| 1 | EXCAVATION OF POLE PITS / Stay Set: |
| 2 | For pole upto 8.00m length by using JCB/Manual |
| 3 | For pole above 8.00m length by using JCB/Manual |
| 4 | In Hard Soil (common to all size of poles) |
| 5 | In rocky area (common to all size of poles) by blasting / Manual |
| 6 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual |
| 7 | Excavation & back filling of stay pit per location - Hard rock requires blasting |
| 8 | Excavation & back filling of stay pit per location - Hard rock without blasting |
| 9 | Excavation & back filling of stay pit per location - Medium rock and dense medium rock requires blasting |
| 10 | ERECTION OF POLES AND ACCESSORIES |
| 11 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 12 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 13 | Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles |
| 14 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
| 15 | Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. |
| 16 | Erection of stay set complete in the rock area by blasting |
| 17 | Replacement of stay rod only. (Including stay pit excavation & refilling & erection) |
| 18 | Replacement of guy shackle only in existing stay |
| 19 | Fixing of Line Materials |
| 20 | V cross arm 3.5 feet |
| 21 | V cross arm 4.5 feet |
| 22 | V cross arm 5.0 feet |
| 23 | Fixing of LT S phase cross arm |
| 24 | Fixing of LT 3 phase cross arm |
| 25 | Fixing of HT / LT Ti fitting |
| 26 | Fixing of HT PIN insulator with Pin 11 kv |
| 27 | Fixing of HT PIN insulator with Pin 22 kv |
| 28 | Fixing of HT PIN insulator with Pin 33 kv |
| 29 | Fixing of LT PIN insulator |
| 30 | Fixing of HT strain disc 11 KV |
| 31 | Fixing of HT strain disc 22 KV |
| 32 | Fixing of HT strain disc 33 KV |
| 33 | Set right of all sizes of leaning poles (cut point) |
| 34 | Set right of all sizes of leaning poles (pin point) |
| 35 | Fixing of shackle |
| 36 | Fixing of Aluminium knob |
| 37 | Fixing of HT LAS (3 Nos.) |
| 38 | Fixing of LT LAS (3 Nos.) |
| 39 | Double channel-X-Arm |
| 40 | Guarding Cross Arm |
| 41 | Tapping Channel Cross Arm |
| 42 | Fixing of open type fuse unit |
| 43 | Providing of line spacers in LT lines 1 phase |
| 44 | Providing of line spacers in LT lines 3 phase |
| 45 | Fixing of LT capacitor |
| 46 | STRINGING OF CONDUCTORS: |
| 47 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 48 | Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor |
| 49 | Paving and stringing of conductors of one run of PVC cable line of all sizes with GI wire and reel insulator. |
| 50 | Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor |
| 51 | Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor |
| 52 | Releasing and reerection (resagging) of one run of upto 7/3.15 conductor |
| 53 | Releasing and reerection (resagging) of one run of above 7/3.15 conductor upto DOG conductor |
| 54 | ERECTION OF DISTRIBUTION TRANSFORMERS: |
| 55 | Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. |
| 56 | Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. |
| 57 | (i) Upto 25 KVA Distribution transformer / Metering set. |
| 58 | (ii) Above 25 KVA to 100 KVA |
| 59 | (iii) Above 100 KVA to 250 KVA |
| 60 | (iv) 500 KVA and above |
| 61 | Erection of Failed Distribution Transformer including loading of Distribution Transformer at stores and erection at structure. |
| 62 | (i) Failed DT replacement below 100 KVA |
| 63 | (ii) Failed DT replacement 100 KVA and above |
| 64 | Erection of 11 KV / 22 KV single pole Structure including erection of DT complete without centre support |
| 65 | Erection of 11 KV / 22 KV Single Pole structure including erection of DT complete with centre support |
| 66 | DT Metering Arrangements - Whole Current Meter (including fixing of DT Meter Box) |
| 67 | DT Metering Arrangements - LTCT Meter (including fixing of DT Meter Box) |
| 68 | ERECTION OF DP STRUCTURE: |
| 69 | Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., |
| 70 | (i) With 11 KV AB switch using all types of poles of size 9.14 m and above length |
| 71 | (i) With 22 / 33 KV AB switch using all types of poles of size 9.14 m and above length |
| 72 | Erection of single pole DP with complete and with single earth |
| 73 | CONCRETING WORKS: |
| 74 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) |
| 75 | (i) Mass concreting of poles (2'x2'x3') |
| 76 | (ii) Sleeve concreting (2'x2'x3') |
| 77 | (iii) Stay concreting (1.5'x1.5'x3') |
| 78 | EARTHING: |
| 79 | (i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 80 | (ii) Provision of spike including earthing arrangement |
| 81 | (iii) Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length |
| 82 | (iv) Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination |
| 83 | (v) Replacement of corroded earth pipe |
| 84 | LOADING AND UNLOADING CHARGES: |
| 85 | Loading or unloading of Distribution Transformer |
| 86 | (i) Upto 100 KVA |
| 87 | (ii) Above 100 KVA and upto 500 KVA |
| 88 | Loading of various sizes of poles |
| 89 | (i) REC, RCC, PSC pole upto 8.00 m length |
| 90 | (ii) All REC, RCC pole above 8.00 m length |
| 91 | (iii) Metal poles all sizes |
| 92 | (iv) RSJ Pole for centre support DT |
| 93 | Unloading of various sizes of poles |
| 94 | (i) REC, RCC, PSC pole upto 8.00 m length |
| 95 | (ii) All REC, RCC pole above 8.00 m length |
| 96 | (iii) Metal poles all sizes |
| 97 | (iv) RSJ Pole for centre support DT |
| 98 | Loading of Conductor |
| 99 | Unloading of Conductor |
| 100 | Loading / Unloading of Iron & Steel |
| 101 | Loading / Unloading of line materials |
| 102 | Loading / Unloading of 11 KV / 22 KV / 33 KV strain disc |
| 103 | Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
| 104 | Loading / Unloading of meters |
| 105 | (i) Single Phase Meter |
| 106 | (ii) Three Phase Meter |
| 107 | Guarding Arrangement |
| 108 | Provision of guarding with two numbers earth pits excluding stay set erection |
| 109 | (i) Flat guarding with earth pit |
| 110 | (ii) Split neutral |
| 111 | TRANSPORTATION CHARGES: |
| 112 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 113 | Transportation of all type of poles by bullock cart or other vehicle |
| 114 | (i) For a lead upto 5 KM |
| 115 | (ii) Above 5 KM of lead of every KM |
| 116 | Transport of Metal pole of all sizes by head loads in hill areas from road side to pole pit location |
| 117 | (i) Upto 1 KM |
| 118 | (ii) Above 1 KM per each KM |
| 119 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 120 | (i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 1 Tonne by engaging Transport vehicle |
| 121 | (ii) Transporting of Distribution Transformer / Line materials from stores to office / site above 1 Tonne by engaging Transport vehicle |
| 122 | Transporting of Distribution Transformer / Line materials from stores to office / site above 1 Tonne by engaging Transport vehicle above 10 KM |
| 123 | Dismantling Charges |
| 124 | Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit |
| 125 | For breaking the mass concrete of all supports |
| 126 | Dismantling of stay set complete |
| 127 | (i) including stay rod |
| 128 | (ii) Without stay rod |
| 129 | Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
| 130 | Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
| 131 | Dismantling of Double Pole Transformer structure materials complete set and transporting the same from the location to the road side |
| 132 | Dismantling of Single Pole Transformer structure materials complete set and transporting the same from the location to the road side |
| 133 | Dismantling of Cross arm clamps TI fitting hardwares, insulators etc., |
| 134 | Dismantling of Double Channel X-Arm |
| 135 | Dismantling of Guarding Cross Arm |
| 136 | Dismantling of Tapping channel x arm |
| 137 | Dismantling of 11kv PIN with insulator |
| 138 | Dismantling of 11kv Composite Disc with Mp |
| 139 | Dismantling of 22kv PIN with insulator |
| 140 | Dismantling of 22kv Composite Disc with Mp |
| 141 | Dismantling of 33 KV Pin Insulator |
| 142 | Dismantling of 33 KV Disc |
| 143 | Dismantling of 5' V-X Arm |
| 144 | Dismantling of 1372 mm (4'6\\") V-X-Arm |
| 145 | Dismantling of 1068 mm (3'6\\") V-X-Arm |
| 146 | Dismantling of H.T/L.T. T.I. Fitting |
| 147 | Dismantling of 3ph X -Arm |
| 148 | Dismantling of 1ph X -Arm |
| 149 | Dismantling of Aluminium knob |
| 150 | Dismantling of LT Shackle with Mp |
| 151 | Dismantling of LT Pin with Insulator |
| 152 | Dismantling of LT open type |
| 153 | Dismantling of Top channel |
| 154 | Dismantling of Belting channel |
| 155 | Dismantling of Bed channel |
| 156 | Dismantling of metering set 11 KV / 22 KV / 33 KV |
| 157 | Dismantling of DT below 200 KVA |
| 158 | Dismantling of DT 200 KVA & above but below 500 KVA |
| 159 | Dismantling of DT 500 KVA |
| 160 | Dismantling of HT LAS (3 nos) |
| 161 | Dismantling of LT LAS (3 nos) |
| 162 | Dismantling of guarding arrangement - Flat guarding |
| 163 | Dismantling of guarding arrangement - Split neutral guarding |
| 164 | Dismantling of Integrated DT Metering Arrangements / Whole Current Meter / LTCT / HT Meter |
| 165 | Dismantling of Modem including accessories |
| 166 | PAINTING: |
| 167 | Painting of distribution transformer of all capacities (paint to be supplied by the Board) including cleaning of DT |
| 168 | Numbering of poles including base painting and with cost of paint |
| 169 | Painting of iron poles up to 36 ft length with double coats including cost of paint |
| 170 | Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint |
| 171 | Painting of Cement poles by Distember coating including cost of distember |
| 172 | Painting of Double Pole structure materials with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department) |
| 173 | Painting of all clamps, other materials of Single Pole structure and painting of structure pole. |
| 174 | Service Connection Details painting |
| 175 | MISCELLANEOUS WORKS |
| 176 | Fixing and Dismantling of Single Phase Meter |
| 177 | Fixing and Dismantling of Three Phase Meter |
| 178 | Releasing and erection 1 ph SC wire [during conductoring or pole change] |
| 179 | Releasing and erection 3 ph SC wire [during conductoring or pole change(Non-CT)] |
| 180 | Releasing and erection 3 ph SC wire [during conductoring (With CT)] |
| 181 | Releasing and erection 3 ph SC wire [during pole change(With CT)] |
| 182 | Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe ) |
| 183 | Re-Earthing of structure completely |
| 184 | Provision of Street light with switching arrangement including fixing of meter, wiring & service board etc., |
| 185 | Cutting of Flat per cutting |
| 186 | Cutting of channel per cutting |
| 187 | Cutting of Angle per cutting |
| 188 | Cutting of pipe per cutting |
| 189 | Destruction of pole concreting at site |
| 190 | Retrieving grill from Deteriorated RCC pole |
| 191 | Fixing of Modem including accessories |
| 192 | Fixing of Name Board |
| 193 | Fixing of Danger Board |
| 194 | Engaging Machines for Works |
| 195 | Engaging Crane per Hour (for handling of poles, Metering set,DT etc) |
| 196 | Engaging Crane from next Hour onwards (for handling of poles, Metering set,DT etc) |
| 197 | Engaging JCB per Hour (for extension works & maintenance works etc) |
| 198 | Engaging JCB from next Hour onwards (for extension works & maintenance works etc) Please Enable Macros to View BoQ information |