| 2 | Jobs to be done:1. Cabin bonnet denting, welding, setting & Cabin both side new powdan making & Cabin door denting, lining, setting with door lock and handle fitting & Cabin mudguard changing & Cabin farsh repairing both side & front screen glass core repairing & front grill repairing setting and front bumper fitting.2. Back side dalla right and left side new making framing & rusted MS Sheet changing, welding with materials.3. Dalla front & back side new making framing & rusted MS Sheet changing, welding with materials.4. Rear both side mudguard new making, welding and fitting. 5. Dalla Sheet box new making, fitting and welding.6. Back dalla guard new making, fitting and welding.7. Complete vehicle painting (inner & outer) 03 coats.8. Number plate and letter writing.9. Complete electrical wiring repairing with all damage head light , back light, side light, switches, horn and flasher etc. to be replaced.10. Driver & Co-driver sheet new making with rexine & foam changing and fitting.11. Cabin both side door pad new making, glass channel, door bit, door rubber, ceiling, front & rear glass rubber opening & new fitting.12. Lift PTO Pump overhauling, machining with brass pinion 01 set, bearing 04 no, oil seal 01 no etc. to be replaced. Materials/Spares to be replaced:Head light assy. 02 no, Indicator light 04 no, Flasher 01 no, Back light assy. 02 no, Stop light switch 01 no, Emergency light assy. 01 set, Compressor horn assy. 01 set, Back gear siren 01 no, Back gear search light assy. 01 no, Glass channel 01 set, Door bit 01 set, Door rubber 01 set, Front glass rubber 01 no, Rear glass rubber 01 no, Door lock assy. 02 no, Door handle outer 01 no, Door reverse handle 01 no, Glass matine 01 no, Glass handle 02 no, Door kabja bolt 04 no, Looking glass 01 no, Cabin fan 01 set, Front bumper assy. 01 set etc. Repairing work should be completed with all required materials and manpower. |