| 1 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. (D.S.R. 2023, Spec. No. 13.88) |
| 2 | Dismantling of Old Brick Work |
| 3 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift up to 1.50m and lead upto 30m and including filling watering and ramming of excavated earth in to the trenches or into the space between thebuildingand the sides of foundation trenches or into the plinth and removal anddisposal of surplus earthas directedby the Engineer In-charge upto a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) |
| 4 | providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26, Chepter-5, Item No.03 Spec- 4.1 ) |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). (PWDSOR 2025-26 Chapter No-05 Item No. 5.2 Si. No.11) |
| 6 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) |
| 7 | Finishing Wall with Putty approved brand and manufacture and of required shade on undacoreted …......................... All complete. (PWD SOR 2025-26 Chapter No-08 Item No. 31 Spec. New). |
| 8 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacoratedwall surface togive evenshade over @ 1.25 Ltr/10sqm including one coat of primer applid @ 0.75 Ltr/ 10 sqm coat curing and cos to fall material, labour, T&P etc. required for proper completion of work.for two coat. (PWD SOR 2025-26 SNo. 35 New). |
| 9 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (D.S.R 2023-24 S.No. 10.01). |
| 10 | Applying priming coat over new steel and Painting Ist coat over priming coat on steel and other material………………all complete.(PWD SOR 2025-26, 641new+19.29) . |
| 11 | Supply and fixing R.C.C Brench ………………….. All Complete. |
| 12 | M.S Speciefication Board including painting & writing |
| 13 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |