| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: 113 ENGINEER REGIMENT Name of Work : Supply and Construction of 200Mtr Retaining Wall at Ferozepur Contract No: 4160/OT /Retaining Wall/200/26-27 OF 2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SlNo Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Excavating over areas, n exc 1.5 m deep and getting out in hard/dense soil all as specified and directed. |
| 3 | M&L for cement concrete 1:4:8 type D-2 as in foundation fillings and mass concrete complete all as specified . |
| 4 | M & L Formwork to sides concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beam, and similar work vertical or to batter complete all as specified. |
| 5 | M & L Formwork to faces of walls, retaining walls, abutments, parapet and stairecase railings and similar work including attached pillasters, butterssses, etc. vertical or to batter with feir finished surface complete all as specified. |
| 6 | M & L for M-30 (design mix) reinforcement cement concrete in foundations, including raft, footings, foundation beams, plinth beams, bases of columns etc. basement slabs, under reamed piles and mass cincrete complete all as specified. |
| 7 | M & L for M-30 (design mix) reinforcement cement concrete in walls, retaining walls, basements walls, ballast walls and the like, any thickness, above top of footings, including attached pilasters and buttresses complete all as specified. |
| 8 | M & L for mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified. |
| 9 | S&F for PVC (SWR) 110mm pipes complete all as specified. |
| 10 | Returning, filling in (soil), including spreading, leveling, watering and well ramming in layers not exc. 25cm |
| 11 | Hand packing (gauge 40 to 80 mm) at back of walls over arches etc. and raising (or lowering) to the required level |
| 12 | Hand packing (any thickness) at back of walls over arches etc. and raising (or lowering) to the required level |
| 13 | Note: In case doubling/duplicancy of BOQ items , the lowest quoted rate shall be applicable for payment. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |