|
| 1 | Tack Coat Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bitumenous surface cleaned with mechanical broom.(As per Analysis). |
| 2 | Bituminous ConcreteProviding and laying bituminous concrete with higher capacity batch type hot mix plant using creshed aggergates of specified graing, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the mix to work site, laying with a hydrostatic paver finisher with senser control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (As per Analysis) |
| 3 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (PWD SOR 2025-26 Chapter No-06 Item No. 2 Spec. No. 6.1) |
| 4 | 12 mm thick cement plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. (PWD SOR 2025-26, Chepter-7, Item No.2 Spec. No. 13.4) |
| 5 | Grandular Sub-base with well Graded Material (Table 400.1) (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis). |
| 6 | Supply & Laying precast concrete blocks (Interlocking Tiles) for paving of thickness 100mm (Compresive strength not less then 30 mpa) Including 25 mm theick local sand Base leveling and dressing of surface to requred level and slope] filling Jointsa With local sand all complete work as speciefied in IS 15658:2006. (PWD SOR 2025-26 Chapter No-12 SI No. 10 New Item) |
| 7 | Supply & Laying precast concrete blocks (Interlocking Tiles) for paving of thickness Grey 80mm (Compresive strength not less then 30 mpa) Including 25 mm theick local sand Base leveling and dressing of surface to requred level and slope] filling Jointsa With local sand all complete work as speciefied in IS 15658:2006. (PWD SOR 2025-26 Chapter No-12 SI No. 10 New Item) |
| 8 | Proving and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work. (PWD SOR 2025-26 Chapter No-05 Item No. 7 spec. No. 4.1) |
| 9 | P/L of hot applied thermoplastic compund 2.5 mm thick including trorising glass beeds @ 250 gm per sam area. Thickess of 2.5 mm in exclusive of surface applied glass beeds etc. …………Including cost of all material, labour, T&P etc. require for proper completion of work as direction by E/I. (PWD SOR 2025-26, Chepter-14, SI No. 02 Morth-803 (8.13). |
| 10 | Suppy & Fixing of pavment Makers (Cat Eye) Type XASTMD-4956-04 Avery Dennison/3-M (USA Make) consisting of ASA plastic housing fitted with tightly aderent plotting compound. The housing shall contain prismatic two glass coverd prismatic reflective face to reflect light I/Call tax. With shanks (PWD SOR 2025-26, Chepter-14, SI No. 05 Morth-804 (8.35). |
| 11 | Solar power road marker (Solar Studs) (Cat Eye) Type XASTMD-4956-04 Avery Dennison/3-M (USA Make) consisting of ASA plastic housing fitted with tightly aderent plotting compound. The housing shall contain prismatic two glass coverd prismatic reflective face to reflect light I/Call tax. With shanks (PWD SOR 2025-26, Chepter-14, SI No. 16 Morth-804.6 (8.35). |
| 12 | Supplying and Planting of different type trees/plants well developed per direction of the officer-in-charge. ………………… including all complete. |
| 13 | Supply and Fixing M.S Iron Tree Guard brought to required shape as necessary of the work ………………… including all complete. (As per Analysis) |
| 14 | Supply and fixing Manak Board ……….. All Complete. |
| 15 | Construction of Silla Patt board using brick work and granite stone…………………. All complete Please Enable Macros to View BoQ information |