| 1 | Earth work in filling in ordinary soil excavation to be in the form regular pits note excluding 0.5M in depth and earth work embankment to be in 20 Cm layers including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance.(As per Analysis of Rate) |
| 2 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (PWD SOR 2025-26 Chapter No-06 Item No. 2 ) |
| 3 | Providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size ) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26 Chapter No-06 SI No. 3 Spec. No. 4.1) |
| 4 | Grandular Sub-base with well Graded Material (Table 400.1) (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis). |
| 5 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). |
| 6 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.2) |
| 7 | Supply & Laying precast concrete blocks (ordinary coloured Interlocking Tiles) for paving of thickness Grey 80mm (Compresive strength not less then 30 mpa) Including 25 mm thick local sand Base leveling and dressing of surface to requred level and slope] filling Jointsa With local sand all complete work as speciefied in IS 15658:2006. (PWD SOR 2025-26 Chapter No-12 SI No. 10 New Item) |
| 8 | Supply & Laying precast concrete blocks (ordinary Interlocking Tiles) for paving of thickness Grey 80mm (Compresive strength not less then 30 mpa) Including 25 mm theick local sand Base leveling and dressing of surface to requred level and slope] filling Jointsa With local sand all complete work as speciefied in IS 15658:2006. (PWD SOR 2025-26 Chapter No-12 SI No. 10 New Item) |
| 9 | providing and laying cement concrete in 1:2:4 (1 cement: 2 coarse sand :4 graded stone aggregate 40mm norminal size) including supply of all materials, labour and T&P etc. |
| 10 | R.C.C work providing and laying in position specified grade of reinforcement cement slab concrete including the cost of centering, shuttering, finishing and excluding reinforcement - all work upto plinth level in 1:1.5:3 (1cement: 1.5 coarse sand : 3 graded stone aggrigate 20mm nominal size. (PWD SOR 2025-26, Chapter-5, SI No.10) |
| 11 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) |
| 12 | M.S Speciefication Board including painting & writing |
| 13 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |