| 1 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. (D.S.R. 2023, Spec. No. 13.88) |
| 2 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift up to 1.50m and lead upto 30m and including filling watering and ramming of excavated earth in to the trenches or into the space between thebuildingand the sides of foundation trenches or into the plinth and removal anddisposal of surplus earthas directedby the Engineer In-charge upto a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) |
| 3 | providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26, Chepter-5, Item No.03 Spec- 4.1 ) |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). (PWDSOR 2025-26 Chapter No-05 Item No. 5.2 Si. No.11) |
| 5 | Earth work cutting/ filling in ordinary soil excavation to be in the form regular pits note excluding 0.5M in depth and earth work embankment to be in 20 Cm layers including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance. |
| 6 | Finishing Wall with Putty approved brand and manufacture and of required shade on undacoreted …......................... All complete. (PWD SOR 2025-26 Chapter No-08 Item No. 31 Spec. New). |
| 7 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacoratedwall surface togive evenshade over @ 1.25 Ltr/10sqm including one coat of primer applid @ 0.75 Ltr/ 10 sqm coat curing and cos to fall material, labour, T&P etc. required for proper completion of work.for two coat. (PWD SOR 2025-26 SNo. 35 New). |
| 8 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (D.S.R 2023-24 S.No. 10.01). |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (D.S.R 2023-24 S.No. 10.02). |
| 10 | Planting of Grass……………………. All complete. |
| 11 | Playing Equipments Single slide |
| 12 | Playing Equipments Dubble seesaw |
| 13 | Playing Equipments Dome climber |
| 14 | Playing Equipments Merry go round |
| 15 | Applying priming coat over new steel and Painting Ist coat over priming coat on steel and other material………………all complete.(PWD SOR 2025-26, 641new+19.29) . |
| 16 | Supply and fixing R.C.C Brench ………………….. All Complete. |
| 17 | M.S Speciefication Board including painting & writing |
| 18 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |