|
| 1 | Dismantling of rail pole |
| 2 | Dismantling of pipe pole |
| 3 | Transporting of Pole |
| 4 | Erection of Rail Pole with transporting |
| 5 | Erection of pipe Pole with transporting |
| 6 | Providing & erection of stay set |
| 7 | Fabrication & erection of Iron Materials |
| 8 | Providing & fitting of nut, bolt, clamp etc… |
| 9 | Providing & fitting of disc insulator |
| 10 | Providing & fitting of pin insulator |
| 11 | Dismantling of DOG conductor in 3.3KV O/H line 09spanx50mtr.x3wire=1350mtr. |
| 12 | Dismantling of DOG conductor in 440V O/H line 24spanx35mtr.x4wire=3360mtr. |
| 13 | Dismantling of cradle guard 20spanx50mtr.=1000mtr. |
| 14 | Drawing of DOG conductor in 3.3KV O/H line 09spanx50mtr.x3wire=1350mtr. |
| 15 | Drawing of DOG conductor in 440V O/H line 24spanx35mtr.x4wire=3360mtr. |
| 16 | Erection of cradle guard 10spanx50mtr.=500mtr. |
| 17 | Providing & erection of cradle guard 10spanx50mtr.=500mtr. |
| 18 | Providing & fitting of 2 wire bracket |
| 19 | Formation of Jumper |
| 20 | Providing & fitting of shackle insulator |
| 21 | Dismantling of 500KVA transformer |
| 22 | Transporting, shifting & installation of 500KVA transformer |
| 23 | Repairing of A.B.switch |
| 24 | Providing & making of chemical electrode earthpit |
| 25 | Dismantling of A.B.switch |
| 26 | Fabrication & erection of Iron Materials for transformer & AB switch |
| 27 | Providing & erection of bolt nut & clamp for transformer shiting |
| 28 | Erection of A.B.switch |
| 29 | Dismantling & shifting of PVC armoured cable 240sqmm |
| 30 | Laying & hanging of PVC armoured cable 240sqmm |
| 31 | Making of cable lead |
| 32 | Providing & making of heat shrinkable pole mounting epoxy kit |
| 33 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |