| 1 | Scarifying old bituminous road by making 50x50mm furrows criss-cross at 1.0 metre intervals at 45 degree to the center line of the carriageway |
| 2 | Clearing and Grubbing Road Land, Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201., By Mechanical Means, In area of non-thorny jungle |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em |
| 4 | \\"Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For grading I material\\" |
| 5 | Wet Mix Macadam, Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406., By Mechanical Means with all lead |
| 6 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base (Stablised soil baes/Crusher Run Macadam) including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per MoRTH Specification Clause 502. |
| 7 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. |
| 8 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of, Grading - II (26.50 mm (Nominal Size)) |
| 9 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and f, for Grading-II(13 mm nominal size) Bitumen (VG-30) |
| 10 | Interlocking Concrete Block Pavement with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks (measurements shall be made inner to inner side of edge blocks), Category 'A' : Dentated units to key into each other on all four faces Zigzag shape as per IRC:SP:63-2004 |
| 11 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 12 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 13 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:, Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 14 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :, 25 mm thick |
| 15 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). |
| 16 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. |
| 17 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding:, New work (Two or more coats applied @ 3.84 kg/10 sqm). |
| 18 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :, Two or more coats on new work |
| 20 | Scarifying old bituminous road by making 50x50mm furrows criss-cross at 1.0 metre intervals at 45 degree to the center line of the carriageway |
| 21 | Clearing and Grubbing Road Land, Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201., By Mechanical Means, In area of non-thorny jungle |
| 22 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em |
| 23 | \\"Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For grading I material\\" |
| 24 | Wet Mix Macadam, Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406., By Mechanical Means with all lead |
| 25 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base (Stablised soil baes/Crusher Run Macadam) including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per MoRTH Specification Clause 502. |
| 26 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. |
| 27 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of, Grading - II (26.50 mm (Nominal Size)) |
| 28 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and f, for Grading-II(13 mm nominal size) Bitumen (VG-30) |
| 29 | Interlocking Concrete Block Pavement with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks (measurements shall be made inner to inner side of edge blocks), Category 'A' : Dentated units to key into each other on all four faces Zigzag shape as per IRC:SP:63-2004 |
| 30 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em |
| 31 | \\"Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For grading I material\\" |
| 32 | Wet Mix Macadam, Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406., By Mechanical Means with all lead |
| 33 | Interlocking Concrete Block Pavement with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks (measurements shall be made inner to inner side of edge blocks), Category 'A' : Dentated units to key into each other on all four faces Zigzag shape as per IRC:SP:63-2004 Please Enable Macros to View BoQ information |