| 1 | Providing and placing in position 100 mm thick site-cast, machine-batched and machine-mixed RCC rectangular covers over footpath drains and inspection chambers, using M-30 grade cement concrete, including centering and shuttering, reinforcement with 12 mm diameter Fe-500 grade TMT bars spaced at maximum 100 mm c/c in both directions, neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick, 100 mm wide MS sheet duly painted over priming coat, reinforcement to be welded at edges with MS sheet and providing 2 Nos. 16 mm diameter bars as hooks per 0.60 sqm size of cover for lifting, neat cement punning on the finished surface, and including all costs of materials, labor, cartage, handling, all leads and lifts, complete in all respects as per the direction of the Engineer-in-Charge. The item includes casting cover so as to cover the opening as per requirement of site and as per direction of Engineer-in-charge. |
| 2 | Providing, and placing at site portable octagonal signboard of 900 mm size. The signboard shall be fabricated using ACP (Aluminium Composite Panel) or any other suitable material, with high-intensity prismatic retroreflective sheeting affixed on its surface. The signboard shall be mounted on a vertical post made of M.S. angle section (40 × 40 × 4 mm) with a height of 3650 mm. The post shall be supported on a tyre base or any other suitable stable platform to prevent overturning. The entire assembly shall be self-stable and portable, requiring no fixing to the ground. The contractor shall ensure that the signboard shall be installed at any required location within 30 minutes of identifying a hazardous site condition as per direction of Engineer-in-charge. The item includes all handling, transportation, and shifting of the signboard from one location to another as required during the entire duration of the work. One-time payment shall be made for providing and maintaining the signboard from commencement to completion of the project, irrespective of the number of relocations. Upon completion of the work, the signboard shall remain the property of the contractor. |
| 3 | Providing, supplying, and placing at site a portable triangular warning signboard of 900 mm size The signboard shall be fabricated using ACP (Aluminium Composite Panel) or any other suitable material, with high-intensity prismatic retroreflective sheeting affixed on its surface. The signboard shall be mounted on a vertical post made of M.S. angle section (40 × 40 × 4 mm) with a height of 3650 mm. The post shall be supported on a tyre base or any other suitable stable platform to prevent overturning. The entire assembly shall be self-stable and portable, requiring no fixing to the ground. The contractor shall ensure that the signboard shall be installed at any required location within 30 minutes of identifying a hazardous site condition as per direction of Engineer-in-charge. The item includes all handling, transportation, and shifting of the signboard from one location to another as required during the entire duration of the work. One-time payment shall be made for providing and maintaining the signboard from commencement to completion of the project, irrespective of the number of relocations. Upon completion of the work, the signboard shall remain the property of the contractor. |
| 4 | Providing and fixing R.C.C. name board of standard design including painting two or more coats with white zinc paint over priming coat.a) Flat without post for two directions |
| 5 | Lettering with black Japan paint of approved brand and manufacture |
| 6 | Providing, stacking, laying and rolling of cut back based instant bituminous ready mix concrete evaluated and pre tested by any Govt. Lab or institute. The material should be duly packed in 25/50kg and the rates are include cartage,loading, unloading, spreading and compating with rammer/plate vibrator at site of work, all complete as per direction of Engineer-in-charge. |
| 7 | Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineer-in-charge. |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.a) All works upto plinth leveli) Concrete of M25 grade with minimum cement content of 330 kg /cum |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.a) Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 11 | a) Suspended floors, roofs, landings, balconies and access platform |
| 12 | b) Edges of slabs and breaks in floors and wallsi) Under 20 cm wide |
| 13 | Providing and fixing in position SFRC manhole cover and frame of required shape and approved quality. The cover shall be have the markings engraved as RMD-3/DDA/Year of manufacture all complete as per the direction of Engineer-in-charge.a) Circular shape 560 mm internal diameter(HD-20) confirming to IS :12592 |
| 14 | Providing and fixing in position SFRC manhole cover of required shape and approved quality. The cover shall be have the markings engraved as RMD-3/DDA/Year of manufacture all complete as per the direction of Engineer-in-charge.a) Circular shape 560 mm internal diameter(HD-20) confirming to IS :12592 |
| 15 | Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50mx2.00m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube posts/horizontal members/bracings covered with 1.63mm thick MS sheet. The sheet shall be fixed with 30x5mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5m. MS channel ISLC 75 @ 5.70 kg/m, 50cm long shall be provided at the bottom having oval shaped holes of size 50x25mm at both ends with 50cm long MS angle 40x40x6mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250mm long expansion fasteners at both ends. The work shall be executed as per drawing/direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion.Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineerin- Charge.(Note :- One time payment shall be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work). |
| 16 | Providing round-the-clock supervisory services for watch and ward of drain covers, sewer manholes, and road potholes within the jurisdiction of RMD-3 by deploying a neatly dressed supervisor on motorcycle. The supervisor shall be deployed in 8-hour shifts and shall carry all necessary valid documents for both the bike and rider. The deployment shall include items such as torch, safety gear, and other necessary safety equipment.The supervisor shall be equipped with an Android or equivalent smartphone having a valid internet connection/mobile data to promptly report any incidents such as damaged or stolen covers/frames, hazardous locations, or potholes on roads to the Engineer-in-charge.The item includes hiring and running charges of the motorcycle up to 60 km per shift, inclusive of fuel, wear and tear, maintenance, insurance, and all other statutory requirements all complete as per the directions of engineer-in-charge. (One job means 8 hours’ duty). The rate for above cited item is inclusive of cost of all activities as mentioned above and nothing extra shall be paid. |
| 17 | 12 mm cement plaster of mix:1:6 (1 cement: 6 coarse sand) |
| 18 | Providing and placing 750mm heigh road traffic cones with chain and hooks etc. all complete as per direction of Engineer-in-charge. The contractor shall ensure that the signboard shall be installed at any required location within 30 minutes of identifying a hazardous site condition as per direction of Engineer-in-charge. The item includes all handling, transportation, and shifting of the cones from one location to another as required during the entire duration of the work. One-time payment shall be made for providing and maintaining the cones from commencement to completion of the project, irrespective of the number of relocations. Upon completion of the work, the cones shall remain the property of the contractor. |
| 19 | Total =1,62,06,634.40 |
| 20 | Total after GST multiplication factor @ 0.973 ₹ 1,62,06,634.40 =₹ 1,57,69,055.27 |
| 21 | Add cost index @ 4.03% on ₹ 1,57,69,055.27 =₹ 6,35,492.93 |
| 22 | Note: A1. Temporary safety measures, including proper barricading and placement of warning/stop signboards, shall be implemented within 30 minutes of reporting of any incident ( e.g. missing of manhole cover etc.) These measures shall remain in place until permanent repair or replacement is completed.2. The response time for high-risk hazards such as open manhole covers, road potholes, or similar dangerous conditions shall not exceed 4 hours from the time of reporting In case the supervisor/contractor fails to take necessary action within the stipulated time limits, a penalty of ₹50,000 per incident shall be imposed.3. In the event of any non-fatal accident occurring due to contractor’s negligence, a penalty of ₹3,00,000 per incident shall be imposed. In case of any fatal accident, a penalty of ₹30,00,000 or as specified in the previlant labour laws (whichever is higher) shall be imposed per fatality , along with debarment from DDA as per applicable rules.The contractor shall deposit Bank Guarantee(BG) of Rs 30,00,000/- in advance to DDA issued by schedule bank on account of compensation advance.4.The contractor is required to maintain a Daily Inspection Register for all drain/sewer inspection chamber / manholes and update it regularly on day to day basis. The same shall be submitted on a weekly basis to the department for review, failing which a penalty of ₹50,000 shall be imposed by the department per week.5. Layout plan comprising of sewer line /Drain / manhole cover/inspection chamber location shall be provided by the Department to the contractor.6. All sewer/drain cover openings shall be temporarily covered within one day and permanently covered within 60 days from the date of award of work, in the sequence as decided by the Engineer-in-Charge.Failure to comply shall attract a penalty of ₹10,000 per day.7. The cover shall bear an engraved marking indicating the name of the agency, year, and division, as decided by the Engineer-in-Charge.Note :BIt is hereby stated that the conditions mentioned in the above Note A are only in brief. The detailed terms and conditions shall be as specified in the Notice Inviting Tender (NIT). All bidders are advised to carefully read and understand the complete provisions of the NIT before submitting their tender. Please Enable Macros to View BoQ information |