| 1 | E/M Work |
| 2 | Repair & maintenance of Machinery works including Consumable |
| 3 | All E&M Work of Intake, Water Treatment Plant including Lake and Outdoor Lighting |
| 4 | All E&M Work of Zonal Pumping Station including Pumping Station Chlorinating Plant and Outdoor Lighting |
| 5 | All E&M Work of Tube Well including Chlorinating Plant and Outdoor Lighting |
| 6 | All E&M Work of SCADA (ZPS + Tube Well + Water Treatment Plant + Intake + MCS) Including Internet, Sim & Telephone Etc. for Scada System of 120 MLD WTP, Intake ZPS, TW and Server at Jal Kal Campus . |
| 7 | Cost for Water Sample analysis in lab with required chemicals, glassware alongwith minor maintenance / replacement of lab equipments. |
| 8 | Replacement of SCADA based istruments, PLC & other equipments etc as per direction given by Engineer Incharge |
| 9 | SITC of High mast pole with LED flood light & necessary cables along with C.C. foundation complete in all respect at WTP & Intake. |
| 10 | Operating Staff for Operation and Watch & ward. |
| 11 | Zonal Pumping Station, Tube Well and SCADA |
| 12 | Intake |
| 13 | Water Treatment Plant |
| 14 | Civil Work |
| 15 | Repair Work for Building Work and Pipeline |
| 16 | 1200 mm. dia BWSC Pipe |
| 17 | 1200-350 mm. dia BWSC Pipe |
| 18 | 200-300 mm. dia DI Pipe |
| 19 | Installation of Glass pannel for Windows, Doors & Ventilators with supply of all materials, labour T&P all complete work. |
| 20 | Repairing of Doors, Windows as changing door handel, stoppers, PVC sheet, Rubber etc. with supply of all materials, labour T&P all complete work. |
| 21 | Apex painting on wall in two coats with supply of all materials, labour T&P all complete work. |
| 22 | Painting of Iron angle as MS Window, Doors, CLF Bridge with supply of all materials, labour T&P all complete work. |
| 23 | First class brick work in 1:6 ratio cement mortar with supply of all materials, labour T&P all complete work. |
| 24 | 12 mm thick plaster in 1:4 ratio with supply of all materials, labour T&P all complete work. |
| 25 | Mild Steel or Iron in plain work with cutting, bending with supply of all materials, labour T&P all complete work. |
| 26 | Reinforced cement concerte in 1:1.5:3 ratio with supply of all materials, labour T&P all complete work. |
| 27 | Cement concerte in 1:2:4 ratio with supply of all materials, labour T&P all complete work.(For Floring in OHT, Penal Room, Meter Room) |
| 28 | Provision for repairing of various Sluice Valve, Air Valve, Scour Valve etc all complete |
| 29 | Repairing of leakage at joint of Down pipe of dia 250 to 600 mm with supply of all materials, labour T&P all complete work as per guidence of Engineer-in-charge. |
| 30 | Cleaning of exposed concrete surface of loose and foreign materials by means of sand blasting with coarse sand and including cleaning with all blast upto a height of 18 M above plinth level. |
| 31 | Provide semi circular drain of 250 mm dia all around the O.H.T. flooring consisting of cement concrete with 20mm gauge approved stone grit, coarse sand, cement in proportion of 1:2:4 including supply of all material, labour, T&P etc. required for proper completion of the work as per direction and satisfaction of Engineer Incharge. |
| 32 | Supply and fixing Mosquito proof jali(Aluminium&SS) in ventilater at O.H.T. including repairing of the ventilator and fixing the same properly including supply of all material, labour, T&P etc. required for proper completion of the work. |
| 33 | Supply & Fixing of New G.I. Pipe Railing ¾\\" (20mm) dia medium class pipe including all material, labour T&P ete. Complete. |
| 34 | Supply & Fixing of M.S. iron for single raw post 50x50x6x1.00m height including of all material, labour T&P etc. complete. |
| 35 | Supply and fixing of Float Type water level indicator of approved quality. Complete set with water gauge wire, pully & ball required for proper completion of the work. |
| 36 | Injection grouting in vertical surface/wall placing and fixing nozzle by drilling machine in tank wall having minimum dia of nozzle 15mm and provide on a regular interval not exceeding 1m including construction joints. Injection of pidicrete AM (Ploymer based on shrinkage high strength grout) admisxed with cement through nozle under pressure by sump @ 250gms per bag of cement sealing the nozzle after frounting with Ploymer product mixed with cement, making tank body in working and seapage free condition. |
| 37 | Supply and fixing of M.S. ladder inside Tank, & supply of all material, labour T&P etc. complete. |
| 38 | Excavation 0-1.5M. Deep In Ordinary Soil. |
| 39 | Construction of following type of road including supply of all material, labour, T&P etc. required for proper completion of work & sorting out and stacking of serviceable material and disposal of unserviceable material upto distance of 50 meter. |
| 40 | C.C. Road |
| 41 | Interlocking Tile Road |
| 42 | Supply of filter media for Rapid Gravity Sand Filter at 120 MLD WTP including cartage, filling in filter bed in proper position and removing old media, labour, T&P etc required for completion of work as per direction of engineer in charge |
| 43 | Mild Steel or Iron in plain work with cutting, bending with supply of all materials, labour T&P all complete work.For Door at Boundary Wall of ZPS Campus |
| 44 | Silt Cleaning of Setlling Basin at intake |
| 45 | Cleaning of settling basin (Earth |
| 46 | Disposal of Surplus Earth |
| 47 | Cleaning of Silt from Lake |
| 48 | Cleaning of Silt from Lake |
| 49 | Disposal of Silt |
| 50 | Algae Cleaning from Inlet Channel. |
| 51 | Cleaning of Algae and other Sus pended material (3x3x30x30=8100) |
| 52 | Making of wire mesh |
| 53 | Cleaning of Clariflocculator, Clear water Reservoir and disposal of sludge from centrifuge at WTP. |
| 54 | Cleaning of CLF (1x3=3) |
| 55 | Cleaning of CWR 5000 KL |
| 56 | Disposal of silt from centrifuge |
| 57 | Maintenance of horticulture work |
| 58 | Horticulture work at WTP |
| 59 | Supply of Presticides |
| 60 | Supply of manures |
| 61 | Supply of Fertilizers |
| 62 | Two skilled mali for cutting designer hedge (2x60=120) |
| 63 | Two skilled labour for tapiary cutting (2x60=120) |
| 64 | Two Labour for watering (2x60=120) |
| 65 | Horticulture work at Intake |
| 66 | Supply of manures |
| 67 | Two skilled mali for cutting designer hedge (2x60=120) |
| 68 | Two skilled Labour for Tapiary cutting (2x60=120) |
| 69 | Two Labour for watering (2x60=120) |
| 70 | Operating Staff |
| 71 | Patrol Man for Raw Water Risingmain (1x60=60) |
| 72 | Patrol Man for Clear Water Feedermain (2x60=120) |
| 73 | Sweepers at WTP/intake (3x60=180) |
| 74 | Attendent for Rest House at WTP & Intake (2x60=120) |
| 75 | Lab Technician (1x60=60) |
| 76 | Sample Collector (1x60=60) |
| 77 | Laboratory Cleaner (1x60=60) |
| 78 | Horticulture supervisor (1x60=60) |
| 79 | Date Entery Operator (1x60=60) |
| 80 | Security Guard Armed (2x60=120) |
| 81 | Security Guard Unarmed (6x60=360) |
| 82 | Supply Of Chemicals- |
| 83 | Poly Aluminium Chloride. |
| 84 | Chlorine Gasius |
| 85 | Poly Electrolite |
| 86 | NaOCl |
| 87 | REPAIRING OF LAKE BUND |
| 88 | Filling of Expension Joint of Lake Bund |
| 89 | Stone Pitching of Intake Bund (Total Running Length of Lake 1986 M. & Average wirth of lake 5.5 M |
| 90 | Barbed wire fencing in one layer/GI Mesh with labour material T&P etc all complete. |
| 91 | Banking with excavated earth in layers not exceeding 15 cm in depth breaking clods. Watering ramming eath layer with mechnical roller, iron hammers and thapies and dressings in embankments such as road flood, Guide Bank inculding supply of all materials, labour t&p etc recquire for total proper completion of the work. as per relevant specification and direction of Engineer inchargem |
| 92 | Filling of Joints stone Pitching with Cement Concret with 1:2:4 ratio inculding supply of all materials, labour t&p etc recquire for total proper completion of the work. & C.C. Bed Repairing |
| 93 | Construction of wall for sedimentation of silt particles mixed in raw water at lake |
| 94 | Construction of 2m high partition wall with supply of all materials, labour T&P all complete work as per guidence of Engineer-in-charge. |
| 95 | Making of 02 Nos. MS Shutter Gate for sump of Pump house (1.5 x 2.0 m) with supply of all materials, labour T&P all complete work as per guidence of Engineer-in-charge. |
| 96 | Construction of Channel in Lake with supply of all materials, labour T&P all complete work as per guidence of Engineer-in-charge. |
| 97 | Height Extention of Boundry wall for safety purpopse of WTP plant |
| 98 | Construction of 2m high brick wall above existing boundry wall at WTP with plaster, 2coats of Apex painting and fencing work at top of wall with supply of all materials, labour T&P all complete work as per guidence of Engineer-in-charge. |
| 99 | Construction of Septik Tank size-2.4 x 1.2 x 2.1m with seepage (Soak pit dia 2.5) with supply of all materials, labour T&P all complete work as per guidence of Engineer-in-charge. Please Enable Macros to View BoQ information |