| 1 | Dismantling of old interlocking tiles........................ Including all complete. |
| 2 | Dismantling cement concrete pavement by mechanical means using pneumatic tools, breakingg to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately. (PWD SOR 2025-26, Chepter-10, Item No.6 ) |
| 3 | Deduction for dismantled interlocking tiles. |
| 4 | Disposal of malba with cartage 8.00 km ….... .. ... ..................... Including all complete. |
| 5 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (PWD SOR 2025-26 Chapter No-06 Item No. 2 Spec. No. 6.1) |
| 6 | 12 mm thick cement plaster with 1:4 cement & coarse sand mortar including plastering upto floor two level. Sl No.- 13.4 |
| 7 | Grandular Sub-base with well Graded Material (Table 400.1) (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis). |
| 8 | CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side fromwork .......................... 1501 (approved Quarri grit) (PWD SOR 2025-26, Chepter-12, SI N0-11). |
| 9 | Proving and laying cement concrete in 1:2:4 with cement, coarse sand and 20mm guage stone aggregate, curing complete, including cost of form work. |
| 10 | RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.10 Spec. No. 5.1). |
| 11 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) |
| 12 | M.S Speciefication Board including painting & writing |
| 13 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |