|
| 1 | Dismantling of interlocking tiles including stacking of servicable materials and disposale of unservicable materials within a lead of 50 meters as per dircticon of EI/C. |
| 2 | Deduction for dismantled interlocking tiles. |
| 3 | Cartage of malva from site up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. (PWD SOR 2025-26, Chepter-3, Item No. 231a ) |
| 4 | Grandular Sub- base with well Graded Material (A) BY Mix in place method construction of granular sub- base by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with smooth wheelo roller to achieve the desired density complete.(As per Analysis) |
| 5 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). |
| 6 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.2) |
| 7 | Grandular Sub- base with well Graded Material (A) BY Mix in place method construction of granular sub- base by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with smooth wheelo roller to achieve the desired density complete.(As per Analysis) |
| 8 | RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.10 Spec. No. 5.1). |
| 9 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) |
| 10 | M.S Speciefication Board including painting & writing |
| 11 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |