| 1 | Dimolishling of old & damaged VRB including Dimolishling of RCC slab brick work of abatment PCC of foundation with its. proper disposal all complete the work as per direction Engineer-in-charge.(A) Dimolishling of brick work |
| 2 | (B) Breaking brick ballast (25mm to 40mm size) 40mm gauge excluding cost of Bricks |
| 3 | Earth work in excavation of foundation in all type of soil with lead up to 30 M lift up to 1.50 M with back filling i/c cost of all meterial Labour T & P etc. required. For proper completion of work. |
| 4 | P/L Cement Concrete 1:3:6 in Foundation with (1 Cement, 3 Coarse sand & 6 Stone aggregate 20mm to 40mm size) including cost of all meterial Labour, T & P etc. required for proper completion of the work. |
| 5 | Centering and Shuttering for R C C work including rent of shuttering material labour and T & P required for proper completion of work for slab and wall |
| 6 | Providing, streghtening, cutting, bending, binding and placing of Tor streel reinforcement, including supply of all required labour and T&P required for proper completion of work as per direction of Engineer-in-charge. |
| 7 | P/L R.C.C. with cement coarse sand and 20 mm gauage approved stone aggregate in the proportion of 1:1.5:3 (1 Cement, 1.5 Coarse sand & 3 Stone aggregate 20mm size) in footings of foundations vertical member and slab etc. excluding supply of reinforcement and its fixing and binding the same but including supply of all materials, labour and tools and plants etc. required for proper completion of the works. As per direction of E/I. Cost of binding wire shall also be included in this Item. |
| 8 | Providing and Laying 150 mm thick brick ballast 25 to 40 mm gauge as filter i/c cost of material labour, T&P etc. all complete the work.(i) Excluding Cost of material |
| 9 | (ii) With material |
| 10 | Brick Work in 1:4 cement and c. sand morter with M-150 Bricks including cost of all material, labour and T&P etc. all Complete the work as per direction of Engineer-in-charge. |
| 11 | 12mm cement plastering in 1:4 single coat rough side of single or half brick wall for interior plastering in single story building finished with even and smooth strokes. |
| 12 | Providing and applying white cement based putty of average thickness 1mm, of approved brand and manufacturer, over the plastered wall surfaceto prepare the surface even and smooth complete. |
| 13 | Finishing walls with the water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all material , Labour & T&P etc. required for proper completion of work. |
| 14 | Supply and fixing 100 mm dia P.V.C spoute pipe i/c all required labour, material and T&P to complete the work. Class-B standard make kisan or equvalant Please Enable Macros to View BoQ information |