation for taking ID points of roads centre, road edges, kerbs, drain, compound wall, electric post, trees, CD works, RoW, Gail pipeline bounndary ,Buildings Monuments,Religious structures at an average of 1 per 1Om2 etc for a land width as specified including providing necessary road flags, temporary barricade and caution board etc including all necessary traffic safety measures and processing, preparation of drawings in AUTOCAD with various details in different layers and submission of finished drawings with x, y, z coordinates ensuring all objects, break lines and spot levels, topographic survey data for creation of DTM of the surveyed corridor compactible with road design softwares like MX ROAD, AUTOCAD CIVIL 3D, submission of detailed survey data in MS EXCEL. dxf, .sdr format - and all other relevant data in hard copy and soft copy and as directed by the engineer at site. |
| 6 | 8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces |
| 7 | OD284200/2025-2026:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). Please Enable Macros to View BoQ information |