| 1 | Providing & fixing 15 x 15 x 90 cm boundary stone of hard stone |
| 2 | Heaping the debris after getting the extraction of Acacia poles |
| 3 | Collection of 60 Cm Bamboo, reed or wooden stakes ( supporting to seedlings for strengthening) |
| 4 | Transport of stakes |
| 5 | Digging pits of size 45 x 45 x 45 Cm in ordinary soil before rain |
| 6 | Digging pits of size 45 x 45 x 45 Cm in ordinary soil after rain |
| 7 | Transporting charges of big basketed seedlings from Central Nursery, Kulathupuzha to planting site including loading and unloading charges 12 trip) average km from nursery to planting area 24 km (8154 + 10% casualities=8970) |
| 8 | Head load Transport of big Basket seedlings to planting sites & distribution up to a lead of 50 Metres (including for casualty replacement 10 %) ie 8154+10% casuality=8970 |
| 9 | Covering pits, digging planting holes and planting seedlings |
| 10 | First year first weeding ( selective removal of Thudali, Eupatorium, Micenea etc.) (May-June) |
| 11 | Making Platform of size 100 cm x 100 cm with 30/2 cm depth inward slopes |
| 12 | Replacing Casualties using Big Basket seedlings |
| 13 | For first time uprooting of existing invasive species like Acacia, Mangium seedlings etc. by manual means for the entire area of the plantations for asisting natural regeneration where ever necessary |
| 14 | First year second weeding ( selective removal of Thudali, Eupatorium, Micenea etc.) (August-September). |
| 15 | For second time uprooting of existing invasive species like Acacia, Mangium seedlings etc. by manual means for the entire area of the plantations for asisting natural regeneration where ever necessary |
| 16 | First year third weeding (selective removal of Thudali, Eupatorium, Micenea etc.)(December -January). |
| 17 | For third time uprooting of existing invasive species like Acacia, Mangium seedlings etc. by manual means for the entire area of the plantations for asisting natural regeneration where ever necessary |
| 18 | Provision for sign board 6\\" x 4\\" and plantation boards including cost of materials and erecting charges etc. complete |
| 19 | Construction of temporary Shed |
| 20 | Clearing boundary line to a width of 5.2 m to prevent the fire (Fire Break) |
| 21 | Contractor Profit |
| 22 | Contingencies i |