|
| 1 | Providing & fixing 15 x 15 x 90 cm boundary stone of hard stone |
| 2 | Heaping the debris after getting the extraction of Acacia Poles |
| 3 | Collection of 60 Cm Bamboos, reed or Wooden stacks for stacking |
| 4 | Transport of stacks |
| 5 | Digging pits of size 45 x 45x 45 cm in ordinary soil before rain |
| 6 | Digging pits of size 45 x 45x 45 cm in ordinary soil after rain |
| 7 | Transporting charges of Basket cover seedlings from on site Nursery to planting site including loading and unloading charges |
| 8 | Head load Transport of big Basket seedlings to planting sites & distribution up to a lead of 50 Metres (including for casualty replacement 10 %) ie 1590 + 159 |
| 9 | Covering pits, digging planting holes and planting seedlings |
| 10 | First year First weeding (For effective planting area + selective weeding area = 1.44 + 5 Ha )(August) |
| 11 | Making Platform of size 100 cm x 100 cm with 30/2 Cm depth inward slopes |
| 12 | Replacing Casualties using Big Basket seedlings(for planting area ) |
| 13 | For First time, Uprooting of existing invasive species like Acacia, Mangium Seedlings etc by manual means for the entire area of the plantations for assisting natural regeneration where ever necessary |
| 14 | First year Second Weeding(For effective planting area + selective weeding area = 1.44 + 5 Ha ) (October) |
| 15 | For Second time, Uprooting of existing invasive species like Acacia, Mangium Seedlings etc by manual means for the entire area of the plantations for assisting natural regeneration where ever necessary |
| 16 | First year third Weeding(For effective planting area + selective weeding area = 1.44 + 5 Ha )(December) |
| 17 | For Third time, Uprooting of existing invasive species like Acacia, Mangium Seedlings etc by manual means for the entire area of the plantations for assisting natural regeneration where ever necessary |
| 18 | Providing for sign board 6\\" x 4\\" and plantation boards including cost of materials and erecting charges etc, complete |
| 19 | Construction of temporary Shed |
| 20 | Clearing Boundary line to a width of 5.2 metre to prevent the fire |
| 21 | Contractor Profit |
| 22 | Contingencies i |
| 23 | VDA Please Enable Macros to View BoQ information |