| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and for all lift, as directed by Engineer-in-Charge. |
| 2 | All kinds of soil |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 4 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 5 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 7 | Foundations , footings, bases of coloums, etc. for mass concrete. |
| 8 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 9 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 11 | Two or more coats on new work. |
| 12 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 13 | Modified estimated cost after using correction factor on DSR 2023 on account of GST @ 0.973 on DSR items |
| 14 | Less for Cost Index -0.09% on DSR Items |
| 15 | Credit for old dismantle structural steel, IRC Jali, etc. complete as per the direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |