| 1 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift up to 1.50m and lead upto 30m and including filling watering and ramming of excavated earth in to the trenches or into the space between thebuildingand the sides of foundation trenches or into the plinth and removal anddisposal of surplus earthas directedby the Engineer In-charge upto a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) |
| 2 | providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26, Chepter-5, Item No.03 Spec- 4.1 ) |
| 3 | RCC Work Providing and laying inposition specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work upto plinth level :1:1.5:3 (1cement :1.5 coarse sand: 3graded stone aggregate 20mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.8 Spec. No. 5.1). |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). (PWDSOR 2025-26 Chapter No-05 Item No. 5.2 Si. No.11) |
| 5 | Class-150 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (DSR/ PWD 6.1) |
| 6 | Class-150 Brick work in 1:4 Cement and Coarse sand mortar in Super Structure including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (DSR/ PWD 6.1) |
| 7 | 12 mm thick cement plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate) |
| 9 | Supply & Laying precast concrete blocks (Interlocking Tiles) for paving of thickness 100mm (Compresive strength not less then 30 mpa) Including 25 mm theick local sand Base leveling and dressing of surface to requred level and slope] filling Jointsa With local sand all complete work as speciefied in IS 15658:2006. (PWD SOR 2025-26 Chapter No-12 SI No. 10 New Item) |
| 10 | Finishing Wall with Putty approved brand and manufacture and of required shade on undacoreted …......................... All complete. (PWD SOR 2025-26 Chapter No-08 Item No. 31 Spec. New). |
| 11 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacoratedwall surface togive evenshade over @ 1.25 Ltr/10sqm including one coat of primer applid @ 0.75 Ltr/ 10 sqm coat curing and cos to fall material, labour, T&P etc. required for proper completion of work.for two coat. (PWD SOR 2025-26 SNo. 35 New). |
| 12 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (D.S.R 2023-24 S.No. 10.01). |
| 13 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (D.S.R 2023-24 S.No. 10.01). |
| 14 | Applying priming coat over new steel and Painting Ist coat over priming coat on steel and other material………………all complete.(PWD SOR 2025-26, 641new+19.29) . |
| 15 | Supply and fixing R.C.C Brench ………………….. All Complete. |
| 16 | M.S Speciefication Board including painting & writing |
| 17 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |