|
| 1 | Earthwork in F & P in Ordinary soil within initial lead of 50 m and initial lift of 1.5 m including rough dressing and breaking the clods, etc., all complete as per direction of Engineer-in-Charge. |
| 2 | Dismantling & removing cement concrete including the useful materials for reuse & removing the debris with in 50 mt lead. |
| 3 | Conveying the excavated earth by mechnical carriage from the site where it has been deposited after excavation & disposal of the same within 5 km. distance at suitable locations as per direction of Engineer-in-Charge etc. complete. |
| 4 | Supply and filling the F & P with filling sand of approved quality with well watered & rammed including cost, conveyance, royalty & all taxes, etc., complete. |
| 5 | CC(1:4:8) with 4cm size HG Hand Broken metal including hoisting , laying, curing and including all cost, conveyance, royalty & taxes, etc., complete. |
| 6 | M20 with 10mm to 20 mm size HG Crusher Broken chips for RCC works including hoisting and laying, compacting with suitable vibrator, curing and filling the construction joints with bitumen ,including all cost, conveyance, royalty & taxes, etc., complete. |
| 7 | Supplying all materials, labour, T&P for laying Sub-Base in layers not exceeding 100 mm thick, watering and compacting to the required density at OMC with PRR (8-10 tonnes) all complete as per direction of Engineer-in-Charge. |
| 8 | Rigid & smooth centering & shuttering for R.C.C. and C.C. works including false works, dismantling and removing them from the site after casting, curing including cost of materials etc., complete. |
| 9 | Supplying, fitting & placing uncoated HYSD reinforcement including cutting, bending,binding & placing the steel rods as per drawing & technical specifications with cost of binding wire 18 to 20 gauges, etc., complete. work.) |
| 10 | 6mm thick cement plester (1:4) to RCC surface finish smooth including closed deep chiping & slury treatment including all cost conveyance royalty and taxes etc. comp. |
| 11 | Spreading of polythene over the road surface including cost of materials etc., complete. Please Enable Macros to View BoQ information |