| 1 | ITEM DESCRIPTION / HEADLING |
| 2 | (1) CHANGING OF LEAKAGE 6\\" PIPE APPROX 5 NOS. OF SUBMERSIBLE PUMP MOTOR SET AT 6 PIT SHAFT AFTER MAKING PLACE TO OPERATION CRANE BOOM ON SHAFT MOUTH BY PARTIALLY PORTION CUTTING & REMOVING HEAD FRAME & TRAMER SHED WINCH ETC.AT 6 PIT KCC UNDER,KATRAS AREA.:- DISMANTLING AND LOWERING ONE BIG PULLY WITH SHAFT & BLOCK FROM HEAD FRAME TOP TO SURFACE. (12 HEAD X 03 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 3 | SHIFTING OF MAIN PULLEY OF HEAD GEAR TOP. (12 HEAD X 03 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 4 | PARTLY CUTTING AND REMOVING / LOWERING OF HEAD GEAR TOP PLATE FRAME & REST FIXING. (12 HEAD X 07 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 5 | PARTLY CUTTING AND REMOVING / LOWERING OF BELL BOX PLATFORM & REST FIXING. (12 HEAD X 08 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 6 | BREASING,CROSS MEMBER GIRTER CHANNEL,ANGLE CUTTING & LOWERING & REST FIXING OF HEAD FRAME ONE SIDE. (12 HEAD X 08 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 7 | DAMAGED POWER WINCH ROPE DISMANTLING AND REMOVING TO LOADING POINT. (12 HEAD X 05 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 8 | ONE HAND WINCH WITH ROPE DISMANTLING AND REMOVING TO LOADING POINT. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 9 | DISMANTLING AND REMOVING TRAMER FROM PIT MOUTH. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 10 | ALL DISMATLED PARTS,WINCH GIRDER,ROPE CHANNEL ANGLE PULLEY ETC.LOADING AND UNLOADING TO WORK SHOP KCC. (12 HEAD X 05 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 11 | DISMANTLING AND LIFTING 150 H.P SUBMERSIBLE PUMP MOTOR SET WITH 6\\" PIPE CABLE FROM SHAFT TO SURFACE. (12 HEAD X 05 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 12 | 6\\" PIPE 5 NOS.BRINGING FROM WORK SHOP TO SITE. (10 HEAD X 02 SHIFT) (H/SK-1X502.44+SK-09X434.96) = 4417.08 |
| 13 | SAME 150 H.P SUBMERSIBLE PUMP MOTOR SET LOWERING AND INSTALLATION COMPLETE WITH 6\\" PIPE AND CABLE IN 6 PIT SHAFT. (12 HEAD X 05 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 14 | MAIN HEAD GEAR PULLEY FIXING ON PROPER PLACE AT TOP OF HEAD FRAME. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 15 | COST OF DA |
| 16 | COST OF OXYGEN |
| 17 | COST OF ELECTRODE |
| 18 | COST OF NUT BOLT |
| 19 | (2) INSTALLATION OF 3000 GPM PUMP MOTOR SET WITH ELECTRICAL & MECHANICAL AND SUCTION AND DELIVERY 8\\" DIA RANGE APPROX 360 MTR FROM O.C.P SUMP CHAITUDIH TO RIVER SIDE UNDER,KATRAS AREA:- .'8\\" PIPE 60 NOS.TAKING OUT FROM STOCK PLACE TO LOADING POINT AT CHAITUDIH WORK SHOP. (12 HEAD X 06 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 20 | 'SAME 8\\" PIPE 60 NOS.LOADING AND UNLOADING FROM W/SHOP TO OCP LOWER BENCH LOADING POINT. (12 HEAD X 10 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 21 | AGAIN SAME 8\\" PIPE CARRYING BY MANUALLY FROM LOADING POINT TO NEAR SUMP TERNING SITE. (12 HEAD X 10 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 22 | 'CARRYING,LAYING AND JOINTING 8\\" PIPE 240 MTR HORIZONTALLY NEAR SUMP TO LOWER BENCH. (12 HEAD X 10 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 23 | 'CARRYING,MOUNTING AND JOINTING 8\\" PIPE FROM LOWER BENCH TO UPPER BENCH VERTICALLY 120 MTR. (12 HEAD X 10 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 24 | FABRICATION OF 8\\" PIPE BEND 5 NOS. (10 HEAD X 10 SHIFT) (H/SK-1X502.44+SK-09X434.96) = 4417.08 |
| 25 | 3000 GPM PUMP MOTOR SET,SWITCH,STARTER,CABLE ETC.LOADING AND UNLOADING FROM WORK SHOP TO DEP LOADING POINT. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 26 | 'SAME 3000 GPM PUMP MOTOR SET,CARRYING BY MANUALLY FROM LOADING POINT TO NEAR SUMP. (12 HEAD X 03 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 27 | '3000 GPM PUMP MOTOR SET INSTALLATION LEVELING ALIGNMENT COUPLING FITTING ETC. (12 HEAD X 03 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 28 | 'SUCTION PIPE 10\\" DIA,BEND,FOOT VALVE ETC.FITTING WITH PUMP TO SUMP. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 29 | MACHING DELIVERY PIPE WITH PUMP AND N.R VALVE SUCTION VALVE ETC. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 30 | ELECRICAL EQUIPMENT SWITCH,STARTER PLACING AND CABLE LAYING. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 |
| 31 | COST OF DA |
| 32 | COST OF OXYGEN |
| 33 | COST OF ELECTRODE |
| 34 | COST OF NUT BOLT |
| 35 | COST OF R.I CLOTH |
| 36 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |