| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: AGE (I) Suryalanka Name of Work: REPAIRS / MAINT OF DIFFERENT TYPE/ CAPACITY OF CENTRIFUGAL / MONOBLOCK/ SUBMERSIBLE MOTOR, PUMP, STARTER AND ALLIED ITEMS AT AF STN SURYALANKA Contract No: AGE (I) / SL / OF 2026 - 27 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of Item of Works Item Code / Make Approximate No. of Units Required UNIT Estimated Rate Addition / Deduction Addition / Deduction Values Currency Conversion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Labour charges for replacement of spares for Pressure Booster pump GT-H-24V of Make Grundfos after disconnecting the inlet and outlet CPVC/GI pipes and reconnecting the same after completion of repairs, setting the required pressure, including replacement of U/s bushes, washers, nuts, bolts, riviting if necessary, any other minor accessories etc and testing complete all as specified and directed.Note: All major spare parts required are measured and paid under relevent item of this BOQ. |
| 3 | KP 35 Pressure Switches |
| 4 | Seal Kit for CM1/35 Module. |
| 5 | Pressure Release 24 Ltr Tank GT-H-24 PN10 |
| 6 | High Speed Motor Re-winding replacement |
| 7 | 32mm UPVC control valve |
| 8 | Supply and fixing 32mm UPVC pipe complete all as specified and directd |
| 9 | Disconnecting electric/water connections and removing Electric motor / pumpset from base plate and transporting to workshop and back after repair, servicing etc and refixing in it's original position, including replacement of U/s bushes, washers, nuts, bolts, riviting if necessary, any other minor accessories etc testing and commissioning complete all as specified and as directed for the following capacity :-Note: all major spares required are measured and paid under relevent item of this BOQ |
| 10 | 20 HP 3 phase |
| 11 | 10 to 15 HP 3 phase |
| 12 | 3 to 0.5 HP 1 phase |
| 13 | M & L for rewinding of induction motor by means of cutting and removing existing burnt out winding completely, cleaning and repair of slots and rewinding with new copper wire of existing gauge and size/turns, varnishing with class B insulation, assembling the motor complete, testing at workshop all as specified and as directed for the following capacity :- |
| 14 | 20 HP 3 phase |
| 15 | 10 to 15 HP 3 phase |
| 16 | 1 HP 1 phase |
| 17 | 0.5 HP 1 phase |
| 18 | S & F in repairs all ball/roller bearings in centrifugal/ monoblock motor and pump of following capacity after taking out broken/wear & tear unserviceable bearing for the following :- |
| 19 | 20 HP 3 phase |
| 20 | 10 to 15HP 3 phase |
| 21 | 0.5 to 1 HP 1 phase |
| 22 | S & F in repairs stainless steel shaft for centrifugal pump of following capacity including rotar assembly after taking out broken/wear & tear/ unserviceable shaft as per the sample & existing type & size for the following :- |
| 23 | 20 HP 3 phase |
| 24 | 10 to 15 HP 3 phase |
| 25 | S & F in repairs impeller in centrifugal pump of following capacity after taking out broken/wear & tear/ unserviceable impeller as per the sample & existing size for the following :- |
| 26 | 20 HP 3 phase |
| 27 | 10 to 15 HP 3 phase |
| 28 | 0.5 to 1 HP 1 phase |
| 29 | M & L for preparation of old painted surfaces of centrifugal pump set of following capacity and applying two coats of paint over a coat of red oxide primer complete and writing of MES/SM No complete all as specified and as directed for the following capacity :- |
| 30 | 10 to 20 HP 3 phase |
| 31 | Attending breakdown/fault in motor or Control panel in 10 to 20 HP motor. The breakdown shall be attended within 24 hrs on receiving of telephonic communication.Note:- Item will include minor spares like thimbles, control wiring, screws, nuts & bolts etc. Major items will be measured and paid separately. |
| 32 | Servicing and decarborising of control panel contolling not more than three motors by opening of control panel accessories including replacing thimbles, lugs, doorlocks, wornout nuts & bolts, burnout wire etc complete all as specified and directed by Engr-in-charge. |
| 33 | S & F in repair 100mm Bronze foot valve with Neoeren seal 'O' ring screwed ends, after taking out old unserviceable foot valve from open well/UG sump conforming to relevant IS-4038 PN 0.2 for the following sizes complete all as specified and as directed :- |
| 34 | S & F in replacement of CI sluice valve, PN 1.6, ISI marked, flanged ends and suitable holes drilled with brass spindle and check nut including rubber gasket 3mm thick nuts, bolts & washers and other necessary machine works as required at site including taking down/removing the unserviceable sluice valve complete all as specified for the following sizes :- |
| 35 | CI 150mm dia |
| 36 | CI 100mm dia |
| 37 | M & L for repairs to 80/100/150mm CI sluice valves refacing, regrinding, repacking stuffing box of sluice valve spindle after cleaning and including re-assembling with 3mm thick gaskets, nuts, bolts, washers and other necessary machine works as required at site complete all as specified and as directed. |
| 38 | Supply and fixing in replacement of CI bend (any type, any radius and angle) tapers any type (striaght bends, increasing or decreasing or double socket etc) Tee pieces single branch, double branch cross (all socket or socket and spigotted/ flanged), collar, caps and plugs all as specified and suitable for tyton rubber joints upto 150 mm dia bore complete all as specified and as directed. |
| 39 | M&L for shifting/transporting of motor and pump from one location to another location after taking out all water/electric connections, transporting the existing motor/pump to store, including bushes, flanges, nuts, bolts, washers etc complete all as speified and directed. |
| 40 | S&F in replacement of SP 6-32 A rating 240V, 10KA 'C' curve MCB complete with connection testing and commissioning. |
| 41 | S&F in replacement of 3 pole 63 Amp rating 240V, 25 KA 'C' curve MCB complete with connection testing and commissioning. |
| 42 | S&F in replacement of 3 pole MNX 32 Amp rating 240V, 25 KA 'C' curve MCB complete with connection testing and commissioning. |
| 43 | S&F in replacement of 5 kVAR power capacitor complete with connection testing and commissioning. |
| 44 | M&L in replacement of Earthing complete with GI Earth Plate electrode 600x600x6mm buried directly in ground earth pit not less than 2.25 mtr below ground level with top edge of the plate not less than 1.5 mtr below ground level, surrounded from all sides with mixture of charcoal and common salt and electrode connected with GI earth lead GI earth strip of rsize 32x6 mm by means of nuts/bolts/ check nuts/ wahers , GI pipe light grade of 40 mm bore as protection pipe, GI Strip of length not more than 7.5 mtr and connected to test point. GI pipe 20mm dia medium grade for watering, funnel with wire mesh, PCC pit and RCC (1:2:4) type B-1 for cover with 8 mm dia bar reinforcement both ways @ 140 c/c including excavation and earth work disposal of surplus soil to a distance not exceeding 50 mtr as shown on electrical plate No 3 of SSR-2009 complete all as specified and as directed. |
| 45 | Supply, laying and testing of Galvanised iron strip 32 x 6mm buried in ground for earthing / Fixed to wall/ floor etc Total in Figures 0.0 0.0 INR Zero Only Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |