| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge |
| 2 | Extra Rates for Qunatity of Works, Executed in or Under Foul Position Including Pumping Out Water as required.(Rate as per item No-1 x 25%) |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent designn mix) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (Zone-III) : derived from natural sources: 8 graded sone aggregate 40 mm nominal size derived from natural sources). |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars. |
| 7 | Providing and laying in position ready mixed M-25 grade concrete forreinforced cement concrete work, using coarse aggregate as wall as fine aggregate derived from natural sources and cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc. |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform |
| 12 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion,(i) Single socketed pipes. 110 mm diameter |
| 13 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (Zone-III) : derived from natural sources: 4 graded sone aggregate 20 mm nominal size derived from natural sources). |
| 14 | Empty Bag Filling By Sand Supply And Laying of Sandy Earth Plastic Cement Bags ( Volume 0.035 Cum) Including Cost of Earth Cost of Empty Bags, Labour Stiching with Safely Complete Laying And Placing Complete At the Place of Resoration Of Embankement . |
| 15 | Pumping out water caused by springs, tidal or River Seepage, Briken Water Mains of Drain and the Like. |
| 16 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 17 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, includingloading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 18 | Earth work in embankment in ordinary soil, embankment to be done in 20 cm layers, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden roller or steel rammer and rolling every third or top most layer with power roller or minimum 8 tonne including 1.5 m lift and all lead including cartage of earth by mechanical transportation and all T & P labour etc. required for proper completion or work. (earth shall be arranged by the contractor at his own cost from outside of Noida). Please Enable Macros to View BoQ information |