|
| 1 | Dismantling B.M. in cement mortar under 3mtr height including stacking the useful materials for re-use & removing the debries away from work site within 50mtr lead (Data for 3.83Cum) |
| 2 | Providing, laying, spreading, and compacting stone agreegate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 8-10 tones PRR to proper gade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of course agreegate, watering and compacting to the required density as per Clause 404 of MoSRT&H Specification for road and Bridge work (4th Revision) UNIT = CUM, Taking Output = 360 cum |
| 3 | Earth work in all kinds of soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. |
| 4 | Filling F&P with sand well watered and rammed. |
| 5 | Supplying All MaterialsC.C (1:4:8) with 4cm size HG CRUSHER BROKEN metal including all cost, conveyance, royalty & taxes, curing, watering etc.complete to work site as per specification approved by the department & direction of E.I.C |
| 6 | R.C.C work of M-20 grade with 20mm & down grade black hard granite (Crusher Broken) chips including hosting and laying all cost, conveyance, royalty & taxes, curing, watering etc.complete to work site as per specification approved by the department & direction of E.I.C (Data For 15 CUm) |
| 7 | Providing & fixing TOR Fe-500 einforcement bars for RCC work of required diameter of approved quality with straightening, cutting, bending. binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost. conveyance and taxes of M.S. Rods or tor steel and binding wires of 18 to 20 |
| 8 | Rigid & smooth centering & shuttering for R.C.C. and C.C. works including false works, dismantling and removing them from the site after casting, curing including cost of materials etc., complete.Plinth Beam |
| 9 | Pillars |
| 10 | Fly ash brick masonry in C.M. (1:6) in founadtion & plinth and super structure using 23cm x 11cm x 8cm brick having crushing strength not less than 75 Kg / cm2 |
| 11 | Painting two coats with weather seal coat over a coat of water bound wall primer. |
| 12 | 16mm thick C:P (1:6) over brick & stone masonry |
| 13 | Supply Fittingand Fixing of all Materials Labour an d T&P all taxes with M S grills including all Cost Conevyeance ,raoyallty Etc. Complete as per Direcetion EIC. |
| 14 | provision of wiring, tube lights,fans etc complete. Please Enable Macros to View BoQ information |